AfterHow Long Does a Kitchen Remodel Take in Kendale Lakes, FL? The Honest 10-17 Week Answer
A full kitchen remodel in Kendale Lakes takes 10 to 17 weeks from signed contract to final walkthrough: roughly 2 to 4 weeks of HOA architectural review, 2 to 3 weeks of Miami-Dade permit issuance, and 6 to 10 weeks of active construction. The national 6-to-10-week figure you see everywhere leaves out the front-end approvals that govern unincorporated Miami-Dade work. Understanding that split is the difference between a realistic plan and a schedule that collapses in week five. Call (844) 834-8961 and we’ll walk your specific address through the timeline before you commit to anything.


Why the National Timeline Doesn’t Fit Kendale Lakes
Kendale Lakes is a build-out 1970s-80s planned subdivision west of the Turnpike, and nearly every kitchen here is a renovation inside an existing concrete-block tract home, not new construction. That matters for time. When you open walls on a home built at the transition from pre- to post-Andrew code, you find framing, electrical, and sometimes roof-to-wall connections that need upgrading to current Miami-Dade High Velocity Hurricane Zone standards. Add planning that work into the schedule and you’re looking at a different calendar than a generic guide describes.
The second factor is approval sequencing. In unincorporated Miami-Dade, HOA architectural review and county permitting don’t run in parallel. The HOA often wants to see county-approved drawings, and the county wants to see final HOA sign-off before it will release certain inspections. Do them out of order and you sit idle for weeks. Our team runs both tracks in the right order so nothing bottlenecks.
The Real Kendale Lakes Timeline, Broken Down
Here’s how the calendar actually fills out for a typical mid-size kitchen remodel in Kendale Lakes, priced in the $14,000-$45,000 range for most homes in the subdivision:
| Phase | Typical Duration | What Happens |
|---|---|---|
| HOA architectural review | 2-4 weeks | Submittal, neighbor notification where required, board decision |
| Miami-Dade permit issuance | 2-3 weeks | Plan review, separate electrical/plumbing/structural pulls |
| Demo and rough-in | 1-2 weeks | Tear-out, framing corrections, MEP rough |
| Rough inspection | 3-7 days | Separate inspections scheduled separately |
| Cabinet install | 1 week + lead time | KraftMaid semi-custom runs 3-5 weeks from order |
| Countertop template and fab | 10-14 days | Cambria quartz templated after cabinets are set |
| Appliance set and punch list | 1 week | Final connections, walkthrough, corrections |
Add it up and active construction alone runs 6 to 10 weeks on a full remodel. Small kitchen work in the $9,000-$20,000 range can compress toward the low end; a full gut with new layout, island, and moving plumbing lands at the top.

Why Permit Sequencing Stretches Miami-Dade Schedules
Miami-Dade requires separate inspection pulls for electrical, plumbing, and structural work. In a simpler municipal permitting environment, those often coordinate into a single inspection window. Here, each is scheduled through its own queue. Miss one rough inspection and the next phase can’t start until that inspector is available.
Our team handles the permit paperwork, HOA submittals, and inspection scheduling on your behalf. You get a live person on the line 24/7 to check status, not a voicemail box that returns calls two days later. That matters when an inspector’s window shifts and the whole sequence has to be rebooked within hours. Learn more about how we scope and sequence the whole job on our Kitchen Remodeling page.
The Phase Most Remodels Get Wrong: Countertop Fabrication
Stone countertops are the single biggest schedule-killer in South Florida kitchens. Cambria quartz can’t be templated until base cabinets are fully installed and level. From template to install is 10 to 14 days of fabrication time, and none of it can be rushed, no matter how motivated you or your contractor are.

That means countertops always land after cabinets, never in parallel. We sequence cabinet ordering around KraftMaid’s 3-to-5-week lead time on semi-custom so the template happens the week cabinets go in, not two weeks after. Homeowners who skip this step and order countertops “when the kitchen is ready” routinely lose three weeks to the calendar.
Where the Money Sits in the Timeline
Budget affects speed more than most guides admit. A kitchen island installation ($3,000-$10,000) or moving plumbing and gas adds framing and inspection cycles. Backsplash installation ($800-$2,500) is fast once counters are set but sits last for good reason. Cabinet installation ($4,000-$13,000) and countertop installation ($2,000-$6,500) are the line items whose durations drive everything else.
Upfront pricing on our side means the number you see at the start is the number you pay at the end. That includes the 730-Day Done Right Promise backing every job we complete in Kendale Lakes, and it’s why homeowners here can budget the timeline and the dollars together with confidence.
FAQs
A small kitchen remodel in Kendale Lakes typically runs 6 to 10 weeks from start of construction, plus 2 to 4 weeks of HOA review and 2 to 3 weeks of Miami-Dade permit issuance, for a total of 10 to 14 weeks. Small jobs in the $9,000-$20,000 range avoid the plumbing and layout changes that stretch bigger remodels. Call (844) 834-8961 for a specific estimate on your home.
No. Starting demolition before your Miami-Dade permit is issued creates stop-work risk and can void inspections on the back end. In unincorporated Miami-Dade, HOA sign-off often needs to be in hand before the county releases final approvals, so both tracks must be sequenced. We handle the paperwork so your start date isn’t delayed by a missed submittal.
Countertops can’t be templated until base cabinets are set and level, then Cambria quartz or similar stone takes 10 to 14 days to fabricate. That fabrication window can’t be compressed, which is why countertops always land after cabinet install in the sequence. Understanding that gap in advance is what keeps your overall timeline honest.
Remodeling is usually the cheaper path for most Kendale Lakes homeowners, since the $14,000-$45,000 range covers a full kitchen remodel while moving to a larger home west of the Turnpike costs far more once you account for transaction costs and today’s prices. We offer 0% financing for 18 months and $1,000 off projects over $10,000 to make the decision easier. Call (844) 834-8961 to see what fits your budget.
Ready to Lock In a Realistic Date?
If you’d rather have it looked at, Groundwork Construction Co. of Kendale Lakes offers a no-pressure assessment in Kendale Lakes - call (844) 834-8961 for a free project estimate and design consult. We’ll map the HOA review, permit timeline, and construction phase against your specific address so you know exactly when your kitchen will be done.
Written by the team at Groundwork Construction Co. of Kendale Lakes, serving Kendale Lakes, FL.