A Groundwork company - serving Kendale Lakes, FL
A new rear addition with a vaulted beamed ceiling and tall windows
Garage Conversion ADU · Olympia Heights, FL

Garage Conversion ADU in Olympia Heights - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Kendale Lakes
A second-story addition that matches the existing roofline
A remodeled family room with new windows and a window seat
A new wood side gate with black hardware
A new concrete driveway with a paver border
A stone counter, tile backsplash and open shelf after a kitchen remodel
A remodeled hall bathroom with subway tile and a floating vanity
New architectural shingles with a clean valley
A new casement window over a kitchen sink
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Garage Conversion ADU in Olympia Heights: What It Actually Takes

A garage conversion ADU in Olympia Heights usually runs $45,000 to $130,000 and takes 4 to 7 months from permit submission to final inspection. The job turns an existing attached or detached garage into a permitted, separately metered living unit: slab work, framing, insulated walls, a full bath, a kitchenette, electrical, and the county inspections that go with every one of those steps. Call (844) 834-8961 and we’ll walk your garage and give you a written, line-item number.

Call (844) 834-8961

How we take a garage from storage to a permitted unit, stage by stage

A single-story rear room addition with tall windows and a new patio

The sequence below is what a real Olympia Heights garage conversion ADU looks like. Timelines assume the county and the homeowner both move without stalling it.

Stage 1: Assessment and design (2 to 4 weeks)

We measure the slab, check the ceiling height against what a habitable room needs, and open the electrical panel to see whether it has room for the new circuits. On a 1950s block home, that panel is often a 100-amp service already carrying more than it should, and the answer is a service upgrade. You decide the layout here: one room or a room plus a sleeping alcove, where the bath sits, whether the kitchenette goes against the existing shared wall. This is also when you choose whether the unit stays part of the main house or gets its own meter.

Stage 2: Permit submission (3 to 6 weeks in unincorporated Miami-Dade)

The plan set goes to Miami-Dade County, not to a city building department, because Olympia Heights is unincorporated. You don’t submit anything: we file, respond to the plan reviewer’s comments, and pull the permit. Plan review is the single biggest variable in the schedule, and a clean set with the structural and energy calcs attached moves faster than an amended one.

Stage 3: Demolition, slab and shell (2 to 4 weeks)

Out comes the garage door, the tracks, the opener, and any old storage framing. We grind and level the slab, pour a curb for the new bath, frame the new walls and ceiling, and close the old vehicle opening. Because the new floor has to sit above the outside grade, we build a raised subfloor or a shallow pour, whichever the slab condition allows. This is the noisiest, dirtiest stretch and the one your neighbors will notice.

Stage 4: Rough-in trades and inspections (4 to 6 weeks)

Plumbing, electrical, and mechanical go in and get inspected before anything gets covered. If the bath drains can’t tie into the house line at a workable slope, this is where a lift pump or a re-routed line shows up and where budgets move. You’ll decide fixture rough locations now; after the drywall goes up, they’re expensive to change.

Stage 5: Insulation, drywall, finishes, final inspection (4 to 6 weeks)

Insulation and drywall go in, then tile, cabinetry, paint, and the mini-split. We schedule the final inspection, hand over the signed-off permit, and walk you through the unit. The contractor’s job ends when the county signs off and the 730-Day Done Right Promise is on paper for the work we did.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The choices that change your number the most

  • Slab versus raised floor: Keeping the existing slab is the cheapest path. A raised wood subfloor over sleepers costs more but handles moisture wicking from the slab better, which matters in a humid climate.
  • Bath plumbing position: Lining the new bath up with the house’s existing drain stack keeps the job in the low range. A bath on the far side of the garage can add thousands in re-routed drain line and possibly a lift pump.
  • Kitchenette grade: A simple sink, two-burner cooktop and a fridge niche is one spec. A full cabinet-and-counter setup with a real range pushes the price toward the high end and can affect the permit scope.
  • Cooling: A ductless mini-split is the norm and cheap to run. Tying into the main house air handler only works if the existing system has capacity, which on 1950s stock it usually doesn’t.
  • Windows and doors: Any new exterior opening needs Miami-Dade NOA-approved impact product. You’ll pick between aluminum impact windows and impact-rated French or sliding doors, and the spec sheet matters as much as the look.
  • Exterior skin: Stucco to match the house is standard here and keeps the unit looking original. Lap siding reads cleaner to some buyers but breaks the streetscape on a block of concrete-block homes.

