A new rear addition with a vaulted beamed ceiling and tall windows
ADU Site Prep & Utilities · Westwood Lakes, FL

ADU Site Prep & Utilities in Westwood Lakes - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Kendale Lakes
A finished backyard cottage with a small covered porch
A single-story rear room addition with tall windows and a new patio
A new wood side gate with black hardware
A new concrete driveway with a paver border
A stone counter, tile backsplash and open shelf after a kitchen remodel
A remodeled hall bathroom with subway tile and a floating vanity
New architectural shingles with a clean valley
A new casement window over a kitchen sink
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

ADU Site Prep & Utilities in Westwood Lakes, FL: What It Takes and What It Costs

ADU site prep and utilities in Westwood Lakes runs $45,000 – $130,000 and covers everything before the structure goes up: clearing and grading the lot, running electrical, water, sewer and gas, pouring the foundation, and passing Miami-Dade’s wind-load inspections. Most projects we handle here take 6 – 10 weeks from the first day of site work to a foundation that’s ready for framing. Call (844) 834-8961 for a free on-site estimate.

Call (844) 834-8961

Key takeaways

  • Site prep and utilities alone run $45,000 – $130,000 in Westwood Lakes, separate from the prefab or stick-built structure.
  • Miami-Dade’s post-Surfside inspection regime means underground utility work gets inspected before anything is buried.
  • The 1960s – 70s ranch lots common here often need new lateral sewer runs, not just hookups.
  • Timeline is 6 – 10 weeks, longer if a new sewer tap is required.
  • Every job comes with the 730-Day Done Right Promise.

How we run ADU site prep and utilities, stage by stage

A remodeled family room with new windows and a window seat

This is the part most homeowners underestimate. The structure gets all the attention, but the ground work decides whether the project stays on schedule. Here’s how it actually unfolds in Westwood Lakes.

Stage 1: Site survey and utility locate (days 1 – 2)

We start by calling 811 for the underground utility locate and walking the lot with you. In Westwood Lakes, most ADU lots are 60 – 70 feet wide with an existing home already taking up the front half, so the first real decision is where the ADU footprint goes relative to setbacks, the septic or sewer lateral, and your existing electrical meter. You’ll need to confirm the placement with us before we mark anything.

Stage 2: Clearing, grading and drainage (days 3 – 7)

We remove vegetation, strip topsoil, and grade the site to drain away from both the ADU and the main house. South Florida’s flat lots and high water table mean we’re often building up the pad by 12 – 18 inches of compacted fill, not just scraping the surface. You’ll decide on the finished floor elevation relative to your main home – this matters for how the ADU connects visually and how water moves during hurricane season.

Stage 3: Underground rough-in for utilities (days 7 – 21)

This is the meat of the work. Electrical conduit, water supply lines, sewer or septic lines, and gas all go in the ground before the slab. In Westwood Lakes, we frequently need to tie into the existing sewer lateral at the street rather than the house, which means a longer trench and a separate county inspection. Every foot gets inspected before backfill – that’s a Miami-Dade requirement, not our preference.

Stage 4: Foundation and slab (days 21 – 42)

Footings, stem walls, and the slab go in over roughly three weeks. The concrete needs to cure before framing, and we build in a buffer because summer rain in Westwood Lakes can delay a pour by days. You’ll choose the foundation type here – monolithic slab for most ADUs, or a raised stem wall if the site grades that way.

Stage 5: Final utility inspection and handoff to framing (days 42 – 70)

The county inspects the underground work, we backfill and compact, and the site is handed to the framing crew. Total: 6 – 10 weeks from stage 1 to framing start. If a new sewer tap is required, add 2 – 3 weeks for county scheduling. That’s the piece homeowners forget to plan for.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The site and utility options you’ll choose between

Most of the decisions here are made in the first two weeks, and each one moves the price:

  • Foundation type – a monolithic slab is the standard for Westwood Lakes ADUs and the cheaper option. A raised stem-wall foundation costs 15 – 20% more but handles drainage better on low lots.
  • Sewer tie-in vs. septic – tying into the county sewer line is standard where available. If your lot isn’t on sewer, a new septic system for an ADU adds significant cost and a separate permitting track. We’ll confirm which you’re on before quoting.
  • Electrical service – a dedicated 100-amp or 200-amp service for the ADU, or a subpanel off the main house. The subpanel saves money but limits what the ADU can run simultaneously.
  • Stormwater and drainage – a simple graded swale is fine on most lots. A French drain or dry well adds cost but prevents the standing water that plagues flat Westwood Lakes lots after heavy rain.
  • Utility trenching depth – Miami-Dade’s frost line is a non-issue, but depth requirements for sewer laterals still apply and deeper trenches cost more in excavation and backfill.

