AfterWhat a Bathroom Remodel Costs in Kendale Lakes, FL – and What the Demo Usually Uncovers
A bathroom remodel in Kendale Lakes runs $9,000 to $28,000, and most homeowners here land somewhere in the middle of that range. The reason the spread is so wide isn’t tile choice or vanity style. It’s what’s behind the wall. In a 1970s Kendale Lakes bathroom, the tile you’re ripping out is probably set on a mud bed, and behind it you’re likely to find original galvanized supply lines and cast-iron drain stub-outs that have been corroding since the Ford administration. What you do with those discoveries decides whether your project costs $12,000 or $28,000. Call (844) 834-8961 for a free estimate; our technicians have up to 12 years of experience and we answer the phone with a live person, 24/7.


Why Kendale Lakes Bathroom Budgets Swing So Widely
This is a build-out 1970s and 1980s planned subdivision, which means almost every bathroom we open is original. CBS block walls with stucco, small footprints, and mechanical systems that predate today’s plumbing and electrical code. You’re not remodeling a blank canvas. You’re renovating a structure that has spent forty-plus years absorbing South Florida humidity.
Three discoveries drive cost more than anything else homeowners expect:
- Galvanized supply lines. They corrode from the inside out. By the time water pressure drops or you see rust-tinted water, the pipes are near failure. Replacing the run back to the main during a remodel is far cheaper than opening the wall again later.
- Cast-iron drain sections. Original drains scale and crack. We typically replace the section under the shower pan and tie into sound pipe, because a leak here means tearing out a new floor.
- Electrical code gaps. Bathrooms need GFCI protection and proper ventilation. A 1978 circuit often has neither. Upgrading now keeps you compliant and safe.
None of this is cosmetic, and it’s why an honest estimate in Kendale Lakes has to include an allowance for what demo reveals. Upfront pricing, no surprises – but a real contractor budgets for the hidden infrastructure, not around it.
Waterproofing Is the Line Between a $12,000 Bath and a $28,000 One
Here’s the detail most bids skip. In South Florida, with 60-plus inches of rain a year and relentless humidity, how the shower is waterproofed matters more than anything you’ll see when the job’s done. There are two approaches:
Backer board alone is cheaper. Cement board gets screwed to the studs, tile goes on top, and any moisture that gets behind it stays there. On a CBS wall in this climate, trapped moisture saturates the block. The wall doesn’t just get a cosmetic problem – it holds water. That’s how a failed tile job turns into a $10,000-plus remediation to strip saturated CBS, dry it, and rebuild.
A full liquid-applied membrane system creates a continuous, seamless barrier over the substrate before a single tile is set. Under Florida Building Code, wet areas in this market demand continuous waterproofing done correctly. We don’t offer the shortcut, because the shortcut is what fails.
Shower pans work the same way. In CBS homes, a site-built mud-bed pan is still common in renovation because it lets us slope precisely to the drain and tie into the block substrate – a prefab pan doesn’t conform the same way. The mud-bed method costs more in labor, and it’s the right call here. Wood-framed homes from other parts of the country use a different waterproofing approach entirely, which is why a contractor who mostly works outside South Florida will get this wrong.
This is where Groundwork’s 730-Day Done Right Promise earns its keep. If a tile job fails or a shower leaks within two years, the CBS wall remediation – which can exceed the original remodel price – is our responsibility, not yours. Built to last, backed in writing.

Kendale Lakes Bathroom Remodel Cost Tiers
Three honest levels, with the local ranges we work from. Every project includes upfront pricing and the full Bathroom Remodeling scope.

| Project Type | What’s Included | Typical Cost |
|---|---|---|
| Cosmetic refresh | Fixture swap, vanity, paint, lighting | $5,000 – $12,000 |
| Small bathroom remodel | Tile, vanity, fixtures, minor updates | $5,000 – $12,000 |
| Mid-scope remodel | Full tile replacement, plumbing rough-in, new vanity | $9,000 – $18,000 |
| Walk-in shower installation | Site-built pan, membrane system, tile | $4,500 – $12,000 |
| Tub-to-shower conversion | Demo, drain rework, waterproofing, tile | $3,500 – $10,000 |
| Full gut with plumbing & electrical | All above plus supply/drain replacement and code upgrades | $18,000 – $28,000 |
| Vanity installation | Unit, finish carpentry, hookup | $800 – $3,000 |
For the full breakdown of scope and process, see our Bathroom Remodeling in Kendale Lakes page. We round out every project with trusted material partners – Kohler for fixtures, Quikrete for substrate and setting work – so you’re choosing quality, not just what’s on the shelf.
Common Local Scenarios We Walk Into
The 1979 split-plan bath. Original mud-bed tile, cast-iron drain, and a single vent that doesn’t meet current code. Full gut is usually the only path once the pan comes up.
The “just replace the shower” job. We open the wall and the galvanized stub is weeping. We stop, show you, and price the drain section before re-tiling. No surprise line items later.
The HOA-review project. In the planned sections of Kendale Lakes, exterior work like venting or window changes during a bath remodel can trigger architectural review. We factor approval steps into the schedule so the job doesn’t stall mid-demo.
Because homes here sit right at the pre- and post-Andrew code transition, an older bath often means opening protection and tie-downs are worth checking while walls are open. It’s a small add during a remodel and a big cost to do alone later.
Frequently Asked Questions
A bathroom remodel in Kendale Lakes typically costs $9,000 to $28,000, with small baths at $5,000 to $12,000 and full guts with plumbing and electrical upgrades at the top of the range. The number hinges on what demo reveals behind the walls. Call (844) 834-8961 for an exact quote – estimates are free.
Replacing a shower properly usually costs more up front than a surface repair, but repair rarely lasts in a 1970s CBS home where the waterproofing is already compromised. A patch over failing substrate just postpones the $10,000-plus wall remediation. We’ll tell you honestly which one your bathroom needs before you commit.
Because most bathrooms here are original to homes built in the 1970s and 1980s, so galvanized supply lines, cast-iron drains, and non-GFCI circuits are common once the wall opens. Budgeting a contingency of 10 to 15 percent keeps those discoveries from derailing the project. Call (844) 834-8961 and we’ll walk you through what to expect.
Yes – our live team answers calls 24/7 and can schedule your free estimate and design consult quickly. You’ll get upfront pricing and 0% financing for 18 months, plus $1,000 off projects over $10,000. Call (844) 834-8961 now.
Get a Straight Answer on Your Bathroom Budget
From foundation to finish line, Groundwork Construction Co. of Kendale Lakes handles the plumbing, electrical, waterproofing, and tile under one roof – background-checked, uniformed technicians on every job, backed by our 730-Day Done Right Promise. Call (844) 834-8961 for a free estimate and design consult today.
Written by the team at Groundwork Construction Co. of Kendale Lakes, serving Kendale Lakes, FL.
What Our Customers Say
"He pulled the permits himself, scheduled every sub and ran the inspections. I made one decision a week and otherwise stayed out of it, which is exactly what I was paying for."
- Robert Sullivan"Found unpermitted work by the previous owner once he opened the wall. He stopped, explained the options and what each would cost, and let me decide rather than making it my emergency."
- Marco Castillo"Change orders were written down and priced before the work happened, every single time. No surprise at the end."
- Keisha Robinson