Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Concrete Driveways & Concrete Work in Richmond Heights, FL: What It Costs and How Long It Takes
Concrete Driveways & Concrete Work in Richmond Heights runs $4,500 to $12,000 for a full installation, and most single-family driveways are poured in two to four working days. A full replacement (demo of the old slab plus a new pour) lands between $5,000 and $14,000, and sealing an existing slab costs $250 to $700. Call (844) 834-8961 for a free on-site estimate and a written, line-item price before any concrete is ordered.
How a Concrete Pour Actually Runs, From Demo Day to the Day You Park on It

Concrete is one of the few trades where the schedule is set by the material, not by us. Once a truck is on site and the mix is batched, the clock is running. Here’s the real sequence we follow on a Richmond Heights driveway, with the decisions you’ll make along the way.
Stage 1: Site visit and written scope (day 0). We measure the run, check the slope away from the house, and look at what’s underneath: root systems, old cracked slab, drainage swales. This is where you decide on width (a standard single is 10-12 feet; an oversized or double run is 16-24 feet), thickness (4 inches for cars, 5-6 inches where a truck or RV parks), and whether you want the slab reinforced with rebar or a welded wire mesh. That day you get a written estimate with the number you’ll pay, not a range.
Stage 2: Demo and haul-off (day 1). We break out the old concrete, load it, and haul it away. A typical Richmond Heights driveway slab is gone in a single day, sometimes a day and a half if it’s thick or has a deep footing at the apron. We cut cleanly at the property line and at the garage apron so the new pour ties in tight.
Stage 3: Base prep and grading (day 1-2). This is the stage nobody sees and the one that decides whether the slab cracks in year three. We excavate to depth, compact the subgrade, and bring in a compacted base so the slab has something to sit on that won’t settle. We grade for positive drainage away from the house and the garage. You decide at this point whether you want a drainage channel or a French drain at the low corner, which is common on Richmond Heights lots where the yard slopes back toward the house.
Stage 4: Forming, reinforcement, and inspection (day 2). Forms go up, rebar or mesh goes in, and if the job needs a permit, the county inspects the subgrade and reinforcement before we pour. In an unincorporated Miami-Dade area that means a threshold inspection sequence, which we schedule ahead of time so we’re not sitting on forms waiting for an inspector. You’ll confirm any expansion joints and control-joint layout with us here; those lines are how the slab relieves stress and where it will crack if it cracks.
Stage 5: Pour, finish, and cure (day 3, then 24-48 hours). We pour, screed, and finish to the texture you picked: broom, exposed aggregate, or a light salt finish. Curing runs 24-48 hours before you can walk on it, and a full week before you park a car on it. We come back to strip forms, cut control joints if they weren’t cut wet, and seal if the job calls for it. Sealing is not always necessary on a fresh pour; if you want it, we tell you the right window.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Choices That Shape a Richmond Heights Concrete Driveway
Concrete isn’t one product. The decisions below are the ones that separate a $4,500 job from a $12,000 job, and we want you making them with the trade-off in front of you, not after the truck leaves.
- Standard broom finish: The workhorse. Good traction, hides tire marks reasonably well, lowest cost per square foot. Best for a straightforward residential driveway. The downside is it shows stains over time and the texture is the hardest to clean without a pressure washer.
- Exposed aggregate: Pebble surface revealed by washing the top layer of cement. Great grip in wet South Florida weather and it hides dirt much better than broom. Costs more and the surface is rougher on bare feet, so it’s a poor fit if you want a smooth transition to a walkway.
- Rebar vs. welded wire mesh: Rebar is the stronger reinforcement and the right call on any driveway that carries a truck, trailer, or RV. Mesh is cheaper and fine for a light-use residential slab. We quote both so you can see the number.
- Slab thickness: 4 inches is standard for cars. If you regularly park a heavy truck, a boat trailer, or a work vehicle on the pad, 5-6 inches with rebar is the honest upgrade, and it’s the difference between a slab that lasts and one that spider-cracks.
- Color and integral pigment: Concrete can be tinted through the mix or finished with a colored hardener. It’s a modest upcharge and holds up well in the sun. Surface-applied stains fade faster in Florida UV than most people expect.
- Sealer: A penetrating sealer slows water absorption and helps with stains; a film-forming sealer gives more gloss but can scuff. Sealing is a $250-$700 add depending on square footage, and it’s maintenance, not a one-time finish.
This is also where the rest of a full Driveway & Pavers in Richmond Heights scope comes in: if the pour is part of a broader front-yard rebuild, we scope the driveway, apron, and any adjacent walk in one estimate so nothing gets priced twice.
What Concrete Driveways & Concrete Work Costs in Richmond Heights, FL

