







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Fast, Reliable Home Additions & ADU Across Three Lakes
Most additions and ADUs in Three Lakes don’t stall at the framing stage. They stall at the architectural committee. We build in Three Lakes and we know the two-track approval reality here: HOA architectural review and lake-adjacent drainage-easement review running side by side, then a build calendar set around whichever one clears last. You get a straight answer on cost, a written line-item quote, and a start date that respects the approval clock instead of racing it. Call (844) 834-8961 and we’ll walk your lot and your plans together.
Why Groundwork Construction Co. of Kendale Lakes Is Three Lakes’s Preferred Home Additions & ADU Company

Three Lakes homeowners tend to come to us after a bad first bid. Not a bad price – a bid that never mentioned the submittal packet, then blew the schedule when the committee bounced the elevations. We build the packet as part of the job, not an afterthought. Our technicians have up to 12 years of experience, every project carries the 730-Day Done Right Promise, and calls reach a live person 24/7, not a voicemail box that opens Monday morning.
We work 33186 regularly and know the housing stock: 1980s and 1990s concrete block and stucco, flat tile or built-up roofs, screened lanais, lakefront lots with their own permitting quirks. We quote from the same upfront pricing schedule whether your home sits near the lakes or off Southwest 137th Avenue. No change orders mid-build, no surprise line items when the shell is already open. If a submittal gets comments back, we revise it; that work is part of what you paid for. Because Three Lakes is a planned community, we schedule around the calendar the committee controls, not the one we’d prefer.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Our Home Additions & ADU Services in Three Lakes
Full scope, one contractor, foundation to finish line. Every project below gets a written line-item quote and the 730-Day Done Right Promise.
ADU Design & Permitting
Design and permitting for an ADU in Three Lakes is where the packet matters most: elevations, finish and colour samples, height callouts, and a drainage and grading plan all have to clear the HOA architectural committee before a building permit can mature. We assemble that packet, file it, and answer committee comments. On lakefront lots we run the drainage-easement review in parallel, not stacked behind it.

Room Additions
A rear room addition on a CBS-and-stucco Three Lakes home typically runs $45,000 – $130,000 depending on size, foundation work and how much of the existing roof and wall has to be tied in. The build itself is usually the easy part. The sequencing is what protects your budget: slab and rough-in wait until approvals are actually in hand, so you’re never staring at an open shell while a committee meets.

New Detached ADU
A new detached ADU in Three Lakes generally lands between $90,000 and $220,000, driven by square footage, site prep, utility runs and how close the structure sits to the lakes or a drainage easement. Wind-rated roof-to-wall connections and impact-rated openings are standard here, not upgrades, given hurricane season and current code. Detached units almost always touch both approval tracks, so plan the calendar around that.

