Cabinets & Countertops in The Crossings, FL: What the Job Really Takes
Most cabinet and countertop projects in The Crossings run $14,000 – $45,000 for a full kitchen’s worth of new cabinets, countertops and install, and a typical house takes three to five weeks from demolition to the last bead of caulk. Cabinet-only work lands at $4,000 – $13,000 and countertop-only at $2,000 – $6,500. Call (844) 834-8961 and we’ll walk your kitchen, measure, and put real numbers on paper for free.
How We Run a Cabinet and Countertop Job, Stage by Stage

Cabinet and countertop work is a sequence, not a single event. Here’s what actually happens, and when you have to make a decision.
Stage 1: Measure and templating (day 1, about 90 minutes)
We measure every wall, check for out-of-square corners and floor level, and photograph the plumbing and electrical rough-in. You decide the cabinet layout and door style now, because everything downstream depends on it. In 1980s – 1990s The Crossings homes we almost always find at least one wall that’s off by a half inch, which changes filler and panel sizes.
Stage 2: Demo and prep (days 2 – 3)
Old cabinets come out, the sink and appliances get disconnected, and we patch and level the wall and floor. If the countertop is stone or quartz, a template is taken after the new cabinets are set, not before. You confirm whether the old backsplash stays or goes.
Stage 3: Cabinet set and leveling (days 4 – 7)
Base and wall cabinets go in, shimmed and leveled, and the crown and light rail get fitted. You sign off on door alignment and drawer glide before we move on. This is the stage where a rushed crew leaves you with doors that rub for the next ten years.
Stage 4: Countertop fabrication and install (days 8 – 18)
Quartz and granite get cut at the fabricator, which is the long lead item, then set with the sink and faucet. Laminate and butcher block install faster. You pick the edge profile and sink cutout position here.
Stage 5: Final trim and walkthrough (days 19 – 25)
Toe kicks, end panels, caulk lines, and the final hardware get finished, and we walk the job with you against the written scope. Nothing gets called done until you’ve opened every drawer.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Cabinet and Countertop Choices You’ll Actually Weigh
Most of the stress in this job comes from picking between options that look similar but age very differently in a South Florida kitchen. Here’s the honest version.
- Stock vs. semi-custom cabinets. Stock is cheaper and faster but won’t fill a 1980s wall that’s out of square without visible fillers. Semi-custom lets us size boxes to the room. KraftMaid is our workhorse here because the door and finish options hold up in humidity.
- Plywood vs. particleboard boxes. Plywood costs more and resists moisture far better in a kitchen that sees steam and summer damp. Worth the upcharge in a The Crossings home.
- Quartz vs. granite. Quartz is non-porous and needs no sealing; granite is natural and can chip at the edge. Both handle the heat of a busy kitchen.
- Laminate vs. solid surface. Laminate is the budget pick and can delaminate near a dishwasher over time. Solid surface can be sanded and refinished, which suits a family that cooks hard.
- Full-overlay vs. inset doors. Full-overlay is standard and forgiving; inset looks high-end but demands precise cabinet boxes and a higher budget.
- Under-cabinet lighting and soft-close hardware. Cheap upgrades per drawer that most homeowners add once they see the finished kitchen.
What Cabinets & Countertops Cost in The Crossings, FL

A full kitchen’s cabinets and countertops in The Crossings run $14,000 – $45,000, with the wide spread coming from four things: kitchen size, cabinet grade, countertop material, and how much has to be moved.
| Line item | Range |
|---|---|
| Cabinet installation | $4,000 – $13,000 |
| Countertop installation | $2,000 – $6,500 |
| Backsplash installation | $800 – $2,500 |
| Kitchen island installation | $3,000 – $10,000 |
What pushes a job to the low end: stock cabinets, laminate counters, an island that’s already wired, and no plumbing relocation. What pushes it to the high end: semi-custom boxes to the ceiling, quartz with a complex edge, moving the sink and range, and adding an island that needs a new circuit. A written estimate includes demo, cabinet and countertop supply and install, sink and faucet set, trim, and haul-away. It typically excludes appliance purchase, drywall repair beyond minor patching, and permission-to-move fees if the layout changes.
See the difference
Before
After
Before
After
Before
AfterWhat The Crossings Homes Specifically Do to This Job
The Crossings filled in fast during the 1980s and 1990s, so nearly every kitchen here is a renovation of the same generation of CBS house rather than new construction. That shows up in the work: original cabinets built to 1980s depth, a single wall that’s out of square, and outlets spaced for a much smaller appliance load. Miami-Dade’s post-Andrew building code and high-velocity hurricane zone rules govern every permitted change, and the HOA architectural review sits on top of that, which is part of why we build extra time into the schedule for a kitchen that touches exterior walls or windows. The upside is that these homes were built well and take new cabinets cleanly once the walls are prepped. If your project grows past the kitchen, it often folds into a Kitchen Remodeling in The Crossings plan, and homeowners sometimes pair the work with a Garage Conversion ADU in The Crossings when the garage is already being used for storage overflow.
Serving The Crossings, FL – Our Local Coverage Area
We serve The Crossings and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked: Cabinets & Countertops in The Crossings

Three to five weeks for a full kitchen, with cabinets set in the first week and quartz countertops adding the most wait because fabrication is the long lead. Laminate and butcher block shorten that by about a week. Call (844) 834-8961 for a schedule built to your actual selections.
Usually not for a straight like-for-like swap, but yes the moment you move plumbing, add a circuit, or open a wall. The Crossings sits under Miami-Dade permitting and HOA architectural review, and we tell you up front which applies before we start. Call (844) 834-8961 and we’ll sort out what this job actually triggers.
Yes, and it’s the most common way we do it here. Keeping the sink and range where they are cuts the price toward the low end of the $14,000 – $45,000 range and shortens the timeline. Moving the sink or range means new supply, drain, and often a circuit, which the estimate will show line by line.
Plan on $14,000 – $45,000 for a full kitchen, $4,000 – $13,000 for cabinets alone, and $2,000 – $6,500 for counters alone. Cabinets and counters plus an island can push higher. We put a fixed number on paper with no change orders where nothing moves unexpectedly.
Our cabinet and countertop installs are covered by the 730-Day Done Right Promise, backed by KraftMaid and other brand partners who warranty their materials. If anything we installed fails, we make it right. Call (844) 834-8961 for the full written terms.
Get Your Free Cabinets & Countertops Estimate in The Crossings
We’ll come out, measure your kitchen, and hand you a written line-item estimate for cabinets and countertops in The Crossings with fixed pricing and 0% financing for 18 months available. No pressure, no vague numbers. Our technicians have up to 12 years of experience, and our lines are open around the clock. Call (844) 834-8961 to schedule your free estimate, or to talk through whether your project is part of a bigger Kitchen Remodeling scope, or if you’re considering pairing it with a New Detached ADU in The Crossings.
Written by the team at Groundwork Construction Co.