For Richmond Heights, a concrete driveway installation runs $4,500-$12,000. A full replacement, where we demo and haul the old slab, is $5,000-$14,000. Sealing an existing driveway is $250-$700. Those are the real numbers for a residential job, and any quote far under them usually has a thinner slab, a cheaper mix, or a base prep that got skipped.
Five things push a job toward the top of the range:
- Square footage and width. An oversized run for a work truck or an 18-foot gate will cost more than a standard 10-foot single in materials, forming, and reinforcement.
- What has to come out. Old slab demo, roots, buried obstructions, or a failing apron all add demolition and disposal.
- Base condition. Soft or unsettled subgrade means more excavation and more imported base, which is real money.
- Reinforcement and thickness. Rebar plus a 5-6 inch slab is the biggest single upgrade on the line item.
- Permits and engineering. If the job requires a county permit and threshold inspection, that cost is part of the number, not an afterthought.
A written estimate from us lists the square footage, thickness, reinforcement, finish, demo, haul-off, and permit line separately. What it doesn’t include is landscaping repair beyond the pour line, irrigation relocation, or a new garage apron beyond the specified run; we’ll flag those up front if your property needs them. Upfront pricing, no surprises, and if the scope changes mid-job you approve the change before we touch it.
See the difference
Before
After
Before
After
Before
AfterWhat Richmond Heights Homes Do to a Concrete Job
Richmond Heights is a built-out South Miami-Dade suburb, and the housing stock tells you what to expect on a driveway: CBS (concrete block and stucco) ranch homes from the 1950s through the 1970s, many with carports that were converted or enclosed years ago, and driveways that have been patched, resurfaced, and re-patched over decades. When we demo one of those slabs, we routinely find that what looked like one pour is actually three, laid at different depths with no consistent base. That’s why base prep matters more here than on a new lot.
The other Richmond Heights reality is the Miami-Dade High Velocity Hurricane Zone. Concrete work is generally outside the wind-load rules that govern roofs and windows, but the county’s permitting and inspection sequence still applies, and every job we take gets scheduled around the storm season the same way a re-roof or impact-window retrofit does. We don’t try to pour in the teeth of a tropical system. If a job is caught by a storm window, we push the pour and tell you why. Homeowners here also tend to have longer service drives, detached workshops, and heavy vehicles on the property, which is why we default toward rebar and a thicker slab on a Richmond Heights job rather than a bare-minimum pour.
We cover the full Richmond Heights area and the surrounding South Dade neighborhoods, and we schedule concrete to fit the local calendar rather than the other way around. If the driveway is one piece of a bigger rebuild, homeowners often pair this with ADU Site Prep & Utilities in Richmond Heights when a detached unit is going in on the same lot.
Serving Richmond Heights, FL – Our Local Coverage Area
We serve Richmond Heights and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – Concrete Driveways & Concrete Work in Richmond Heights

Most residential driveways take two to four working days from demo to final finish, then 24-48 hours before foot traffic and about a week before you park a car on it. The pour itself is fast; the base prep and the cure are what take time, and we won’t rush either. Call (844) 834-8961 for a schedule based on your actual lot.
It depends on the scope. A straight replacement of an existing residential driveway in a similar footprint often doesn’t require a building permit, but a new driveway, a widened apron, or anything that touches the right-of-way or drainage usually does. We tell you in the written estimate whether a permit is required and who pulls it. Call (844) 834-8961 and we’ll check your specific situation.
Yes. Concrete Driveways & Concrete Work is surface and subsurface work; the garage and house stay where they are. What we do need to work around is the garage apron and the threshold, and if you’re planning a new door or a garage-door change, homeowners often pair this with Door Installation in Richmond Heights so the apron and the door come together. The only time structure gets involved is when a footing or a load-bearing wall is being changed, which is a different job.
Concrete Driveway Installation runs $4,500-$12,000, a Driveway Replacement runs $5,000-$14,000, and Driveway Sealing runs $250-$700. The number that matters is the one on your written estimate after we’ve measured your run and seen what’s under the old slab. Call (844) 834-8961 for an exact quote; estimates are free.
Every job we do is covered by the 730-Day Done Right Promise: if it’s not done right, we make it right. That’s two full years on the workmanship, and it’s in writing. Our technicians have up to 12 years of experience, and every tech is background-checked and arrives in uniform. Call (844) 834-8961 with questions about coverage before you sign anything.
Get a Free Concrete Estimate in Richmond Heights
We’ll come out, measure your driveway, look at what’s under the old slab, and hand you a written, line-item estimate for Concrete Driveways & Concrete Work in Richmond Heights, FL, at no cost. Call (844) 834-8961 and a live person answers, any hour. We’ll ask a few questions about the run and the vehicle weight, set a time, and bring the numbers with us. You’ll also hear about our $1,000 off projects over $10,000 and 0% financing for 18 months if the scope grows past the pour. Our full Driveway & Pavers service covers the rest of the front yard if you want it done in one bid.
Written by the team at Groundwork Construction Co.