Junior ADU & Interior Conversion
Garage conversions in Three Lakes typically run $30,000 – $80,000, and junior ADUs or interior conversions are the fastest route to rental income because they reuse the existing footprint, foundation and roof. Many 1980s-era homes still have original polybutylene plumbing or single-pane windows that fail current wind-load and energy code once the room becomes living space. We scope that upfront so the conversion doesn’t blow its budget on hidden plumbing swaps.
Trusted Brands We Service in Three Lakes
Finishes and fixtures are your choice and we quote quality names, not whatever’s cheapest this week: Caesarstone surfaces for ADU kitchenettes, Kohler and Moen fixtures, Blanco sinks where the layout allows. We don’t stock parts or run a warehouse; sourcing is handled per project, so we buy what your plans specify and schedule delivery to the build calendar. That keeps lead times honest, and it means the finish schedule you approve is the finish schedule that gets installed. Built to last, backed in writing.
See the difference
Before
After
Before
After
Before
AfterCommon Home Additions & ADU Problems We See in Three Lakes Homes
- Submittal packets rejected after demolition has started. Unapproved height changes, colours or materials stall the schedule and leave framing exposed to South Florida rain. We file and clear the packet before the first wall comes down.
- Lakefront and near-lake lots altering drainage and grading. An addition that changes how water leaves the lot can trigger a separate drainage-easement review that pushes the calendar out weeks. We catch that in design, not mid-build.
- Half-finished shells waiting on committee approval. The draw schedule and start date get set before approval is in hand. We set the calendar after the calendar is real.
- Aging plumbing and single-pane windows failing current code. Original polybutylene lines and old glazing often don’t meet wind-load and energy requirements once space becomes conditioned living area. We scope the fix into the quote.
Pricing for Home Additions & ADU in Three Lakes, FL
Straight numbers for the 33186 market. Home additions in Three Lakes run $45,000 – $130,000. Detached ADU construction runs $90,000 – $220,000. Garage conversions run $30,000 – $80,000. What moves the number: square footage, foundation and tie-in scope, whether the lakes or a drainage easement complicate site prep, and finish level. The number you see is the number you pay, and financing at 0% for 18 months plus $1,000 off projects over $10,000 helps with a five-figure build. Get a free project estimate and design consult.
| Scope of Work | Typical Range in Three Lakes |
|---|---|
| Home Addition | $45,000 – $130,000 |
| ADU Construction | $90,000 – $220,000 |
| Garage Conversion | $30,000 – $80,000 |
We Also Serve Cities Near Three Lakes
We work across the surrounding west Kendall communities as well, including The Crossings, Kendale Lakes, Kendall and Richmond Heights. Different HOA boards, different drainage maps, same sequencing discipline. If your project sits on the edge of Three Lakes or just over a boundary line, tell us when you call and we’ll confirm coverage. Our Home Additions & ADU team can also take you deeper into how we build additions and ADUs in Three Lakes.
Serving Three Lakes, FL – Our Local Coverage Area
We serve Three Lakes and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
FAQs – Home Additions & ADU in Three Lakes

At minimum: scaled elevations, finish and colour samples, exact height callouts, footprint dimensions and a drainage and grading plan. Most Three Lakes architectural committees also want the roof material and profile specified to match the existing tile or built-up roof, plus a site plan showing setbacks and how water leaves the lot. We assemble and file the whole packet for you. Call (844) 834-8961 for a free estimate and we’ll walk through what your specific board expects.
Expect several weeks, and on lakefront lots potentially longer, because drainage-easement review runs on its own calendar. Review timing varies by committee and by the completeness of the packet, so we build the review window into the schedule from day one rather than discovering it mid-build. The practical difference is sequencing: we don’t set a demolish date until approval is actually in hand. Call (844) 834-8961 for a realistic timeline on your lot.
Because an addition that alters roofline height, footprint or drainage flow can trip both HOA architectural review and lake-adjacent drainage-easement review at the same time. Those are two separate calendars, and stacking them instead of running them in parallel is what pushes projects out by weeks. High water tables and heavy summer downpours make grading and drainage details matter, not just for approval but for how the lot actually performs after the build. Call us for a free estimate on your lakeside plans.
Usually not entirely, because most Three Lakes architectural committees still want a submittal for any exterior change, including new doors, windows or finish changes visible from the street. A garage conversion often needs less review than a detached ADU because the footprint and roof stay put, but it still touches permitting and code compliance for the new living space. We confirm what your board requires before quoting. Call (844) 834-8961 for a free estimate.
Sequencing: the draw schedule and start date get set after approval is in hand, not before. The most expensive mistakes we see are slabs poured and rough-ins run while a committee meeting is still weeks out, leaving a shell open to Florida rain. We file the packet, wait for clearance, then start the clock. The punch list is held until inspection sign-off closes out the scope. Call (844) 834-8961 to schedule your free estimate.
Whether you’re planning a rear room addition, a detached ADU or a garage conversion in Three Lakes, the first conversation is a free estimate and design consult. Call Groundwork Construction Co. of Kendale Lakes at (844) 834-8961. A live person answers, 24/7, and you’ll get a written line-item quote before anything is signed.
Written by the team at Groundwork Construction Co. of Kendale Lakes.












