ADU Site Prep & Utilities in Westchester, FL: What It Costs and How Long It Takes
ADU site prep and utilities in Westchester, FL typically runs $45,000 – $130,000 for the sitework and utility package alone, with most jobs taking 4 – 8 weeks from first excavation to final utility inspection. That number covers grading, foundation, water, sewer, electrical service, and the rough-in work an inspector has to sign off before any walls go up. Call (844) 834-8961 for a free on-site estimate.
How we run site prep and utilities, stage by stage

This work has a fixed order, and skipping a step means tearing something out later. Here’s what the calendar actually looks like on a Westchester lot.
Stage 1: Site survey and utility locate (days 1 – 2)
We start by confirming where the existing water, sewer, and electrical service enter the main house and where the new ADU pad will sit. A locate service marks buried lines before anything gets cut. You decide pad placement and orientation here, and that decision locks the rest of the schedule.
Stage 2: Demolition, clearing, and grading (days 3 – 6)
Old slabs, carport footings, and stray trees come out, then we grade to drain away from both structures. Because Westchester lots are tight and mostly built out, this is where alley access, fence lines, and parking for the crew get sorted. You’ll confirm equipment access and where the spoil pile goes.
Stage 3: Foundation and slab (days 7 – 16)
Footings get dug, forms set, rebar tied, and the slab poured and cured. Miami-Dade’s wind-load requirements mean anchor placement is inspected, not assumed. You’ll pick slab finish at this point if you want a screened porch or utility pad attached.
Stage 4: Underground utilities (days 10 – 25, overlapping the slab cure)
Sewer and water lines run from the main house or the city tap to the new structure, and the electrical conduit goes in before the slab closes. Trenching, backfill, and compaction all get inspected. You’ll decide whether the ADU gets a separate meter or taps the main panel.
Stage 5: Rough-in inspection and tie-in (days 25 – 40)
Plumbing, electrical, and gas rough-in get inspected as a package, then backfilled and capped for the build phase. A failed inspection here costs a week, which is why we walk the work before the county does.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The utility and sitework choices you’ll actually make
These are the forks in the road where the budget moves. None of them are cosmetic.
- Separate meter vs. subpanel off the house. A separate meter is cleaner for renting the ADU later but adds utility-company fees and a longer service run. A subpanel is cheaper upfront and easier to permit.
- Gravity sewer vs. lift pump. If the new structure sits above the main line, gravity wins. If the lot slopes the wrong way, a grinder pump adds cost and a maintenance item.
- Slab-on-grade vs. raised stem wall. A standard slab is the cheapest option. A stem wall costs more but handles Westchester’s heavy summer rain and keeps the floor above grade.
- Impact-rated windows and doors from the start. Miami-Dade product approval (NOA) is required anyway, so choosing impact glazing now avoids a retrofit later. Kohler fixtures and Moen rough-in valves are the plumbing specs most homeowners land on, with Blanco sinks if the ADU gets a full kitchen.
- Surface drainage. French drains and swales cost extra but matter on tight lots where the ADU pad sits close to a fence line.
What ADU Site Prep & Utilities costs in Westchester, FL

Plan on $45,000 – $130,000 for the site and utility package. The low end is a simple pad on a lot with easy access and nearby utility taps. The high end is a tight Westchester lot with lift-pump sewer, separate electrical service, extensive grading, and impact-rated rough openings.
| Line item | Typical range |
|---|---|
| Clearing, demo, grading | $4,000 – $14,000 |
| Foundation and slab | $12,000 – $34,000 |
| Water and sewer tie-ins | $8,000 – $28,000 |
| Electrical service and conduit | $6,000 – $22,000 |
| Rough-in plumbing and gas | $7,000 – $18,000 |
| Permits and inspections | $3,000 – $9,000 |
Five things push a Westchester job toward the top: lot access (alley-loaded lots vs. street access), sewer depth and slope, whether the panel has capacity for another service, how much old concrete has to come out, and the permit scope itself. A written estimate lists each of those line by line, with a fixed number you can hold us to. What it doesn’t include is the ADU structure, finishes, or appliances – those live on a separate line in the full build for this Home Additions & ADU in Westchester. Every job lands under the 730-Day Done Right Promise, with upfront pricing and 0% financing for 18 months available.
See the difference
Before
After
Before
After
Before
AfterWhat Westchester homes specifically do to this job
Westchester (ZIP 33165) is a built-out, largely post-1950s pocket of unincorporated Miami-Dade, and that reality shapes site prep more than anything else. There’s no vacant land to work with, so almost every ADU pad gets tucked behind a 1950s – 70s CBS block home on a lot sized for the original house and nothing more. The old slabs, carport footings, and jalousie window openings we tear out were never built to today’s wind-load standards, which means an ADU permit triggers Miami-Dade’s High-Velocity Hurricane Zone product approval and NOA paperwork as a matter of course. Locals know this: the permit and inspection sequence, not the framing or the digging, sets the schedule. Grading runs close to fence lines and neighboring structures, and summer afternoon downpours mean we grade and pour in the morning and leave time to move water before the storms. If a carport enclosure or reconfigured driveway is part of the plan, homeowners often pair this with Concrete Driveways & Concrete Work in Westchester so the pad and the parking run get done with one crew on site, or with Paver Driveways in Westchester when the look matters more than the budget. You’ll find us working all across Westchester and into Olympia Heights, Westwood Lakes, Sunset, and Fountainebleau.
Serving Westchester, FL – Our Local Coverage Area
We serve Westchester and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently asked: ADU Site Prep & Utilities in Westchester

Most jobs run 4 – 8 weeks from first dig to rough-in inspection, with the permit and NOA review often adding 2 – 4 weeks before that clock starts. A straightforward pad on a street-access lot lands near the short end. Call (844) 834-8961 for an exact schedule.
Yes. Every ADU here needs a building permit, and because Westchester falls under Miami-Dade’s High-Velocity Hurricane Zone code, the site, foundation, and utility work all get inspected against product approval and wind-load requirements. We pull the permits and hold the inspections; that’s part of the job.
In most cases yes. We tie new lines into the existing mains from outside the structure, so the house stays intact and the mess stays in the yard. If the panel is maxed out or the sewer main sits too high, the plan changes and we tell you before any trench gets dug.
Expect $45,000 – $130,000 for the sitework and utility package. The low end is simple access and nearby taps; the high end is lift-pump sewer, a separate meter, and heavy grading on a tight lot. Call (844) 834-8961 for a written line-item quote – estimates are free.
It doesn’t, unless you approve a change order. We price the job from an on-site survey and hold the number. Unexpected soil or utility conditions are the one exception, and we stop and talk to you before we spend a dollar. Our workmanship carries the 730-Day Done Right Promise.
Get a free on-site estimate
If you’re planning an ADU in Westchester, the first step is a free on-site estimate. We walk the lot, check the sewer and electrical access, and hand you a written line-item quote with a fixed price. Call (844) 834-8961 and a live person will pick up, around the clock. Our technicians bring up to 12 years of experience, arrive in uniform, and work around tight driveways and parking constraints. You’ll get the plan in writing before anything gets dug.