How Long Does It Take to Build an ADU? (Kendale Lakes, FL)

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Kendale Lakes
A single-story rear room addition with tall windows and a new patio
A second-story addition that matches the existing roofline
New painted shaker cabinets with an organized deep drawer
A remodeled hall bathroom with patterned floor tile and painted walls
A remodeled kitchen with a waterfall island and wood cabinets
A wood double vanity with two mirrors after a bathroom remodel
A new roof with clean valleys and new flashing
A new multi-panel patio door opening a kitchen to the patio
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate
Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence
Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

How Long Does It Take to Build an ADU in Kendale Lakes? Plan on 8 to 14 Months, Not the 3 to 6 Everyone Quotes

Building an ADU in Kendale Lakes takes roughly 8 to 14 months from the day you commit to a design, not the 3 to 6 months a contractor quotes over the phone. The build itself is often only 10 to 20 weeks of that. The rest is swallowed by HOA architectural review, Miami-Dade ePlan permit review, HVHZ inspection sequencing, and impact-window procurement. The clock doesn’t start when you sign. It starts when your HOA approves the drawings, and that can be 6 to 10 weeks after you’ve already paid for them. Call (844) 834-8961 and we’ll walk you through where your specific property sits in that line.

professional home additions & adu service in Kendale Lakes, FL
A garage converted into a guest room and home office

Where the Months Actually Go in Kendale Lakes

Kendale Lakes is a build-out 1970s and 80s planned subdivision west of the Turnpike. There are no vacant lots to start fresh on. Every ADU here is a rear-yard addition or garage conversion attached to an existing concrete-block tract home, and that changes the timeline because the county has to reconcile your new structure against a house built at the pre-to-post-Andrew code transition.

Here’s the realistic phase breakdown for a detached one-bedroom ADU in Kendale Lakes:

Phase Typical Duration What Slows It Down
HOA architectural review 4-10 weeks Incomplete drawings, required neighbor notices, board meeting schedules
Miami-Dade ePlan permit review 6-12 weeks ADU complexity, setback questions, HVHZ wind-loading corrections
Material procurement 4-8 weeks Peak-season lead times on impact windows and roofing systems
Construction 10-20 weeks Scope, HVHZ inspection scheduling, weather
Final inspections & closeout 1-3 weeks County inspection queue availability

For a fuller picture of what your project will involve, see our Home Additions & ADU service page. For planning the whole house around it, start at our home page.

HVHZ Inspections: The Step That Resets the Queue

Miami-Dade’s High Velocity Hurricane Zone code requires mandatory county inspections at specific milestones on any new structure here. Framing, rough-in, roof-to-wall tie verification, and continuous waterproofing all get their own inspection. Miss one or fail one and you don’t lose a day. You lose your place in the scheduling queue, and that adds weeks.

The reason this hits Kendale Lakes harder than newer Florida subdivisions: roof decking, straps, and opening protection on these homes often need upgrading to current HVHZ standards even on a straightforward build. A framing inspection that would pass cleanly on a 2020 build can turn up tie-down corrections on a 1982 CBS home. We plan for that discovery window up front rather than letting it blow the schedule.

A framer checking new wall framing on a home addition

Materials Don’t Wait for Your Permit

Impact windows from Andersen or Marvin, and roofing systems from GAF or Owens Corning, carry the longest lead times here. During hurricane season, June through November, South Florida’s supply chain tightens and those lead times stretch. A project that starts framing in late spring can hit 10 to 14 week waits on roofing materials during peak demand.

We order impact windows and roofing early, before the permit clears, so procurement overlaps with the county review rather than stacking behind it. That single move is worth weeks. For a durability comparison across brands like Boral and PGT, our impact window installation in Kendale Lakes guide is a good starting point.

Common Local Scenarios That Stretch the Timeline

  • Garage conversion on a 1978 home: Often the fastest path at 4 to 6 months because you’re working within the existing footprint and skipping some site-work review. Budget $30,000-$80,000.
  • Detached ADU with HOA architectural review: Add 4 to 10 weeks before the permit clock even starts if the board meets monthly.
  • Late-spring start date: Hurricane-season procurement pressure pushes roofing and window lead times, so a project that breaks ground in May may finish in December rather than October.
  • Pre-Andrew roof structure: A framing inspection can surface strap or decking upgrades that need a design revision and resubmittal, adding 3 to 6 weeks.

What an ADU Costs in Kendale Lakes

Full ADU construction in Kendale Lakes runs $90,000-$220,000 depending on whether it’s detached or a conversion, and the size and finish package. Garage conversions sit at $30,000-$80,000. For scale, a full home addition runs $45,000-$130,000, so an ADU is a serious line item worth planning carefully.

HVAC technician diagnosing and repairing an outdoor air conditioning condenser unit in Kendale Lakes, FL

Upfront pricing means the number you see is the number you pay. We also back every project with 0% financing for 18 months and $1,000 off projects over $10,000, which makes the planning phase a lot less painful.

Why Groundwork Compresses the Waiting

Groundwork Construction Co. of Kendale Lakes answers the phone with a live person, 24/7. That sounds small until you’ve spent three days waiting to hear whether an inspection passed or the HOA board asked a follow-up question. Inspection scheduling, permit status checks, and HOA responses get handled in real time, not queued until Monday. That administrative dead time is exactly what inflates most ADU timelines, and it’s the part we control.

Our technicians have up to 12 years of experience building to Miami-Dade HVHZ standards, and every one is background-checked and arrives in uniform. Every ADU we build is covered by the 730-Day Done Right Promise: if a rushed detail causes a waterproofing or flashing issue that shows up in the first two rainy seasons, we make it right. That long guarantee is why we don’t shave the schedule at the expense of the envelope.

Looking at a nearby project? Our guides on home addition in Kendale Lakes, garage conversion in Kendale Lakes, and ADU construction in Kendale Lakes cover the scope differences. If you’re comparing markets, see Home Additions & ADU in Miami and Home Additions & ADU in Hialeah. For the surrounding work an ADU often triggers, our roof replacement in Kendale Lakes, Home Additions & ADU in Kendale, and Home Additions & ADU in Sweetwater pages are useful.

FAQs

Getting started with Groundwork in Kendale Lakes

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Kendale Lakes team

A local vetted partner works across Kendale Lakes and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise
Need Construction help in Kendale Lakes? Licensed & insured · free written estimates
Call (844) 834-8961
Local Service Coverage

Request a Free Estimate in Kendale Lakes

Tell us what you need - Groundwork Construction Co. of Kendale Lakes responds fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Us
Call Now - 24/7 Dispatch