







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Cabinets & Countertops in Coral Terrace, FL: What the Job Really Involves
New cabinets and countertops in Coral Terrace usually run $14,000 – $45,000 for a full kitchen’s worth, and a straight swap with no layout changes lands in the $6,000 – $15,000 range. Plan on three to five weeks from demo to final caulk, with cabinets arriving two to three weeks after you sign off on the order. Call Groundwork Construction Co. at (844) 834-8961 and we’ll walk your kitchen, measure every wall, and hand you a written line-item estimate before you commit to anything. Upfront pricing, no surprises.
How We Sequence the Work, Day by Day

The order matters more than most homeowners expect. Countertops can’t be templated until cabinets are set and shimmed, and cabinets can’t be set until the walls are flat and the plumbing rough-in is where the drawings say it is. Here’s how the five stages actually run.
Stage 1 – Measure and order (week 1)
We template the room, confirm appliance sizes down to the inch, and lock the cabinet door style, box construction, and finish. You make two decisions here that drive everything downstream: box depth and drawer configuration. Lead time on semi-custom cabinets runs two to three weeks; stock runs days. This is also when we open the walls behind the old cabinets to check what’s there.
Stage 2 – Demo and prep (days 1 – 2)
Old cabinets and counters come out, and the wall surface gets patched and skimmed flat. On Coral Terrace’s 1950s and ’60s block-and-stucco homes we routinely find furring strips shimmed unevenly or plaster that’s let go behind the old boxes. A flat wall plane is what keeps your new cabinets from looking racked. Rough plumbing and electrical get moved here if the layout demands it.
Stage 3 – Cabinet set (days 3 – 5)
Base boxes go in level and plumb, uppers get blocked into studs, and we scribe fillers to the wall so gaps disappear. Crown and light rail go on last. You’ll confirm final hardware placement on day three, because drilling pulls is a one-shot decision.
Stage 4 – Template and fabricate the countertop (days 6 – 12)
A laser template gets taken only after the cabinets are final. Stone fabricators need roughly five to seven business days, and that wait is the longest stretch of the project. You pick edge profile and sink cutout at this stage.
Stage 5 – Counter install and finish (days 13 – 14)
Slabs go down, the sink and faucet get set, seams get epoxied and polished, and we caulk the backs. You do a final walkthrough with us. Most jobs land inside three weeks total.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Options You’ll Actually Choose Between
Cabinet and countertop selection is where homeowners either save thousands or overspend on things they’ll never notice. Here’s the honest trade-off on each.
- Cabinet boxes: Plywood boxes hold screws and shrug off Miami humidity better than particleboard. Particleboard is cheaper and fine in a dry climate; in Coral Terrace, we lean plywood.
- Door style: Shaker and slab are the durable, resale-safe picks. Raised-panel and glazed finishes cost more to refinish later and trap dust in the profile.
- Stock vs. semi-custom: Stock ships in days and fits standard runs. Semi-custom buys you odd widths and better drawer hardware, at a two-to-three-week wait and a premium.
- Countertop material: Quartz (Caesarstone and similar) is non-porous and needs no sealing. Granite is natural and unique but needs annual sealing. Laminate sits at the low end and shows wear at seams.
- Sink and faucet: An undermount Blanco sink with a Moen pull-down faucet is the practical standard here. A farmhouse apron sink forces a cabinet modification and a countertop cutout premium.
What Cabinets & Countertops Cost in Coral Terrace, FL

A typical Coral Terrace kitchen cabinet-and-countertop project runs $14,000 – $45,000. Here’s what each piece of that looks like as a line item.
| Line item | Typical range |
|---|---|
| Cabinet installation | $4,000 – $13,000 |
| Countertop installation | $2,000 – $6,500 |
| Backsplash | $800 – $2,500 |
| Kitchen island | $3,000 – $10,000 |
Five variables push a job to the high end. Room size and cabinet run length come first. Second, whether the layout moves: relocating the sink or range means new plumbing and electrical rough-in, and that alone can add several thousand. Third, wall and floor condition, because Coral Terrace’s older block walls often need re-skimming and re-furring. Fourth, material grade, since quartz and custom doors cost more than laminate and stock. Fifth, whether a permit is triggered, which it is whenever you move plumbing, electrical, or a wall.
A written estimate from us lists cabinet brand and model, countertop material and slab count, sink and faucet allowances, demo, disposal, and labor, all itemized. It doesn’t include appliance purchases, structural wall removal if the layout changes, or unexpected repairs found behind the old cabinets.
See the difference
Before
After
Before
After
Before
AfterWhat Coral Terrace Homes Specifically Do to This Job
Coral Terrace sits in an unincorporated pocket of Miami-Dade between Coral Gables and South Miami, so nearly every project answers to Miami-Dade County’s building code rather than a neighboring city’s. That matters on a job like this: a block bordering Coral Gables can require a Miami-Dade County permit while the house across the street falls under Coral Gables’ stricter design review, and contractors who assume the wrong jurisdiction wind up red-tagged. Most of the housing stock here is 1950s-’60s concrete-block ranch with stucco over lath, and gut rehabs routinely uncover unpermitted prior work and original galvanized plumbing. Year-round humidity means any water damage behind a sink base gets mold remediation folded into the scope. When the kitchen is part of a wider overhaul, that overlaps with our Kitchen Remodeling in Coral Terrace work, and we cover the whole area through our Coral Terrace service page.
Serving Coral Terrace, FL – Our Local Coverage Area
We serve Coral Terrace and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – Cabinets & Countertops in Coral Terrace

Three to five weeks from demo to final caulk, with the countertop template-and-fabrication wait the longest single stretch. Stock cabinets shorten the schedule; semi-custom or a layout change extends it.
You don’t need a permit for a straight swap. You do for anything that moves plumbing, electrical, or a wall, and because Coral Terrace is unincorporated Miami-Dade, that permit comes from the county. We pull it for you and manage the inspection.
Yes. Keeping the sink, range, and walls where they are turns this into a shorter, less costly job and avoids permit triggers. If the layout genuinely doesn’t work, moving a sink is the common exception and we’ll price it as a separate line.
Expect $14,000 – $45,000 for a full kitchen, or $6,000 – $15,000 for a straight swap without layout changes. Call (844) 834-8961 for an exact quote; estimates are free.
Every project carries the 730-Day Done Right Promise: if it isn’t right, we make it right. Homeowners planning a bigger change often pair this with a Garage Conversion ADU in Coral Terrace or a New Detached ADU in Coral Terrace, where the same crew handles the finish carpentry.
Get a Written Cabinets & Countertops Estimate in Coral Terrace
Call Groundwork Construction Co. at (844) 834-8961 and a live person answers, day or night. We’ll schedule a free on-site visit, measure the room, and talk through cabinet grade, countertop material, and layout before you spend a dollar. Our technicians have up to 12 years of experience on kitchens like yours, and the written quote you get is the number you pay. Explore our full Kitchen Remodeling service while you’re planning.
Written by the team at Groundwork Construction Co.












