New Detached ADU in Westchester, FL: What It Actually Takes
A new detached ADU in Westchester typically runs $90,000 – $220,000 for a full build, while the smaller garden-style and garage-adjacent units we see quoted most often here land in the $45,000 – $130,000 band. Plan on 6 to 10 months from first site visit to final inspection, with the permit and product-approval phase accounting for a large share of that. Call (844) 834-8961 and we’ll walk your specific lot and answer the real question: what will a detached unit cost on this property.
How a New Detached ADU Gets Built Here, Stage by Stage

Detached units are their own animal. They don’t piggyback on your house’s footprint, so every trade starts from zero. Here’s how the sequence runs on a typical Westchester lot.
Stage 1: Site walk and feasibility (week 1)
We measure setbacks, locate the septic or sewer lateral, check the electrical service and where the meter sits, and confirm the lot can legally hold a structure of the size you want. You decide the unit size and whether it’s a studio, one-bedroom, or two-bedroom layout. This is the week to be honest about budget, because the answer changes with every square foot.
Stage 2: Design and permit package (weeks 2 through 10, often longer)
Drawings go out, and the permit package comes together. Under Miami-Dade’s High-Velocity Hurricane Zone rules, every product touching the envelope needs a Notice of Acceptance, and wind-load calculations are part of the submittal. You’re choosing exterior finish and roof type during this window, because those choices feed the paperwork. This stage is where most schedules slip, and it’s rarely the builder’s fault.
Stage 3: Site prep and foundation (2 to 3 weeks)
Clearing, grading, and the slab or stem-wall foundation. On built-out lots in 33165, access is the constraint. A unit in the backyard means materials come through a side gate or over a fence line, and that gets planned before a single form goes down. You decide the final placement and the utility trench routes here.
Stage 4: Shell and rough-in (6 to 10 weeks)
Framing, roofing, windows and doors, then electrical, plumbing, and mechanical rough-in. Inspections happen at each rough stage, and the pacing depends on how fast the county can get out. You pick your window and door package and your exterior cladding before framing starts, not after.
Stage 5: Finishes and final inspection (4 to 6 weeks)
Insulation, drywall, flooring, cabinets, fixtures, paint. Then the final inspection and the certificate of occupancy, which is the paperwork that makes the unit legally usable as living space. You make your last material calls at the start of this stage so nothing sits waiting on a decision.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Choices That Actually Move the Number on a Detached Unit
Two ADUs of the same square footage can land $60,000 apart. The differences are almost always in these decisions.
- Foundation type: A simple slab is the cheapest path. Stem-wall or raised construction costs more but can make sense where drainage or grade is a problem. On flat Westchester lots, slab wins most of the time.
- Roof assembly: A low-slope flat roof with a proper membrane system handles the summer downpours well but needs attention over time. A pitched metal roof costs more up front and lasts longer in this sun. Both need hurricane-zone product approval.
- Exterior cladding: Stucco over concrete block matches the surrounding housing stock and holds up to UV. Fiber-cement siding is lighter and faster to install but needs repainting on a schedule in this climate. James Hardie is the name most homeowners land on for the siding route.
- Windows and doors: Impact-rated units cost more than standard but are effectively required here for a permitted structure, and they cut noise from a busy street. Andersen and Pella both have product lines that fit the approval process.
- Kitchenette and bath scope: A full kitchen with a range, vent hood, and 240V circuit costs meaningfully more than a kitchenette with a sink and microwave. Same story on the bathroom: a walk-in shower is simpler and cheaper to build than a tub-and-shower combo in a tight footprint.
What a New Detached ADU Costs in Westchester, FL

The honest range is $90,000 to $220,000 for a detached accessory dwelling unit, and the $45,000 – $130,000 band covers the smaller configurations, garage-adjacent builds, and simplified layouts. Here’s how the money breaks down.
| Line item | Typical range |
|---|---|
| Design and permit package | $6,000 – $18,000 |
| Site prep and foundation | $10,000 – $25,000 |
| Shell, framing, roof | $35,000 – $80,000 |
| Electrical, plumbing, mechanical | $12,000 – $30,000 |
| Windows, doors, exterior finish | $10,000 – $28,000 |
| Interior finishes | $18,000 – $45,000 |
What pushes a job to the high end: square footage past roughly 600 feet, a second bathroom, full kitchen appliances, and any need to upgrade your main electrical service to carry a second structure. What keeps it low: a compact footprint, a kitchenette instead of a full kitchen, and a slab foundation with no site complications. A written estimate from us lists each line so you can see exactly what’s included and what isn’t. Landscaping, fence work, and any separate utility tap fees typically sit outside the build scope unless we’ve written them in.
See the difference
Before
After
Before
After
Before
AfterWhat Westchester Homes Specifically Do to This Job
Westchester (33165) is a built-out, largely post-1950s unincorporated pocket, which means there’s essentially no vacant land left. Every detached unit here is squeezed into a backyard behind a 1950s to 1970s concrete-block house with a flat or low-slope roof. That changes everything about how we plan access, staging, and setbacks. Because the surrounding fabric is so dense, we schedule concrete deliveries and crane lifts around the parking reality on the side streets off Bird Road and around the residential blocks near Tropical Park. Homeowners here often pair the ADU build with a new Concrete Driveways & Concrete Work in Westchester pour so the unit has its own parking pad, and sometimes a Paver Driveways in Westchester finish instead. The Miami-Dade hurricane-zone permitting is the other reality: product approvals and wind-mitigation details, not the framing, set the schedule. We work throughout Westchester and the surrounding blocks.
Serving Westchester, FL – Our Local Coverage Area
We serve Westchester and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – New Detached ADU in Westchester

Expect 6 to 10 months total, with permit and product-approval time eating a large chunk of it. Construction itself usually takes 3 to 5 months once the foundation is in. Call (844) 834-8961 for a realistic timeline on your lot.
Yes, always. A detached habitable structure requires full permitting under Miami-Dade’s hurricane-zone rules, including wind-load documentation and product approvals. There is no legal shortcut, and any contractor suggesting otherwise is a problem.
Usually yes, though the electrical service and the sewer or septic connection almost always get touched. If the main panel can’t carry a second structure, a service upgrade is part of the job. We confirm that on the first site visit.
The typical range is $90,000 to $220,000, with smaller and simplified builds landing in the $45,000 – $130,000 band. Size, bath count, kitchen scope, and site access are the biggest drivers. Call (844) 834-8961 for a line-item estimate.
Every project we build is covered by our 730-Day Done Right Promise. If something isn’t right, we make it right, in writing. That covers workmanship on the structure and finishes. Call (844) 834-8961 to walk through the details.
Get a Free On-Site Estimate for Your Detached Unit
A new detached ADU is a big decision, and it deserves a real number, not a guess. Call (844) 834-8961 and we’ll schedule a free on-site estimate at your Westchester property. We walk the lot, talk through the layout you have in mind, and hand you a written, line-item estimate. This is part of the broader work we do on Home Additions & ADU in Westchester and across our Home Additions & ADU service. Live person, 24/7. Upfront pricing, no surprises.
Written by the team at Groundwork Construction Co.