Garage Conversion ADU in Tamiami, FL: What It Costs and How Long It Takes
A garage conversion ADU in Tamiami typically runs $35,400 to $94,400 and takes 10 to 16 weeks from demolition to final inspection. You’re turning existing square footage under a roof you already own into a permitted, rentable or family-ready living unit, which is why it lands well below the $106,200 – $259,600 range of a ground-up ADU. Most of the work is interior: slab, framing, insulation, electrical, plumbing, and a new door-and-window package that has to hold up to Miami-Dade wind code. Call (844) 834-8961 for a free on-site estimate and we’ll walk the slab with you.
How a Garage Conversion ADU Comes Together, Stage by Stage

Here’s the actual sequence we run in Tamiami, with the decision points that land on you.
Stage 1: Feasibility and permit drawings (weeks 1 – 3)
We measure the garage, confirm ceiling height and slab condition, and check the setback and impervious-surface math on your lot. In this part of the county, that stormwater calculation is often what decides whether a conversion is the cheaper route over a new build. You approve a scope and finish level here. Drawings go to Miami-Dade for review.
Stage 2: Demo and slab prep (week 4)
The overhead door comes out, the existing slab gets scanned for cracks and moisture, and we grind or pour a self-leveling topping if the floor is out of flat. Old drywall, insulation, and any abandoned wiring go to the dumpster. You pick floor finish after this stage, once you’ve seen the slab.
Stage 3: Framing, rough-in, and the building shell changes (weeks 5 – 8)
New partition walls go up. Electrical, plumbing, and mechanical rough-ins run next, then the door and window package gets installed and flashed. This is where wind-rated glazing and the door system you chose at contract get set. Rough inspection happens before anything closes up.
Stage 4: Insulation, drywall, and finishes (weeks 9 – 13)
We insulate with mold-resistant assemblies suited to the humidity, hang and finish drywall, then set cabinets, counters, fixtures, and trim. You’ll make the bulk of your material selections in weeks 5 – 7 so nothing stalls the schedule.
Stage 5: Final inspection and punch (weeks 14 – 16)
The county signs off, we walk the unit with you, and we close the punch list. Every job is backed by the 730-Day Done Right Promise, and most jobs are completed in a single visit once trim and fixtures start going in.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Choices You’ll Make on a Garage Conversion ADU
The finish decisions move the price more than anything else in the build. Here’s what you’ll actually pick between:
- Flooring: Polished concrete runs lowest and handles humidity without swelling. Luxury vinyl plank costs more but gives you a warmer, quieter floor. Tile suits a garage that had moisture issues.
- Door and window package: Impact-rated units carry the biggest upfront cost but satisfy Miami-Dade wind code outright and cut insurance premiums. Standard units with shutters meet code too, but you lose the clean lines and the ease of use.
- Kitchenette: A wet bar with a sink and mini-fridge sits at the low end. A full kitchenette with a two-burner cooktop and 30-inch cabinet run pushes toward the high end. Cabinetry from brands like KraftMaid holds up better than builder-grade in a humid unit.
- Bathroom: A half-bath is cheapest. A three-quarter bath with a walk-in shower adds plumbing runs and waterproofing.
- HVAC: A dedicated mini-split keeps the unit separately metered, which matters if you plan to rent it. Tying into the house system is cheaper but couples the two spaces.
What Garage Conversion ADU Costs in Tamiami, FL

Plan on $35,400 to $94,400 for a garage conversion ADU in Tamiami, FL, with the midpoint landing near $65,000 for a one-bedroom unit with a kitchenette and full bath. Five variables push the number:
- Size of the garage: A 240-square-foot single bay converts for less than a 480-square-foot double bay. Square footage drives framing, drywall, flooring, and finish cost directly.
- Slab and ceiling condition: A cracked or uneven slab needs repair or a topping pour. Low ceiling height can limit shower and closet layouts.
- Relocating plumbing and electrical: Tying into a nearby stack is cheap. Running new lines across the slab adds cost and requires cutting and repouring.
- Material grade: Builder-grade finishes sit at the bottom of the range. Premium cabinets, counters, and impact glazing push toward $94,400.
- Permit scope: A full kitchen and bathroom expand the review and inspection count compared to a studio with a wet bar.
Your written estimate will be line-itemed so you can see each of these. Expect the number you see to be the number you pay, no change-order surprises. What’s sometimes not included: separate utility meters, landscaping restoration, and furniture or appliances beyond what you spec.
See the difference
Before
After
Before
After
Before
AfterWhat Tamiami Homes Specifically Do to This Job
Tamiami’s housing stock is mostly 1960s to 1990s concrete block ranchers and low-rise Mediterranean townhomes, and the garages in that build era show predictable problems. We routinely find cracks in the original slab, garage doors that never sealed well enough to keep humidity out, and undersized electrical panels that a new kitchenette and mini-split will overload. Because Tamiami sits at the western edge of dense Miami-Dade where the subdivisions along SW 8th Street (Calle Ocho) meet the Everglades buffer, the county’s floodplain and stormwater rules apply hard here, and a high water table plus sandy limestone soil means even a small footprint change can trigger dewatering review. The area’s farming past left pockets of arsenic-laden soil that require special handling on any excavation, so we test before we break ground. Storm season adds real rain delays between May and October. If the conversion is part of a full Home Additions & ADU in Tamiami scope, we sequence it so the ADU doesn’t hold up the rest of the build.
Serving Tamiami, FL – Our Local Coverage Area
We serve Tamiami and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – Garage Conversion ADU in Tamiami

Plan on 10 to 16 weeks from demo to final inspection, with most of that time in the permit review and finish stages. Rainy season can add a week or two if the door and window package has to wait. Call (844) 834-8961 and we’ll give you a realistic schedule for your garage.
Yes. Converting a garage to living space requires a building permit and inspections in Miami-Dade, plus a separate review if you add a kitchen. We pull the permits and carry the job through inspection. Call (844) 834-8961 to talk through what your garage needs.
Often yes. A studio with a half-bath and a kitchenette can tie into a nearby stack and existing wall lines, which keeps you at the low end of the $35,400 – $94,400 range. A full bath and kitchen usually require new runs and a larger permit scope. Call (844) 834-8961 for a site walk to find out which you have.
Expect $35,400 to $94,400 depending on garage size, slab and ceiling condition, how much plumbing and electrical moves, finish grade, and permit scope. Call (844) 834-8961 for an exact quote, and estimates are free.
Every conversion we build is covered by the 730-Day Done Right Promise, one of the longest workmanship guarantees in residential construction. If anything isn’t right, we come back and fix it. Call (844) 834-8961 to hear exactly what the promise covers.
Get a Free Estimate for Your Tamiami Garage Conversion ADU
Give us a call at (844) 834-8961 and a live person answers, day or night. We’ll schedule a free on-site estimate, walk your garage, and hand you a line-itemed quote with the permit scope and timeline spelled out. No pressure to sign anything. If you’re weighing the conversion against other work, homeowners often pair this with Concrete Driveways & Concrete Work in Tamiami or Asphalt Driveways & Resurfacing in Tamiami. You can also see our broader Home Additions & ADU work and our full Tamiami service coverage.