A Groundwork company - serving Kendale Lakes, FL
A new rear addition with a vaulted beamed ceiling and tall windows
Garage Conversion ADU · Tamiami, FL

Garage Conversion ADU in Tamiami - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Kendale Lakes
A second-story addition that matches the existing roofline
A remodeled family room with new windows and a window seat
A new casement window over a kitchen sink
A new white vinyl privacy fence with a double gate
New painted shaker cabinets with an organized deep drawer
A remodeled hall bathroom with patterned floor tile and painted walls
A remodeled kitchen with a waterfall island and wood cabinets
A wood double vanity with two mirrors after a bathroom remodel
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Garage Conversion ADU in Tamiami, FL: What It Costs and How Long It Takes

A garage conversion ADU in Tamiami typically runs $35,400 to $94,400 and takes 10 to 16 weeks from demolition to final inspection. You’re turning existing square footage under a roof you already own into a permitted, rentable or family-ready living unit, which is why it lands well below the $106,200 – $259,600 range of a ground-up ADU. Most of the work is interior: slab, framing, insulation, electrical, plumbing, and a new door-and-window package that has to hold up to Miami-Dade wind code. Call (844) 834-8961 for a free on-site estimate and we’ll walk the slab with you.

Call (844) 834-8961

How a Garage Conversion ADU Comes Together, Stage by Stage

A garage converted into a guest room and home office

Here’s the actual sequence we run in Tamiami, with the decision points that land on you.

Stage 1: Feasibility and permit drawings (weeks 1 – 3)

We measure the garage, confirm ceiling height and slab condition, and check the setback and impervious-surface math on your lot. In this part of the county, that stormwater calculation is often what decides whether a conversion is the cheaper route over a new build. You approve a scope and finish level here. Drawings go to Miami-Dade for review.

Stage 2: Demo and slab prep (week 4)

The overhead door comes out, the existing slab gets scanned for cracks and moisture, and we grind or pour a self-leveling topping if the floor is out of flat. Old drywall, insulation, and any abandoned wiring go to the dumpster. You pick floor finish after this stage, once you’ve seen the slab.

Stage 3: Framing, rough-in, and the building shell changes (weeks 5 – 8)

New partition walls go up. Electrical, plumbing, and mechanical rough-ins run next, then the door and window package gets installed and flashed. This is where wind-rated glazing and the door system you chose at contract get set. Rough inspection happens before anything closes up.

Stage 4: Insulation, drywall, and finishes (weeks 9 – 13)

We insulate with mold-resistant assemblies suited to the humidity, hang and finish drywall, then set cabinets, counters, fixtures, and trim. You’ll make the bulk of your material selections in weeks 5 – 7 so nothing stalls the schedule.

Stage 5: Final inspection and punch (weeks 14 – 16)

The county signs off, we walk the unit with you, and we close the punch list. Every job is backed by the 730-Day Done Right Promise, and most jobs are completed in a single visit once trim and fixtures start going in.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Choices You’ll Make on a Garage Conversion ADU

The finish decisions move the price more than anything else in the build. Here’s what you’ll actually pick between:

  • Flooring: Polished concrete runs lowest and handles humidity without swelling. Luxury vinyl plank costs more but gives you a warmer, quieter floor. Tile suits a garage that had moisture issues.
  • Door and window package: Impact-rated units carry the biggest upfront cost but satisfy Miami-Dade wind code outright and cut insurance premiums. Standard units with shutters meet code too, but you lose the clean lines and the ease of use.
  • Kitchenette: A wet bar with a sink and mini-fridge sits at the low end. A full kitchenette with a two-burner cooktop and 30-inch cabinet run pushes toward the high end. Cabinetry from brands like KraftMaid holds up better than builder-grade in a humid unit.
  • Bathroom: A half-bath is cheapest. A three-quarter bath with a walk-in shower adds plumbing runs and waterproofing.
  • HVAC: A dedicated mini-split keeps the unit separately metered, which matters if you plan to rent it. Tying into the house system is cheaper but couples the two spaces.

