Garage Conversion ADU in The Crossings, FL: What It Costs and How Long It Takes
A garage conversion ADU in The Crossings typically runs $45,000 – $130,000 and takes 3 to 5 months from permit to final inspection. You’re turning an existing attached garage into a permitted living unit – framing, insulation, drywall, a full bathroom, a kitchenette, HVAC, and an impact-rated window or door package – without pouring a new foundation. Call (844) 834-8961 and we’ll walk your garage and give you a written, line-item estimate.
How we run a garage conversion, stage by stage

Every garage conversion ADU we build in The Crossings follows the same sequence. Here’s what actually happens and when.
Stage 1: Walkthrough and feasibility (week 1)
We measure the garage, check the existing slab, look at where the water heater and laundry connections sit, and confirm the ceiling height and any structural posts. You decide the unit’s layout at this stage, and you decide whether the garage door opening gets framed in with impact glazing or closed with block and stucco to match the house. Budget two to three days for us to turn that into a written scope.
Stage 2: Permitting and HOA architectural review (weeks 2 – 6)
Miami-Dade County requires a permit for a garage conversion ADU, and The Crossings is an HOA community, so the architectural review runs in parallel. This is the longest wait on the job and the one homeowners underestimate. We submit plans, coordinate the review, and respond to any corrections. You decide the door style, the stucco color, and the window trim here so the ARB package goes in complete the first time.
Stage 3: Demo and rough-in (weeks 6 – 10)
We pull the old garage door and track, demo the interior, frame the bathroom walls, and set the rough plumbing and electrical. HVAC gets run from the main house or a dedicated mini-split, depending on how far the run is. A rough-in inspection happens before anything gets closed up. Your decisions: fixture locations and the electrical layout.
Stage 4: Insulation, drywall, and finishes (weeks 10 – 16)
Spray foam on the exterior walls and the ceiling plane keeps a South Florida garage from baking in July. Then drywall, texture, tile, flooring, cabinets, and paint. This is where finish grade drives the price – stock cabinets and a tile shower versus semi-custom and a glass enclosure.
Stage 5: Final inspections and walkthrough (weeks 16 – 20)
Final building, electrical, plumbing, and mechanical inspections, then a walkthrough with you. We hand over the signed-off permit and your 730-Day Done Right Promise in writing. Most of the schedule risk in a The Crossings garage conversion ADU sits in stages 2 and 5, not in the construction itself.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The choices that shape your garage conversion
A garage conversion ADU is mostly a decision job. These are the forks most The Crossings homeowners stand at:
- Garage door opening: Framing in a wall with impact-rated windows keeps the exterior looking like a house and passes HOA review easily; blocking it solid with stucco is cheaper and darker inside. Impact glazing adds cost but the wind-mitigation credit can offset it.
- Bathroom wet wall: Tying into the existing laundry drain and vent keeps plumbing short; moving the stack across the slab adds cost and a concrete break-out.
- HVAC: A dedicated mini-split is simple and meters the unit separately; extending the main system costs less upfront but strains an aging air handler.
- Kitchenette grade: A sink, under-counter fridge, and stock cabinets versus a full induction cooktop and semi-custom cabinetry. This is one of the biggest swings in the budget.
- Flooring: Porcelain tile handles humidity and a wet bath threshold without complaint; luxury vinyl is faster and softer underfoot.
- Separate metering: If the unit could be rented, discuss a sub-meter with your electrician early. It affects panel capacity planning.
What Garage Conversion ADU costs in The Crossings, FL

The market range here is $45,000 – $130,000. A straightforward single-car conversion with a simple bath and kitchenette lands near the low end; a two-car garage with a full kitchen, separate HVAC, and premium finishes climbs toward the top. The variables that move the number:
- Size: A one-car garage is roughly 250 – 300 sq ft; a two-car is double that, and every trade scales with it.
- Existing condition: A slab that has settled or a garage sharing a wall with a failing roof underlayment adds repair scope before finishes start.
- Plumbing and electrical: Distance to the main panel and the water heater drives cost. A full panel upgrade or a new sub-panel is a real line item.
- Finish grade: Tile and stock cabinets versus stone and semi-custom moves the number by tens of thousands.
- Permit and HOA scope: Impact glazing for hurricane compliance and any ARB-required material upgrades are permitted work, not optional.
Your written estimate itemizes each of these with the number you’ll actually pay, and the upfront pricing holds. 0% financing for 18 months is available, and projects over $10,000 take $1,000 off.
See the difference
Before
After
Before
After
Before
AfterWhat The Crossings homes specifically do to this job
The Crossings is a built-out west Kendall community in ZIP 33186, and nearly every home went up in the same 1980s – 1990s development window. That matters for a garage conversion ADU in a way it wouldn’t in a newer subdivision. Those garages were built as car storage, so the slab is often thinner than a habitable floor needs and the ceiling usually carries no insulation at all – both get addressed in our scope, not discovered mid-job. Miami-Dade’s post-Andrew high-velocity hurricane zone code governs the impact glazing and wind mitigation on every permitted conversion here, and the HOA architectural review board layers its own door-style, color, and quiet-operation requirements on top. Whole blocks of The Crossings are hitting roof-replacement age together, so we routinely tie a conversion’s ceiling work into a roof underlayment job. If your driveway needs work alongside, homeowners often pair this with Asphalt Driveways & Resurfacing in The Crossings or Concrete Driveways & Concrete Work in The Crossings so the front elevation matches the finished unit. And where the conversion is part of a full Home Additions & ADU in The Crossings plan, we coordinate the two. Our Home Additions & ADU service covers the wider scope, and we handle The Crossings directly.
Serving The Crossings, FL – Our Local Coverage Area
We serve The Crossings and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently asked – Garage Conversion ADU in The Crossings

Plan on 3 to 5 months end to end, with permitting and the HOA architectural review consuming the longest single stretch – often 4 to 6 weeks. Construction itself runs 10 to 14 weeks once rough-in starts. Call (844) 834-8961 for a schedule built around your specific garage.
Yes. Miami-Dade County requires a building permit for a habitable garage conversion, and The Crossings HOA requires architectural review approval before work begins. We pull the permits and handle the inspections – no shortcuts and no unpermitted finish work, since that’s what surfaces at resale.
Often, yes. If the washer and water heater connections sit close to the planned bathroom, the wet wall stays short and no structural changes are needed. Where the layout forces a stack relocation across the slab, that adds scope. We’ll tell you in the walkthrough which side of that line your garage falls on.
Between $45,000 and $130,000 depending on size, finish grade, HVAC, and whether plumbing and electrical need to move. Call (844) 834-8961 for an exact quote – estimates are free.
Every conversion is backed by our 730-Day Done Right Promise in writing – if it isn’t done right, we make it right. That’s one of the longest workmanship guarantees in residential construction. Ask about it on the call.
Get a free garage conversion ADU estimate in The Crossings
Call (844) 834-8961 to schedule a free on-site estimate. You’ll get a written, line-item quote with the actual price for your garage, financing and promo details, and a realistic timeline. Live people answer the phone around the clock. Our technicians have up to 12 years of experience and show up background-checked and in uniform.