What ADU site prep and utilities costs in Westwood Lakes, FL

A framer checking new wall framing on a home addition

Site prep and utilities for an ADU in Westwood Lakes runs $45,000 – $130,000. That’s the ground work only – the ADU structure itself is separate, and the full project scope lives on our Home Additions & ADU in Westwood Lakes page. Here’s a line-item view of what drives the number:

  • Clearing, grading and fill: $4,000 – $12,000
  • Electrical service and conduit: $6,000 – $18,000
  • Water and sewer lateral: $8,000 – $25,000 (new sewer tap pushes the high end)
  • Septic system, if required: $15,000 – $30,000
  • Foundation and slab: $12,000 – $35,000
  • Drainage and stormwater: $2,000 – $8,000
  • Permits and inspections: $2,500 – $8,000

Five variables push a job toward the high end: a new sewer tap instead of a tie-in to the existing lateral, a low lot requiring fill and drainage work, a septic system instead of sewer, a 200-amp dedicated service, and any need to relocate the existing home’s utilities. What’s included in a written estimate: all excavation, all materials, all permits, all inspections, and site cleanup. What typically isn’t: the ADU structure itself, landscaping after backfill, and any work tied to the main house. We quote upfront, in writing, and the number you see is the number you pay.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Westwood Lakes homes specifically do to this job

Westwood Lakes is a built-out, unincorporated pocket of Miami-Dade, ZIP 33165, where nearly every ADU project is grafted onto a 1960s – 70s single-story concrete-block ranch. There’s no new development here – we’re working around existing homes on lots that already hold a house, a driveway, and decades-old utility lines. That changes the job in specific ways.

First, the existing sewer laterals on most Westwood Lakes homes are original cast iron or orangeburg pipe from the 1960s and 70s. We almost always recommend a camera inspection before tying an ADU into that line, because a failing lateral will surface the moment the ADU adds load. Second, the entire project has to clear Miami-Dade County’s post-Surfside inspection regime – 40-year recertification, wind-mitigation requirements, and product-approval (NOA) paperwork for anything structural. Contractors who don’t know the NOA process end up with inspections that bounce back. Third, hurricane season shapes every decision: drainage has to handle a tropical downpour, and every structural element we pour is engineered for the county’s wind-load requirements. After a named storm, insurance-driven repair work floods the local permitting pipeline, so scheduling a new ADU project in the weeks after a storm takes patience. We work all of Westwood Lakes and the surrounding Westwood Lakes area, so we know the lots and the inspection quirks.

Many homeowners pair the ADU site prep with a new Concrete Driveways & Concrete Work in Westwood Lakes job for the access path, or a Paver Driveways in Westwood Lakes upgrade to match the new structure’s finish. Both make sense to plan alongside the site work rather than after.

Serving Westwood Lakes, FL – Our Local Coverage Area

We serve Westwood Lakes and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently asked: ADU site prep and utilities in Westwood Lakes

New painted shaker cabinets with an organized deep drawer

Get a free ADU site prep and utilities estimate in Westwood Lakes

Call (844) 834-8961 and a live person answers, day or night. We’ll schedule a free on-site estimate, walk your lot, camera-inspect the existing utilities where it matters, and hand you a written line-item quote with the permit scope spelled out. Every job is backed by our 730-Day Done Right Promise, and our technicians have up to 12 years of experience. When you’re ready to plan the wider project, our Home Additions & ADU service covers the full scope. Upfront pricing, no surprises.

Written by the team at Groundwork Construction Co.

Why Westwood Lakes Chooses Groundwork Construction Co. of Kendale Lakes

We set the standard for ADU site prep & utilities in Westwood Lakes.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Westwood Lakes

Getting your ADU site prep & utilities project started is simple.

1

Call or Request a Free Estimate

Tell us about your ADU site prep & utilities project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local ADU site prep & utilities pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Westwood Lakes Customers Say

Trusted by homeowners across Westwood Lakes and surrounding areas.

★★★★★

"He pulled the permits himself, scheduled every sub and ran the inspections. I made one decision a week and otherwise stayed out of it, which is exactly what I was paying for."

Robert Sullivan
★★★★★

"Found unpermitted work by the previous owner once he opened the wall. He stopped, explained the options and what each would cost, and let me decide rather than making it my emergency."

Marco Castillo
★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A remodeled hall bathroom with patterned floor tile and painted wallsA remodeled kitchen with a waterfall island and wood cabinetsA wood double vanity with two mirrors after a bathroom remodelA new roof with clean valleys and new flashingA new multi-panel patio door opening a kitchen to the patioA new stained cedar privacy fence

More services in Westwood Lakes

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Kendale Lakes

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Kendale Lakes team

A local vetted partner works across Kendale Lakes and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for ADU Site Prep & Utilities in Westwood Lakes?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Westwood Lakes.

(844) 834-8961

Request a Free Estimate in Westwood Lakes

Tell us about your ADU site prep & utilities needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Us