What Garage Conversion ADU Costs in Tamiami, FL

A framer checking new wall framing on a home addition

Plan on $35,400 to $94,400 for a garage conversion ADU in Tamiami, FL, with the midpoint landing near $65,000 for a one-bedroom unit with a kitchenette and full bath. Five variables push the number:

  • Size of the garage: A 240-square-foot single bay converts for less than a 480-square-foot double bay. Square footage drives framing, drywall, flooring, and finish cost directly.
  • Slab and ceiling condition: A cracked or uneven slab needs repair or a topping pour. Low ceiling height can limit shower and closet layouts.
  • Relocating plumbing and electrical: Tying into a nearby stack is cheap. Running new lines across the slab adds cost and requires cutting and repouring.
  • Material grade: Builder-grade finishes sit at the bottom of the range. Premium cabinets, counters, and impact glazing push toward $94,400.
  • Permit scope: A full kitchen and bathroom expand the review and inspection count compared to a studio with a wet bar.

Your written estimate will be line-itemed so you can see each of these. Expect the number you see to be the number you pay, no change-order surprises. What’s sometimes not included: separate utility meters, landscaping restoration, and furniture or appliances beyond what you spec.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Tamiami Homes Specifically Do to This Job

Tamiami’s housing stock is mostly 1960s to 1990s concrete block ranchers and low-rise Mediterranean townhomes, and the garages in that build era show predictable problems. We routinely find cracks in the original slab, garage doors that never sealed well enough to keep humidity out, and undersized electrical panels that a new kitchenette and mini-split will overload. Because Tamiami sits at the western edge of dense Miami-Dade where the subdivisions along SW 8th Street (Calle Ocho) meet the Everglades buffer, the county’s floodplain and stormwater rules apply hard here, and a high water table plus sandy limestone soil means even a small footprint change can trigger dewatering review. The area’s farming past left pockets of arsenic-laden soil that require special handling on any excavation, so we test before we break ground. Storm season adds real rain delays between May and October. If the conversion is part of a full Home Additions & ADU in Tamiami scope, we sequence it so the ADU doesn’t hold up the rest of the build.

Serving Tamiami, FL – Our Local Coverage Area

We serve Tamiami and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked – Garage Conversion ADU in Tamiami

A galley kitchen opened up to the dining room with a new peninsula

Get a Free Estimate for Your Tamiami Garage Conversion ADU

Give us a call at (844) 834-8961 and a live person answers, day or night. We’ll schedule a free on-site estimate, walk your garage, and hand you a line-itemed quote with the permit scope and timeline spelled out. No pressure to sign anything. If you’re weighing the conversion against other work, homeowners often pair this with Concrete Driveways & Concrete Work in Tamiami or Asphalt Driveways & Resurfacing in Tamiami. You can also see our broader Home Additions & ADU work and our full Tamiami service coverage.

Written by the team at Groundwork Construction Co. of Kendale Lakes.

Why Tamiami Chooses Groundwork Construction Co. of Kendale Lakes

We set the standard for garage conversion ADU in Tamiami.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Tamiami

Getting your garage conversion ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your garage conversion ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local garage conversion ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Tamiami Customers Say

Trusted by homeowners across Tamiami and surrounding areas.

★★★★★

"He pulled the permits himself, scheduled every sub and ran the inspections. I made one decision a week and otherwise stayed out of it, which is exactly what I was paying for."

Robert Sullivan
★★★★★

"Found unpermitted work by the previous owner once he opened the wall. He stopped, explained the options and what each would cost, and let me decide rather than making it my emergency."

Marco Castillo
★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A newly finished roof with a ridge vent and step flashingA new front entry door with glass sidelightsA new black aluminum pool fence with a gateA new curved paver walkway to the front porchA walk-in shower with large-format tile and a built-in nicheA standing-seam metal roof over a covered porch

More services in Tamiami

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Kendale Lakes

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Kendale Lakes team

A local vetted partner works across Kendale Lakes and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for Garage Conversion ADU in Tamiami?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Tamiami.

(844) 834-8961

Request a Free Estimate in Tamiami

Tell us about your garage conversion ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Us
Local Service Coverage
Call Now - 24/7 Dispatch