New Detached ADU in The Crossings, FL: What It Takes, What It Costs
A new detached ADU in The Crossings typically runs $45,000 to $130,000 and takes five to nine months from first plan to final inspection, with the building department review eating a big chunk of that calendar. You’re adding a fully separate, permitted dwelling on your lot: foundation, CBS walls, wind-rated roof, its own electrical panel and plumbing tie-ins. Call (844) 834-8961 and we’ll walk your property and give you a written, line-item estimate before you commit to anything.
How We Build a Detached ADU, Stage by Stage

Every detached ADU we build in The Crossings follows the same sequence. Knowing what happens when keeps the surprises out of your schedule and your budget.
- Stage 1: Site walk and design (2-4 weeks). We measure your lot, check setbacks against Miami-Dade zoning, and confirm where power, water, and sewer actually run. You decide the footprint, the bedroom count, and whether you want a covered entry. This is when we hand you a fixed, no-hassle upfront price.
- Stage 2: Permits and hurricane-zone engineering (6-12 weeks). Detached structures here fall under the high-velocity hurricane zone rules, so plans carry wind-load calcs and impact-rated product approvals before the building department will stamp them. You sign off on the final plan set and pay permit fees at this point. This is often the longest stretch, and it’s where jobs without a real construction team stall.
- Stage 3: Foundation, slab, and CBS walls (3-5 weeks). We form and pour the slab, then lay concrete block with tie-beams and pour the bond beam. Inspections happen at the slab and the tie-beam. You choose your exterior stucco finish and front door style here, since those get ordered now.
- Stage 4: Roof, rough-ins, and impact openings (4-7 weeks). Roof framing and underlayment go on, then plumbing, electrical, and HVAC rough-ins run before drywall. Impact windows and the wind-rated door get installed and inspected. You pick fixtures and finishes during this window.
- Stage 5: Finishes, final inspection, and walkthrough (4-6 weeks). Drywall, paint, floors, cabinet, and trim go in, the building department does its final, and you walk the finished unit with us. We close with a punch list and hand you the 730-Day Done Right Promise in writing.
Across all five stages, our technicians bring up to 12 years of trade experience to the details that make an ADU feel like a real home and not a converted shed. Calls are answered by a live person around the clock, so a question about a product lead time doesn’t wait for Monday.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Choices That Shape Your ADU
Detached ADU buyers in The Crossings pick between real alternatives, and each one trades cost against how it holds up under South Florida weather. Here’s what actually matters:
- Footprint and bedroom count. A one-bedroom studio over a single-car-sized pad is the low end of the range; a two-bedroom with a defined living space and full kitchen pushes it up. Every square foot adds slab, block, roof, and finish cost.
- Roof and roof deck. Barrel tile reads best next to The Crossings’ Mediterranean housing stock but costs more and holds heat; a standing-seam metal roof runs higher still but sheds summer downpours cleanly. Both need hurricane-zone-rated underlayment systems here.
- Impact glass versus shutters. Impact-rated windows and a rated entry door cost more up front but remove the annual drill-and-panel ritual before a storm, and help with insurance. Shutters are cheaper today and keep you scrambling each June.
- Exterior finish. CBS with stucco matches the neighborhood; fiber-cement products like James Hardie siding give a different look but need different detailing near the coast. We point out the honest trade-off for your lot.
- Isolation from the main house. A sub-panel and its own meter, a tankless water heater, and independent HVAC zone cost more but let you rent it cleanly or house family without every utility crossing over.
What New Detached ADU Costs in The Crossings, FL

With standard finishes, a detached ADU in The Crossings runs $45,000 to $130,000. That range is wide on purpose, because the difference between the ends is mostly size, site work, and finish grade. A tight, well-planned one-bedroom sits near the bottom; a two-bedroom with custom cabinetry, impact everything, and a separate utility setup lands near the top.
Here’s what moves the number:
- Size and layout: more conditioned square footage means more block, slab, roof, and drywall.
- Site prep and utilities: how far the run is from your main panel and meter, and whether the lot needs fill or drainage work, can swing the job by thousands.
- Material grade: builder-grade cabinets and counters versus a curated line like KraftMaid or Cambria changes the finish budget substantially.
- Permit and engineering scope: wind-load engineering, impact-product approvals, and inspections are part of the cost, and are baked into our written quotes.
- Hurricane hardening: impact windows and a rated door versus shutters sit on different lines of the estimate.
A written estimate from us lists each line and shows you what’s included. The number you see is the number you pay, and it stays that way through the job. Projects over $10,000 also qualify for $1,000 off, and 0% financing for 18 months is available if you’d rather spread it out.
See the difference
Before
After
Before
After
Before
AfterWhat The Crossings Lots Do to a Detached ADU
The Crossings is a built-out master-planned community in ZIP 33186, and almost every home here went up in the same 1980s-1990s development window. That matters for an ADU: the lots are shaped by that era’s layout, so setbacks, drainage, and utility easements are often tighter than on newer ground, and the building department reviews plans against Miami-Dade’s post-Andrew high-velocity hurricane zone rules. Because these are CBS homes with barrel-tile or shingle roofs and screened pool enclosures, we plan an ADU’s roofline and finish to sit naturally beside them rather than look bolted on. HOA architectural review layers on top of county permitting, so we help you assemble the plan set and product approvals the review board asks for. The summer thunderstorms and intense sun also push us to schedule exterior framing and roofing early in the day, and the same hurricane exposure that drives impact glass in the main house drives it in the ADU.
Serving The Crossings, FL – Our Local Coverage Area
We serve The Crossings and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked About New Detached ADU in The Crossings

Plan for five to nine months total. Permits and hurricane-zone engineering are usually the longest single stretch at six to twelve weeks, and construction itself runs three to four months depending on size. Call (844) 834-8961 for a schedule built around your lot.
Yes, a detached dwelling always requires a full permit and inspections in Miami-Dade, including wind-load engineering. We pull the permits and walk the inspections so the unit is legal and insurable. Call (844) 834-8961 and we’ll explain what your plan set needs.
Usually yes, because a detached ADU ties into your existing utilities at the panel, meter, and sewer line rather than moving anything inside the main house. The work happens on the new slab and along the utility run. Call (844) 834-8961 to see how your site lays out.
Most jobs land between $45,000 and $130,000, driven by size, site work, finish grade, and hurricane hardening. Every quote from us is fixed with no change orders, and projects over $10,000 get $1,000 off. Call (844) 834-8961 for a free written estimate.
Every detachable ADU we build is backed by the 730-Day Done Right Promise: if anything isn’t done right, we make it right. That’s one of the longest workmanship guarantees in residential construction. Call (844) 834-8961 to hear exactly what it covers.
Get a Free Estimate for Your Detached ADU
If you’re ready to price a new detached ADU in The Crossings, call (844) 834-8961 to schedule a free on-site estimate. We’ll visit, measure your lot, talk through size and finishes, and leave you with a written, line-item quote you can compare against anyone else’s. A live person answers around the clock. Many of our The Crossings neighbors pair an ADU project with Concrete Driveways & Concrete Work in The Crossings or a Paver Driveways in The Crossings upgrade to reach the new unit, and when the project grows into a wider scope, it’s often part of a full Home Additions & ADU in The Crossings plan. You can also explore our Home Additions & ADU service and the The Crossings area we cover.