Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Garage Conversion ADU in Westwood Lakes, FL: What It Takes and What It Costs
A garage conversion ADU in Westwood Lakes typically runs $45,000 – $130,000 and takes 3 to 5 months from permit to final inspection. The job turns your attached or detached garage into a permitted, separately-accessed living unit: framing, insulation, full bath, kitchenette, electrical, plumbing, and impact-rated openings. Cost is driven mostly by whether plumbing has to be run across the slab and how much of the existing structure you keep. Call (844) 834-8961 to schedule a free on-site estimate and a written line-item scope.
How a Garage Conversion ADU Comes Together, Stage by Stage

This isn’t a room remodel with a bathroom bolted on. A garage conversion ADU is a small house grafted onto your existing footprint, and the sequence matters because each stage has to pass inspection before the next one closes up.
Stage 1: Feasibility and permit set (2 – 4 weeks)
The first walkthrough answers the questions that decide the whole budget: is the slab at grade, is there enough ceiling height after a raised floor, and where does the sewer tie-in land. You decide the unit’s layout now, because moving a bathroom wall after the permit is filed means a revision and a delay. We pull the permit through Miami-Dade County before anyone swings a hammer.
Stage 2: Demolition and slab prep (1 – 2 weeks)
Out goes the garage door, the opener, and any shelving or storage mezzanine. We cut a new exterior door and window openings framed to impact-rated assemblies, then float or re-pour the slab where elevation calls for it. This is the stage where a Westwood Lakes homeowner makes the call on whether the existing overhead door opening gets a fixed impact window wall or a new framed wall with a standard impact slider.
Stage 3: Rough-in (2 – 3 weeks)
Framing, then electrical, then plumbing, then HVAC, each inspected in that order. If the garage shares a wall with the house, we tie the new unit onto its own subpanel and its own mini-split rather than straining the existing service. Trenching a sewer line under the slab is the single biggest swing item you’ll hear about in the estimate.
Stage 4: Insulation, drywall, and moisture detailing (2 – 3 weeks)
South Florida humidity makes this stage a technical one, not a cosmetic one. We use closed-cell spray foam or rigid foam plus a vapor strategy that keeps the garage-side wall from sweating, then hang and finish drywall. Skipping the moisture detailing is the most common cause of a musty conversion in this climate.
Stage 5: Finishes and final inspection (3 – 4 weeks)
Flooring, kitchenette cabinets, bath fixtures, paint, and trim go in, then the final inspections and certificate of occupancy. You pick finishes in stage 1 so nothing sits waiting on a tile decision in stage 5. From there the unit is rentable or ready for family.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Options You’ll Actually Choose Between
Most of the range in a garage conversion ADU comes from a handful of decisions. Here’s the honest trade-off on each.
- Slab vs. raised floor: Keeping the existing slab is cheaper but colder and prone to moisture wicking. A raised, insulated floor adds cost but gives better comfort and a cleaner separation from the ground.
- Impact openings: Miami-Dade product approval (NOA) impact windows and doors are required here and are not optional. Full impact glazing is the safe default; a fixed window wall in the old door opening is the higher-end look.
- Mini-split vs. tied-in HVAC: A dedicated mini-split is simpler, cheaper to run for one zone, and avoids overloading an older air handler. Tying into the house system is tidier but often needs a load calculation and duct work.
- Kitchenette grade: A compact sink, two-burner cooktop, and under-counter fridge keeps the budget tight. A full galley with KraftMaid cabinetry and quartz reads as a real apartment and commands more rent.
- Wet-wall placement: Putting the bath near the house’s existing plumbing wall cuts trenching and cost. Moving it to the far corner is more flexible but adds slab work.
What a Garage Conversion ADU Costs in Westwood Lakes, FL

Plan on $45,000 – $130,000 for a permitted garage conversion ADU in Westwood Lakes. A simple studio conversion with a compact bath and kitchenette lands near the low end. A one-bedroom unit with a full kitchen, raised floor, and impact window wall runs toward the top.
Five things push the number up or down:
- Unit size and layout: A 300 sq ft studio and a 500 sq ft one-bedroom are different budgets, mostly in finishes and fixtures.
- Plumbing distance: Running a new sewer line across the slab to a far corner is a real, itemized cost. Staying near the existing stack saves money.
- Structural changes: Knocking through the shared wall to the main house, adding a door, or re-framing the old garage opening all add scope.
- Finish grade: Flooring, cabinetry, and fixtures swing the total by tens of thousands depending on what you pick.
- Permit and inspection scope: A full conversion with a separate address triggers more review than a simple interior build-out.
Your written estimate is line-item so you see the number you’ll pay, with no change-order surprises. The $1,000-off offer for projects over $10,000 applies, and 0% financing for 18 months is available. Part of a bigger plan? This pairs naturally with our Home Additions & ADU in Westwood Lakes work if the conversion is the first step of a larger project.
See the difference
Before
After
Before
After
Before
AfterWhat Westwood Lakes Homes Specifically Do to This Job
Westwood Lakes is a built-out, unincorporated pocket of Miami-Dade, which means almost no new construction – most of our garage conversion ADU work here is a rebuild of a 1960s – 70s single-story ranch. Those garages were never framed for living space: the slabs sit low, the walls lack moisture control, and the openings were sized for a door, not an impact window. Every conversion here has to clear Miami-Dade’s wind-mitigation and post-Surfside recertification reality, and impact product approval (NOA) paperwork is part of the permit package, not an afterthought. On the 33165 blocks, the most common thing we find is a garage slab that sweeps water toward the house, so re-grading and moisture detailing are built into the scope. That’s the difference between a conversion that feels like a house and one that smells like a garage in a wet July. When homeowners extend the work outside, they often pair this with Concrete Driveways & Concrete Work in Westwood Lakes or fresh Asphalt Driveways & Resurfacing in Westwood Lakes to keep the approach clean.
Serving Westwood Lakes, FL – Our Local Coverage Area
We serve Westwood Lakes and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – Garage Conversion ADU in Westwood Lakes

Most run 3 to 5 months from permit issue to final inspection. Permit review and the moisture-sensitive drywall stage are the two biggest time swings. Call (844) 834-8961 for a schedule based on your specific layout.
Yes. A garage conversion ADU in Miami-Dade County requires a building permit, inspections at each stage, and a certificate of occupancy, plus impact openings with product approval. We pull the permit and manage the inspections for you.
Often, yes. If the bath lands against the house’s existing plumbing wall and you keep the shared wall intact, the scope shrinks and the cost drops toward the low end. We’ll tell you honestly at the walkthrough whether your layout allows it.
Between $45,000 and $130,000, depending on size, plumbing distance, structural changes, and finish grade. Call (844) 834-8961 for an exact line-item quote – the estimate is free.
Every garage conversion ADU we build is covered by the 730-Day Done Right Promise. If something isn’t right, we make it right, and our technicians have up to 12 years of experience on jobs like this one.
Get a Free Estimate for Your Garage Conversion ADU in Westwood Lakes
Call (844) 834-8961 to schedule a free on-site estimate for your garage conversion ADU in Westwood Lakes. We’ll walk the garage with you, measure the slab and ceiling, flag any plumbing or permit issues upfront, and hand you a written, line-item number before you commit. Calls are answered by a live person 24/7, so no waiting until Monday.
Written by the team at Groundwork Construction Co.