ADU Design & Permitting in Three Lakes, FL: What It Takes to Get Approved
ADU Design & Permitting in Three Lakes, FL means preparing a full set of site-specific drawings and the accompanying permit application for a detached or attached accessory dwelling unit, carrying it through Miami-Dade County plan review to an issued building permit. Plan review and permit issuance typically run 6 to 10 weeks once drawings are complete, and the design-and-permit phase alone usually lands between $8,000 and $22,000 of a finished project that runs $45,000 to $130,000. We handle the drawings and the paperwork, and you make the calls. Call (844) 834-8961 to schedule a free estimate.
How we take an ADU from sketch to a stamped permit in Three Lakes

The plan on your kitchen table isn’t a project until it’s papered and permitted. Here’s the sequence we run, and what you’ll be deciding at each step.
Stage 1: Site and feasibility review (week 1)
The first visit is about what the lot will actually allow. We check setbacks, the utility easement, the existing home’s footprint, and for lakefront properties the drainage and dock limitations that shape where a unit can physically sit. You decide the general size and location before any drawings begin. Getting this wrong is the most expensive mistake in the process.
Stage 2: Concept and schematic design (weeks 2 – 4)
We lay out the floor plan, roofline, door and window placement, and how the unit ties into existing power, water, and sewer. You’ll choose whether it’s a fully independent structure or shares a wall, and whether the plumbing backs up to a wet wall. That single decision can swing the whole project several thousand dollars.
Stage 3: Construction documents and engineering (weeks 4 – 6)
This is where the real drawings get made: architectural sheets, structural calcs for wind load, and energy code compliance. Three Lakes sits in the High Velocity Hurricane Zone, so wind ratings on every connection get engineered, not assumed. You’ll sign off on final specs and materials here.
Stage 4: Permit submittal and plan review (weeks 6 – 12)
We submit to Miami-Dade County and manage the review rounds, including fire, zoning, and drainage comments. Each resubmittal cycle can add one to three weeks, so clean drawings on the first pass matter. You don’t chase this – we do.
Stage 5: Permit issuance and mobilization prep (post-approval)
Once the building permit is issued, we pull the trade permits and coordinate inspection sequencing before a single shovel hits the ground. You’ll have a written line-item scope, a fixed price, and a schedule. From there the build starts clean.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The design and spec choices you’ll actually weigh
Most of the decisions below come up in the first three weeks, and each one has a real trade-off. This isn’t a menu – it’s a set of calls that change your cost and your county review.
- Detached vs. attached: A detached unit gives privacy and rental flexibility but costs more in site work, utilities, and fire separation. An attached unit (often built over a garage) saves on foundation and roof but ties you harder to the existing structure’s condition.
- Concrete block vs. wood frame: CBS block walls match the 1980s – 1990s housing stock and hold up against South Florida humidity and hurricanes. Frame construction is faster and cheaper but rarely wins here on insurance and code.
- Roof style: A flat built-up roof mimics many Three Lakes homes but demands careful drainage detailing. A pitched tile roof reads more like a house but adds structural cost.
- Impact-rated glazing: Non-negotiable in this zone. You’re choosing between impact glass and shutters – impact glass costs more upfront and eliminates the storm-prep scramble. Brands like Andersen and Pella carry product lines engineered for wind ratings.
- Finishes: Level of cabinetry, countertop material like Caesarstone, and fixture grade (Kohler, Moen) all move the number. A rental-grade unit and a family unit want different specs.
- Utilities strategy: Running new electrical service and water lines is a major cost variable. Backing a wet wall up to the existing plumbing can save thousands vs. a fully remote kitchen and bath.
What ADU Design & Permitting costs in Three Lakes, FL

Design and permitting for an ADU in Three Lakes usually runs $8,000 to $22,000 on its own, and the complete project – design, permit, and construction – lands in the $45,000 to $130,000 range depending on size and configuration. For a larger detached unit, total costs can climb toward $220,000.
Here’s what moves that number:
| Factor | Typical Impact |
|---|---|
| Unit size (400 sq ft vs. 1,000 sq ft) | Largest single driver; every square foot adds cost |
| Detached vs. attached | Detached adds site work, foundation, and separate roof |
| Existing utility distance | New electrical, water, and sewer runs can add significant cost |
| Material and finish grade | Rental-grade vs. high-end cabinetry, counters, fixtures |
| Site conditions (slope, drainage, easements) | Lakefront lots and high water table often require extra engineering and drainage |
A written estimate from us includes the drawing set, engineering, permit fees, and a line-item construction scope. It typically doesn’t include HOA approval fees or last-minute design changes after submittal – those get quoted separately if you request them.
See the difference
Before
After
Before
After
Before
AfterWhy Three Lakes homes make this job different
Three Lakes is a planned community built mostly in the 1980s and 1990s around a chain of man-made lakes, so every ADU here sits inside an established, HOA-governed neighborhood with real constraints. Most homes are concrete block (CBS) with stucco, concrete tile or flat built-up roofs, and screened lanais – construction that shapes where a new unit can physically connect. The HOA review often runs parallel to county plan review, and in lakefront corners of the community, dock, seawall, and drainage easement rules shape what you can build near the water. Miami-Dade’s High Velocity Hurricane Zone means every drawing gets wind-load engineering up front, and the high water table means grading and drainage are designed, not assumed. On older lots, original polybutylene plumbing and single-pane windows frequently fail current code on any renovation, so we flag those in the design phase rather than discover them mid-build.
Serving Three Lakes, FL – Our Local Coverage Area
We serve Three Lakes and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently asked – ADU Design & Permitting in Three Lakes

Expect 6 to 12 weeks from first site visit to issued building permit, including plan review. Design and engineering take about 4 to 6 weeks; county plan review adds another 4 to 8 weeks depending on review cycles and comment volume. Call (844) 834-8961 for a timeline based on your specific lot.
Yes – any new ADU requires a building permit from Miami-Dade County, plus separate trade permits for electrical, plumbing, and mechanical work. Lakefront properties that touch drainage or seawall easements may need additional review. We pull and manage every permit as part of the project.
In many cases yes, especially for a garage conversion where existing plumbing is nearby. Backing a new unit up to a wet wall or reusing an existing slab can save a meaningful amount. A feasibility review tells us early whether that’s realistic for your property.
Design and permitting alone usually runs $8,000 to $22,000, and the full project including construction runs $45,000 to $130,000. Larger detached units can reach $220,000. Every project gets a written line-item estimate and fixed pricing, with the 730-Day Done Right Promise behind the work.
The 730-Day Done Right Promise covers workmanship for two full years. If anything isn’t right, we make it right – no fine print, no runaround. Calls are answered by a live person around the clock so questions get resolved fast.
Ready to talk through your ADU?
Call (844) 834-8961 to schedule a free on-site estimate for ADU Design & Permitting in Three Lakes. On that call we’ll confirm your lot’s constraints, walk through size and configuration options, and give you a written line-item estimate before any work starts. Our technicians bring up to 12 years of experience to every project, background-checked and in uniform.