Garage Conversion ADU in Olympia Heights: What It Actually Takes
A garage conversion ADU in Olympia Heights usually runs $45,000 to $130,000 and takes 4 to 7 months from permit submission to final inspection. The job turns an existing attached or detached garage into a permitted, separately metered living unit: slab work, framing, insulated walls, a full bath, a kitchenette, electrical, and the county inspections that go with every one of those steps. Call (844) 834-8961 and we’ll walk your garage and give you a written, line-item number.
How we take a garage from storage to a permitted unit, stage by stage

The sequence below is what a real Olympia Heights garage conversion ADU looks like. Timelines assume the county and the homeowner both move without stalling it.
Stage 1: Assessment and design (2 to 4 weeks)
We measure the slab, check the ceiling height against what a habitable room needs, and open the electrical panel to see whether it has room for the new circuits. On a 1950s block home, that panel is often a 100-amp service already carrying more than it should, and the answer is a service upgrade. You decide the layout here: one room or a room plus a sleeping alcove, where the bath sits, whether the kitchenette goes against the existing shared wall. This is also when you choose whether the unit stays part of the main house or gets its own meter.
Stage 2: Permit submission (3 to 6 weeks in unincorporated Miami-Dade)
The plan set goes to Miami-Dade County, not to a city building department, because Olympia Heights is unincorporated. You don’t submit anything: we file, respond to the plan reviewer’s comments, and pull the permit. Plan review is the single biggest variable in the schedule, and a clean set with the structural and energy calcs attached moves faster than an amended one.
Stage 3: Demolition, slab and shell (2 to 4 weeks)
Out comes the garage door, the tracks, the opener, and any old storage framing. We grind and level the slab, pour a curb for the new bath, frame the new walls and ceiling, and close the old vehicle opening. Because the new floor has to sit above the outside grade, we build a raised subfloor or a shallow pour, whichever the slab condition allows. This is the noisiest, dirtiest stretch and the one your neighbors will notice.
Stage 4: Rough-in trades and inspections (4 to 6 weeks)
Plumbing, electrical, and mechanical go in and get inspected before anything gets covered. If the bath drains can’t tie into the house line at a workable slope, this is where a lift pump or a re-routed line shows up and where budgets move. You’ll decide fixture rough locations now; after the drywall goes up, they’re expensive to change.
Stage 5: Insulation, drywall, finishes, final inspection (4 to 6 weeks)
Insulation and drywall go in, then tile, cabinetry, paint, and the mini-split. We schedule the final inspection, hand over the signed-off permit, and walk you through the unit. The contractor’s job ends when the county signs off and the 730-Day Done Right Promise is on paper for the work we did.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The choices that change your number the most
- Slab versus raised floor: Keeping the existing slab is the cheapest path. A raised wood subfloor over sleepers costs more but handles moisture wicking from the slab better, which matters in a humid climate.
- Bath plumbing position: Lining the new bath up with the house’s existing drain stack keeps the job in the low range. A bath on the far side of the garage can add thousands in re-routed drain line and possibly a lift pump.
- Kitchenette grade: A simple sink, two-burner cooktop and a fridge niche is one spec. A full cabinet-and-counter setup with a real range pushes the price toward the high end and can affect the permit scope.
- Cooling: A ductless mini-split is the norm and cheap to run. Tying into the main house air handler only works if the existing system has capacity, which on 1950s stock it usually doesn’t.
- Windows and doors: Any new exterior opening needs Miami-Dade NOA-approved impact product. You’ll pick between aluminum impact windows and impact-rated French or sliding doors, and the spec sheet matters as much as the look.
- Exterior skin: Stucco to match the house is standard here and keeps the unit looking original. Lap siding reads cleaner to some buyers but breaks the streetscape on a block of concrete-block homes.
What Garage Conversion ADU costs in Olympia Heights, FL

