







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Cabinets & Countertops in Richmond Heights, FL: What the Job Actually Involves
New cabinets and countertops in Richmond Heights typically run $14,000 – $45,000 for a full kitchen, with cabinet installation alone at $4,000 – $13,000 and countertops at $2,000 – $6,500 depending on material. The work itself usually takes two to four weeks from demolition to final countertop set, and the gap between “cabinets delivered” and “counters templated” is where most schedules slip. Call (844) 834-8961 and we’ll walk your kitchen and put real numbers on paper, free.
Here’s the part most homeowners don’t hear until they’ve already signed: cabinets and countertops are two separate jobs with two separate lead times, and they only interlock because one measurement has to be right before the other can start.
How We Sequence Cabinets & Countertops in Richmond Heights, Stage by Stage

A kitchen that gets new boxes and stone is a short, high-stakes project. Five stages, and you’re making a decision at each one.
Stage 1: Measure and layout (day 1, about 90 minutes)
We measure the room, check the walls for plumb and the floor for level, and confirm appliance sizes before anything is ordered. In Richmond Heights CBS homes from the 1950s through the 1970s, we expect at least one out-of-square wall. You decide the cabinet layout and door style here, because that locks the order.
Stage 2: Demo and prep (days 2 – 3)
Old cabinets, counters, and backsplash come out, and we cap the plumbing and make the electrical safe. If you’re keeping the existing floor, we protect it; if the terrazzo underneath is salvageable, we talk about whether to restore it. You decide whether the sink and range stay in place or move, which is the single biggest cost lever on this job.
Stage 3: Cabinet install (days 4 – 7)
Boxes get set, leveled, and shimmed, then screwed to studs. Crown, filler panels, and toe kick go on. Cabinet lead time is the wild card: stock runs 1 – 3 weeks, semi-custom KraftMaid lines often 4 – 8 weeks. That wait usually happens before demo, not during it.
Stage 4: Countertop template and fabrication (days 8 – 20)
Once the bases are set and level, the countertop fabricator templates the actual installed cabinets, not the old ones. That template is why we never let a homeowner order stone off a drawing. Fabrication and install run 5 – 10 business days for most materials, longer for specialty edges.
Stage 5: Sink, fixtures, and closeout (days 21 – 28)
Undermount sink gets set, faucet and disposal connect, and we check every door and drawer for alignment. You walk the kitchen with us before we call it done, and anything that isn’t right gets fixed under the 730-Day Done Right Promise.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Options You’ll Choose Between
Three real decisions shape the outcome, and each one has a trade-off worth knowing before you commit.
- Cabinet construction: Stock boxes are the cheapest and fastest, but limited in size. Semi-custom (KraftMaid is what we most often specify) gives you the widths and finishes to fit an odd mid-century layout. Plywood boxes outlast particleboard in South Florida humidity, which matters more here than in a dry climate.
- Countertop material: Laminate is the budget choice at the low end of the range, but it doesn’t tolerate a hot pan or a seam near the sink. Quartz and granite land in the middle-to-upper part of the $2,000 – $6,500 countertop range and hold up to daily use; quartz needs no sealing, granite does. Cambria quartz is a common pick for the look without the maintenance.
- Sink and layout: Keeping the sink where it is saves money. Moving it means new supply and drain lines, which pushes the job toward the top of the range. A single-basin undermount is the practical default.
- Island or peninsula: If your Richmond Heights kitchen has the footprint, an island adds prep space and a gathering spot, but it’s a separate line item from the cabinets and counters themselves.
- Backsplash scope: A slab-to-ceiling splash looks sharp but budgets differently than a 4-inch riser. We keep the splash on its own line so you can see the split.
What Cabinets & Countertops Costs in Richmond Heights, FL