What Garage Conversion ADU costs in Olympia Heights, FL

A framer checking new wall framing on a home addition

Plan on $45,000 to $130,000. Where you land depends on a handful of variables, not on square footage alone:

  • Service upgrade: A 100-amp panel that has to be replaced with a 200-amp service can add several thousand to the electrical line.
  • Roof: If the garage shares a low-slope roof that’s at the end of its life, you’re replacing it as part of the job. That’s not optional once the ceiling comes open.
  • Bath and kitchenette scope: A full bath is the single biggest line item after framing. The further the drains run, the more it grows.
  • Finish level: Tile versus vinyl, custom versus stock cabinetry, and fixture grade all sit in the estimate. The difference between a rental-grade and a family-grade unit is real money.
  • Permit exposure: A structure that was ever enclosed without a permit, or a carport that was converted informally, means bringing the existing work up to code before the new work can be signed off.

Your written estimate breaks out labor, materials, permit fees, and inspections line by line, and the number you sign is the number you pay. It covers drawings, permit submission, all trades, and final inspection sign-off. It does not cover landscaping, driveway repair where a new utility trench crosses it, or furniture, appliances and finishes you buy separately. $1,000 off applies to this job since it’s over $10,000, and 0% financing for 18 months is available.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Olympia Heights homes specifically do to this job

Because Olympia Heights sits in unincorporated Miami-Dade, every permit for a garage conversion ADU runs through the county, and every window, exterior door and roof section needs Miami-Dade product approval under the wind-borne debris rules. If the garage currently has a flat or low-slope roof, we often find it sitting on undersized or repaired framing, and the plan reviewer will want to see it addressed. The housing stock is mostly 1950s-to-1970s concrete block and stucco along gridded streets, with original single-pane jalousie or aluminum windows and carports that owners have already half-enclosed. That means a fair share of our Olympia Heights garage conversion ADU work starts with legalizing what’s already there before we can frame anything new. Salt air off Biscayne Bay and the June-through-November storm season push us toward mold-resistant drywall and impact-rated product on every opening. If you’re also reworking the driveway where the utility trench will cross, homeowners often pair this with Concrete Driveways & Concrete Work in Olympia Heights to finish the front of the house in one pass.

Serving Olympia Heights, FL – Our Local Coverage Area

We serve Olympia Heights and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently asked about Garage Conversion ADU in Olympia Heights

A new roof with clean valleys and new flashing

Get a real number on your Olympia Heights ADU

Call (844) 834-8961 for a free on-site estimate. We’ll measure the garage, check the slab, the panel, and the roof framing, and hand you a written line-item quote with permits, inspections and the 730-Day Done Right Promise spelled out. No change orders, no surprises. If you’re in Westchester, Westwood Lakes, Sunset or Fountainebleau, we’ll come out too.

Written by the team at Groundwork Construction Co.

Why Olympia Heights Chooses Groundwork Construction Co. of Kendale Lakes

We set the standard for garage conversion ADU in Olympia Heights.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Olympia Heights

Getting your garage conversion ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your garage conversion ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local garage conversion ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Olympia Heights Customers Say

Trusted by homeowners across Olympia Heights and surrounding areas.

★★★★★

"He pulled the permits himself, scheduled every sub and ran the inspections. I made one decision a week and otherwise stayed out of it, which is exactly what I was paying for."

Robert Sullivan
★★★★★

"Found unpermitted work by the previous owner once he opened the wall. He stopped, explained the options and what each would cost, and let me decide rather than making it my emergency."

Marco Castillo
★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A remodeled primary bathroom with a soaking tub and walk-in showerA new clay tile roofNew double-hung windows in a dining roomA new front yard fence with a matching gateA new paver pool deckAn open kitchen and dining area after a remodel

More services in Olympia Heights

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Kendale Lakes

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Kendale Lakes team

A local vetted partner works across Kendale Lakes and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for Garage Conversion ADU in Olympia Heights?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Olympia Heights.

(844) 834-8961

Request a Free Estimate in Olympia Heights

Tell us about your garage conversion ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Us
Local Service Coverage
Call Now - 24/7 Dispatch