AfterDriveway Replacement Cost in Kendale Lakes, FL: What You’re Really Paying For
Driveway replacement in Kendale Lakes typically runs $5,000 to $14,000, and the number that lands near the top of that range is almost never the one you want. If your driveway is sinking, cracking, or draining toward the house, the slab isn’t the real problem. The sub-base is. Most of the 1970s-80s CBS homes in this subdivision were poured before anyone was testing compaction on fill dirt, and after forty-odd wet-dry cycles that fill has settled however it felt like settling. A true replacement starts with base repair, not a pour. Call Groundwork Construction Co. of Kendale Lakes at (844) 834-8961 for a free estimate and an honest read on which kind of job you’re facing.


Why a Kendale Lakes Driveway Costs More Than a Slab Swap
Here’s the part that gets missed. Kendale Lakes is a fully built-out planned subdivision west of the Turnpike, and the homes here went up through the 1970s and 80s, which means the original driveways were installed years before modern compaction testing became standard practice. Nobody was running a nuclear density gauge on a residential driveway in 1979. The fill under those slabs was often graded by eye, dumped, and smoothed.
That fill does fine for a decade or two. Then South Florida’s wet-dry cycles take over. Heavy summer thunderstorms soak the soil, the dry season pulls moisture back out, and poorly graded fill settles unevenly. You see it as a slab that dips near the garage apron, a crack that runs straight down the middle, or standing water that pools toward the house instead of the street.
What that means for you: a driveway replacement in Kendale Lakes isn’t one job, it’s two. There’s the base work (demolition, haul-away, re-grading, and compaction) and then there’s the pour itself. Skip the base work and you’ve bought a new slab sitting on the same bad foundation, and you’ll be looking at the same cracks in five to seven years. Our technicians, some with up to 12 years of experience, have pulled enough failing driveways out of the ground here to know what a bad base looks like before the demo even starts. If you’d rather see the full range of hardscape options first, the Driveway & Pavers overview is a good place to start.
What Full Driveway Replacement Covers in Kendale Lakes
Upfront pricing means every line item is defined before we break ground, not discovered mid-project. Here’s what a complete replacement actually includes:
- Demolition and haul-away – breaking out the old slab or pavers and trucking the debris off site
- Re-grading and compaction – the base repair, including proper fill and compaction to a testable standard
- Miami-Dade permit – including the grading plan, which we’ll come back to in a moment
- Pour or paver install – the finished surface, formed and finished
- Finish and sealing – the topcoat or sealer that protects the surface from sun and runoff
That’s the whole scope, and the whole scope is what gets priced. Nothing gets tacked on later because the base turned out to be soft or the grading plan required more engineering than expected.
Line-Item Cost Ranges for Kendale Lakes
These are the market rates we work from in this part of unincorporated Miami-Dade. Your exact number depends on square footage, driveway width, and how much base repair the soil demands.
| Line Item | Typical Cost Range |
|---|---|
| Driveway replacement (full scope) | $5,000 – $14,000 |
| Concrete driveway installation | $4,500 – $12,000 |
| Paver driveway installation | $7,000 – $18,000 |
| Asphalt driveway paving | $3,500 – $9,000 |
| Driveway sealing | $250 – $700 |
On any project over $10,000, the current $1,000 off promotion applies, and 0% financing for 18 months is available so the base repair doesn’t have to wait another season.

The Permit Piece Most Homeowners Don’t See Coming
Miami-Dade County has a specific rule that catches people off guard: your driveway replacement can’t redirect stormwater drainage onto a neighboring property or into the public right-of-way. In practice, that means a grading plan often becomes part of the permit package, and a grading plan costs money to produce. It also means the finished slope has to be engineered, not eyeballed.

We handle the permit and the grading plan as part of the project, and we handle the HOA submission too if your section of Kendale Lakes requires architectural review for a material or color change. Switching from asphalt to concrete pavers, or going from gray to a tan finish, will often need board approval first. We submit it as part of project management, not as a separate line item on your invoice. In a subdivision where every lot is already built out and most work touches an existing structure, that administrative piece is half the battle.
One more detail on the material side. South Florida sun and hurricane-season wind-driven rain beat on a driveway surface hard, and cheap finishes show it fast. We work with Belgard pavers and James Hardie products, among others, because a driveway is one of those surfaces where “built to last, backed in writing” has to be true or you’ll be redoing it in a decade.
What the 730-Day Done Right Promise Actually Buys You
A finished slab gets covered by our 730-Day Done Right Promise. If it’s not done right, we make it right. Two full years of coverage matters most on a driveway because it gives you two complete hurricane-season rainy cycles to verify three things: that water drains away from the house, that the slab settles evenly and doesn’t dip, and that the surface holds up to sun and runoff without cracking.
Most contractors warranty a pour for a year, which is right about the time the first real problems show up. Two years means you’ll have lived through at least two wet seasons before the window closes. That’s not a marketing line; it’s the reason we insist on proper base compaction in the first place. A guarantee is only as good as the base under it.
FAQ: Driveway Replacement in Kendale Lakes
Driveway replacement in Kendale Lakes ranges from about $5,000 to $14,000, with the wider range reflecting how much base repair the original fill requires. Homes with soft, unevenly settled sub-base land near the top; a straightforward replacement on solid ground lands closer to the bottom. Call (844) 834-8961 for an exact quote. Estimates are free, and the price you see is the price you pay.
Uneven settling of the fill under the slab is the usual cause, and it’s common on 1970s-80s Kendale Lakes driveways poured before modern compaction testing. South Florida’s wet-dry cycles soak that fill each summer and dry it out each winter, and poorly graded fill moves unevenly. Replacing a slab without fixing the base just repeats the failure. Call us and we’ll tell you which situation you’re in.
Yes. Miami-Dade County requires a permit for driveway replacement, and because the work can’t redirect drainage onto adjacent properties or the public right-of-way, a grading plan is often part of the package. We handle the permit and grading plan, plus any HOA architectural review if you’re changing materials or color. Call (844) 834-8961 and we’ll walk you through what your specific lot needs.
It depends on whether the sub-base has failed. Small cosmetic cracks and surface wear are usually a repair, but cracking, sinking, and drainage problems pointing toward the house mean the base is the problem, and a patch won’t hold. If the base is sound, sealing at $250 to $700 can extend the life of the slab. Call for a free estimate and we’ll give you a straight answer, not the more expensive one.
Get Your Driveway Replacement Priced Right the First Time
Call Groundwork Construction Co. of Kendale Lakes at (844) 834-8961 for a free project estimate and design consult. We answer live, 24/7, and our uniformed, background-checked technicians arrive with a clear scope, upfront pricing, and the 730-Day Done Right Promise behind the finish. For a fuller look at our hardscape work, visit our Driveway & Pavers in Kendale Lakes page, or start at our home page.
Written by the team at Groundwork Construction Co. of Kendale Lakes, serving Kendale Lakes, FL.
What Our Customers Say
"He pulled the permits himself, scheduled every sub and ran the inspections. I made one decision a week and otherwise stayed out of it, which is exactly what I was paying for."
- Robert Sullivan"Found unpermitted work by the previous owner once he opened the wall. He stopped, explained the options and what each would cost, and let me decide rather than making it my emergency."
- Marco Castillo"Change orders were written down and priced before the work happened, every single time. No surprise at the end."
- Keisha Robinson