New Detached ADU in Olympia Heights, FL: What It Takes and What It Costs
A New Detached ADU in Olympia Heights usually runs $45,000 to $130,000 and takes six to nine months from the first plan drawing to the final inspection. The number depends on size, whether you’re demolishing an old shed or concrete slab first, and how much utility work the lot demands. Call (844) 834-8961 for a free on-site estimate with a written, upfront scope before you commit to a single dollar.
How We Build a Detached ADU Here, Stage by Stage

We run every detached structure the same way, and we tell you up front what you’ll be deciding and when. Here’s the real sequence, not a brochure version.
Stage 1: Site walk and feasibility (week 1)
We measure the lot, confirm setbacks against Miami-Dade County requirements, check where the existing electrical panel and water service can carry a second structure, and look at what’s already on the ground. You get a written scope and a fixed price. This is where we rule out problems the last contractor missed, like an undersized service mast or a setback that constrains the footprint to a smaller unit than you pictured.
Stage 2: Design, engineering, and county permitting (weeks 2 through 10)
Working drawings get stamped by an engineer, then submitted to Miami-Dade County for plan review. Because Olympia Heights is unincorporated, there’s no separate city building department to clear. That’s one less stop, but Miami-Dade’s review is thorough, and hurricane-zone product approval means every window, door, and roof assembly needs a current Miami-Dade NOA on file. Your decision point here is size and layout. A 400-square-foot studio and a two-bedroom 750-square-foot unit are a different permit package, a different slab, and a different budget.
Stage 3: Site prep and slab (weeks 10 through 14)
Old carports, sheds, and stray concrete come out. We grade for positive drainage away from both the ADU and the main house, run underslab plumbing for the bathroom and kitchenette, and pour the footing and slab. Inspections happen at framing and rough-in before anything gets closed up.
Stage 4: Shell and rough-ins (weeks 14 through 22)
Concrete block and stucco go up, matched to the main house’s material so the structure doesn’t look bolted on. Roof, impact windows and doors, electrical panel and circuits, plumbing, and HVAC get roughed in. This is where the timetable most often stretches, since materials ship on their own schedule and each rough trade gets its own inspection.
Stage 5: Finishes and final inspection (weeks 22 through 30)
Drywall, flooring, cabinets, fixtures, paint, and landscaping back to grade. Final electrical, plumbing, and building inspection. You walk through with us before we call it done, and everything falls under our 730-Day Done Right Promise, one of the longest workmanship guarantees in residential construction.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Options You’ll Decide Between
Most of the budget swings happen in these choices. Here’s the honest trade-off on each.
- Size and layout. A studio in the 400 to 500 square-foot range sits near the low end of our $45,000 to $130,000 span; a two-bedroom with a full kitchen pushes toward the top. Every extra plumbing fixture adds cost, so a kitchenette over a full kitchen saves both money and permit complexity.
- Block versus wood frame. Concrete block and stucco cost more up front but hold up better in Miami-Dade humidity and match the surrounding homes. Wood frame is faster and cheaper on paper, but here it means more detailing to keep moisture out, and many buyers don’t want the maintenance.
- Impact glass versus shutters. Miami-Dade’s wind-borne debris rules apply to every opening. Impact windows and doors eliminate the annual shutter routine and can help on insurance, while code-compliant shutters plus standard glazing cost less upfront but mean real work each hurricane season.
- Roof system. A low-slope assembly matches the flat rooflines common on these blocks; a pitched metal or shingle roof looks more residential and drains faster but adds framing cost. Either way, the material needs current product approval.
- Utilities. Upgrading the main electrical service or running a new meter to the ADU affects how it’s metered and billed. A panel upgrade is a common line item, not an optional one, when the existing service is already maxed.
- Finishes. Builder-grade cabinets and vinyl flooring versus custom touches is where the final ten to fifteen percent of the budget lives. Steel or fiberglass entry doors and simple, hard-wearing surfaces hold up best to tenant turnover.
What a New Detached ADU Costs in Olympia Heights, FL