Plan on $45,000 to $130,000. Where you land depends on a handful of variables, not on square footage alone:
- Service upgrade: A 100-amp panel that has to be replaced with a 200-amp service can add several thousand to the electrical line.
- Roof: If the garage shares a low-slope roof that’s at the end of its life, you’re replacing it as part of the job. That’s not optional once the ceiling comes open.
- Bath and kitchenette scope: A full bath is the single biggest line item after framing. The further the drains run, the more it grows.
- Finish level: Tile versus vinyl, custom versus stock cabinetry, and fixture grade all sit in the estimate. The difference between a rental-grade and a family-grade unit is real money.
- Permit exposure: A structure that was ever enclosed without a permit, or a carport that was converted informally, means bringing the existing work up to code before the new work can be signed off.
Your written estimate breaks out labor, materials, permit fees, and inspections line by line, and the number you sign is the number you pay. It covers drawings, permit submission, all trades, and final inspection sign-off. It does not cover landscaping, driveway repair where a new utility trench crosses it, or furniture, appliances and finishes you buy separately. $1,000 off applies to this job since it’s over $10,000, and 0% financing for 18 months is available.
See the difference
Before
After
Before
After
Before
AfterWhat Olympia Heights homes specifically do to this job
Because Olympia Heights sits in unincorporated Miami-Dade, every permit for a garage conversion ADU runs through the county, and every window, exterior door and roof section needs Miami-Dade product approval under the wind-borne debris rules. If the garage currently has a flat or low-slope roof, we often find it sitting on undersized or repaired framing, and the plan reviewer will want to see it addressed. The housing stock is mostly 1950s-to-1970s concrete block and stucco along gridded streets, with original single-pane jalousie or aluminum windows and carports that owners have already half-enclosed. That means a fair share of our Olympia Heights garage conversion ADU work starts with legalizing what’s already there before we can frame anything new. Salt air off Biscayne Bay and the June-through-November storm season push us toward mold-resistant drywall and impact-rated product on every opening. If you’re also reworking the driveway where the utility trench will cross, homeowners often pair this with Concrete Driveways & Concrete Work in Olympia Heights to finish the front of the house in one pass.
Serving Olympia Heights, FL – Our Local Coverage Area
We serve Olympia Heights and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently asked about Garage Conversion ADU in Olympia Heights

It typically takes 4 to 7 months from permit submission to final inspection, depending mostly on how long Miami-Dade plan review takes. Call (844) 834-8961 and we’ll give you a realistic schedule for your property.
Yes. An Olympia Heights garage conversion ADU needs a Miami-Dade County building permit and inspection sign-off, and a unit without one will cause problems at resale or refinance. We pull the permit and handle the inspections.
Often, yes, if the new bath lines up with the house’s existing drain stack and the existing roof can carry the ceiling. When those don’t work, we’ll tell you up front what has to move and what it adds to the price.
Most Olympia Heights garage conversion ADU projects land between $45,000 and $130,000. Call (844) 834-8961 for a written, line-item estimate after we walk your garage.
Every garage conversion ADU we build is covered by our 730-Day Done Right Promise: if the work isn’t done right, we make it right, for two full years after we hand it over. That covers the trades we ran, from framing and drywall to the bath and electrical.
If you’re also looking at the bigger picture, this often falls under a larger scope: the Home Additions & ADU in Olympia Heights page covers the wider project, and Olympia Heights shows the neighborhoods we cover across 33165. You can also browse our Home Additions & ADU service hub or, if the front of the house needs attention too, Asphalt Driveways & Resurfacing in Olympia Heights pairs well with a conversion when the trench line has to be cut.
Get a real number on your Olympia Heights ADU
Call (844) 834-8961 for a free on-site estimate. We’ll measure the garage, check the slab, the panel, and the roof framing, and hand you a written line-item quote with permits, inspections and the 730-Day Done Right Promise spelled out. No change orders, no surprises. If you’re in Westchester, Westwood Lakes, Sunset or Fountainebleau, we’ll come out too.