Plan on $14,000 – $45,000 for new cabinets and countertops across a full Richmond Heights kitchen. The line items below are what we quote, itemized, so you can see exactly where the money lands.
| Line item | Typical range |
|---|---|
| Cabinet installation | $4,000 – $13,000 |
| Countertop installation | $2,000 – $6,500 |
| Backsplash installation | $800 – $2,500 |
| Kitchen island installation | $3,000 – $10,000 |
| Full cabinets & countertops scope | $14,000 – $45,000 |
Five variables push a job to the low or high end:
- Kitchen size and cabinet count: A galley with 20 linear feet sits near the bottom. A U-shaped layout with an island pushes toward the top.
- Layout changes: Moving plumbing, gas, or electrical for a relocated sink or range adds real money and, often, a permit.
- Material grade: Stock laminate versus semi-custom boxes with quartz accounts for most of the spread inside the range.
- Existing condition: Out-of-square walls, water damage under an old sink, or a floor that has to come up before cabinets go in.
- Permit scope: Straight cabinet swap is usually permit-light; electrical or plumbing relocation changes that.
Our written estimate lists what’s included: cabinets, counters, install labor, haul-away, and permit pulls where required. It doesn’t include surprises later, because the number you see is the number you pay. Upfront pricing, no change orders hiding in the fine print.
See the difference
Before
After
Before
After
Before
AfterWhat Richmond Heights Homes Specifically Do to This Cabinets & Countertops Job
Richmond Heights is a historically Black, mid-century suburb of South Miami-Dade, built out almost entirely between the 1950s and 1970s. That’s the whole story for a kitchen: the area is essentially built out, so cabinet and counter work here is nearly always a renovation of a 60-plus-year-old single-family ranch or CBS home rather than anything new. We work on original kitchens with worn-out particleboard boxes, cabinets hung on walls that have settled an inch out of plumb, and terrazzo or tile floors we try hard to save. The county’s High Velocity Hurricane Zone rules shape this work in ways homeowners don’t expect: anything tied to windows, doors, or additions has to use Miami-Dade NOA-approved products, and if your cabinet project is part of a Kitchen Remodeling in Richmond Heights that touches a wall or window opening, that permitting rigor follows the whole scope. That’s the reason we measure before we order and pull permits when the job calls for them, not after.
Serving Richmond Heights, FL – Our Local Coverage Area
We serve Richmond Heights and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked: Cabinets & Countertops in Richmond Heights

Most Richmond Heights cabinet and countertop jobs run two to four weeks on site, with cabinet and stone lead times sitting outside that window. Stock cabinets arrive in one to three weeks; semi-custom often takes four to eight. Call (844) 834-8961 and we’ll map the real timeline for your kitchen.
A straight swap of cabinets and counters in the same footprint usually doesn’t require a permit. Moving plumbing, gas, or electrical does, and we pull it and pass inspection. We tell you up front which side of that line your project is on.
Yes, keeping the sink, range, and walls where they are is the most common and cost-effective way to do this job. You get new boxes and stone in the existing layout, and the job stays closer to the $14,000 end of the range. Call (844) 834-8961 for a free estimate on a no-move scope.
Expect $14,000 – $45,000 for a full kitchen, with cabinet install at $4,000 – $13,000 and countertops at $2,000 – $6,500. Material grade and layout changes move the number most. Call (844) 834-8961 for an exact quote; the estimate is free and itemized.
Every job we do is backed by our 730-Day Done Right Promise: if it isn’t right, we make it right. That covers our workmanship on installation, alongside the manufacturer warranties on the cabinets and stone. Call (844) 834-8961 to talk through the details before you commit.
Get a Free Cabinets & Countertops Estimate in Richmond Heights
If your Richmond Heights kitchen is ready for new boxes and stone, we’ll come out, measure, and give you a written, itemized estimate at no cost. A live person answers the phone around the clock, and you’ll know what your kitchen remodeling project can realistically look like. Homeowners in Richmond Heights often pair this with a Garage Conversion ADU in Richmond Heights or a New Detached ADU in Richmond Heights down the road, and we scope those the same way. Call (844) 834-8961 to schedule your free estimate.
Written by the team at Groundwork Construction Co.