Plan on $45,000 to $130,000 for a detached unit here, with the most common requests landing between $70,000 and $110,000. Here’s what moves that number:
- Footprint and bedroom count: each additional bedroom and bathroom adds framing, plumbing, and electrical, and pushes the total up.
- Site condition: an empty, level lot is the low end. Removing an old carport, cutting trees, or re-grading pushes toward the top.
- Utility infrastructure: an electrical service upgrade or a long trench to reach a rear lot corner is real money.
- Material grade: impact glazing, block construction, and higher-end finishes add up; builder-grade elsewhere keeps the price down.
- Permit scope: accessory structures, utility tie-ins, and inspection rounds are all part of the county package, and a bigger or more complex layout means more rounds.
Your written estimate lists every line: site work, slab, structure, roof, openings, mechanical, electrical, plumbing, finishes, permits, and inspections. What it won’t cover on any honest bid is landscaping, fencing, or anything not on the lot plan. We quote those separately if you want them, and the price you see is the price you pay. No change orders from left field.
See the difference
Before
After
Before
After
Before
AfterWhat Olympia Heights Homes Specifically Do to This Job
Most of Olympia Heights was built out between the 1950s and ’70s, so the lots are gridded and the homes are concrete-block and stucco, many with original single-pane jalousie windows and flat or low-slope roofs. That housing stock shapes this job in a specific way: when a homeowner adds a detached unit behind the main house, we routinely find the original electrical panel can’t carry a second structure, and the drainage grade runs the wrong way. Both get fixed before the county will close the permit.
Because Olympia Heights sits in unincorporated Miami-Dade, everything runs through county permitting and inspection, with no separate city department to clear. That one fact changes the schedule, and it also means every window, door, and roof assembly needs current Miami-Dade product approval. Salt-laden air off Biscayne Bay and the June-through-November hurricane season mean we build around wind mitigation, waterproofing, and mold-resistant detailing rather than cold-weather concerns. You’ll see us working the blocks off Southwest 40th Street and along Coral Way regularly, and we cover the rest of Olympia Heights the same way.
Serving Olympia Heights, FL – Our Local Coverage Area
We serve Olympia Heights and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked Questions About New Detached ADUs in Olympia Heights

Expect six to nine months from the first site walk to final inspection. Design and county plan review alone take roughly eight to ten weeks, construction runs another four to five months, and the rest is scheduling inspections and waiting on materials. Call (844) 834-8961 and we’ll give you a schedule specific to your lot.
Yes. Any detached habitable structure requires a Miami-Dade County building permit, and plan review covers structural, electrical, plumbing, and wind-mitigation requirements. We pull the permit and handle the inspections, including the product approvals every opening needs. If a contractor offers to skip the permit, walk away.
Often, but not always. If the existing service and water line have enough capacity to feed a second structure, a separate meter and tie-in are simpler. On many older Olympia Heights homes the panel is already full, and the honest answer is that a service upgrade is part of the job. We check this on day one so it isn’t a surprise line item later.
Our projects run $45,000 to $130,000, with the range set by size, site condition, utility work, material grade, and permit scope. Once your written estimate is signed, that number holds unless you change the scope on purpose. Call (844) 834-8961 for an exact quote, and estimates are free.
Every new detached ADU falls under our 730-Day Done Right Promise, one of the longest workmanship guarantees in residential construction. If something isn’t done right in that window, we come back and make it right. Your call is answered by a live person, 24/7, and our background-checked technicians arrive in uniform.
Get a Free Estimate for Your New Detached ADU in Olympia Heights
Call (844) 834-8961 to schedule a free on-site estimate for your New Detached ADU in Olympia Heights. We’ll walk the lot, check setback and utility capacity, and hand you a written, line-item scope with a fixed price and a real timeline. If you’re also planning a wider build or considering Home Additions & ADU in Olympia Heights, mention it on the call so we scope both together. See our full Home Additions & ADU line, and homeowners often pair this project with Concrete Driveways & Concrete Work in Olympia Heights or Paver Driveways in Olympia Heights to finish the access path.