







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Cabinets & Countertops in Westchester, FL: What to Expect
Cabinets & countertops in Westchester typically run $14,000 – $45,000 for a full kitchen tear-out and rebuild, and most jobs take three to five weeks from demo day to final walkthrough. That range covers semi-custom or custom cabinetry, stone or quartz tops, and the plumbing and electrical work that always seems to surface once the old boxes come out. Call (844) 834-8961 and we’ll walk you through where your specific number lands.
The Process, Start to Finish

The order of operations matters more than anything else in a cabinet and countertop job. Get it out of sequence and you’re paying for a second visit from the countertop fabricator. Here’s how we run it.
Stage 1: On-site measure (day 1)
We come out, field-measure the footprint, and check what’s actually behind the old cabinets – pull the base boxes, look at the wall, confirm where the water and gas lines run. On Westchester’s older block homes, we often find a corner that’s out of square by an inch or two. A laser measure catches that before the cabinet order goes in, not after the boxes arrive. You decide the general budget and layout direction on this visit.
Stage 2: Final selections and order (days 2 – 10)
You settle on door style, finish, drawer hardware, and countertop material. If you’re going with KraftMaid, lead times can run four to six weeks on special finishes. This is where you make the biggest budget call: box-grade cabinets versus semi-custom versus full custom, and laminate versus quartz versus natural stone. We lock the countertop template date against the cabinet delivery date so nothing sits waiting.
Stage 3: Demolition and rough prep (days 11 – 13)
We pull the old cabinets, tops, backsplash, and any appliance that’s coming out. The wall gets patched and brought flat before new boxes go up. If plumbing or electrical is getting relocated, that happens now, and in Westchester it’s where a permit inspection comes into play. You decide appliance delivery timing, because the new range has to be in place before the countertop goes down.
Stage 4: Cabinet install and countertop template (days 14 – 17)
New cabinets go in, leveled, shimmed, and secured to the wall. Hardware goes on. The countertop fabricator comes out to template against the actual installed boxes – not against the drawing. Fabrication takes about a week, and that gap is built into the schedule, not a delay.
Stage 5: Countertop set, final trim, walkthrough (days 18 – 25)
The tops get set, seams glued and polished, sink and faucet connected, dishwasher and disposal tied in. We clean up and do a walkthrough with you – every drawer, every door, every seam. Any punch item goes on a written list. The job isn’t closed until that list is empty.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Options You’ll Choose Between
Most of the real money decisions happen in two places: the cabinet box and the countertop surface. Here’s what actually separates one from the other.
- Semi-custom cabinet boxes (KraftMaid and similar): the sweet spot for most Westchester kitchens. Wider door styles, plywood box options, and finish colors that hold up to humidity better than the entry-level particleboard boxes. Adds roughly 15 – 25% over stock but lasts noticeably longer in a South Florida climate.
- Quartz countertops: non-porous, no sealing, holds up to Florida humidity without staining. Runs toward the top of the countertop range ($2,000 – $6,500 installed), but it’s the choice most homeowners land on here.
- Granite: natural stone, every slab different, needs re-sealing roughly once a year. Slightly less expensive than quartz on average, and it handles heat better around the range.
- Laminate: the budget option, and it’s come a long way. It won’t handle a hot pan or a knife edge, and it’s the first surface to fail in a rental or turnover property.
- Solid surface (Corian-type): seamless, repairable, mid-range cost. Works well in bathrooms, less so in a kitchen with heavy daily use.
- Hardware and organizers: soft-close hinges, drawer dividers, pull-out trash and spice racks add $400 – $1,200 total but change how the kitchen works day to day. Easy to skip and easy to regret.
What Cabinets & Countertops Cost in Westchester, FL

A full cabinet and countertop replacement in Westchester lands between $14,000 and $45,000, with most jobs coming in around $22,000 – $30,000. Here’s what moves the number:
- Footprint size: a galley runs $14,000 – $20,000; a U-shaped kitchen with an island pushes past $35,000. Cabinet installation alone is $4,000 – $13,000, countertop installation $2,000 – $6,500.
- Box grade: stock versus semi-custom versus full custom spans roughly a 2x swing on the cabinet line item.
- Plumbing and electrical relocation: moving a sink or adding a dedicated circuit for a new range adds $1,500 – $4,000 and can trigger a permit.
- Countertop material: laminate at the bottom, quartz and granite at the top, a $4,000 spread on a typical job.
- Permit scope: if you pull a permit for the plumbing or electrical changes (you should), add $300 – $800 and two inspection visits.
Every written estimate breaks these out line by line. What’s typically not included: appliance cost, backsplash tile (that’s a separate scope and gets its own line), and any wall or soffit removal that turns into a structural question. We tell you which of those apply before you sign anything.
See the difference
Before
After
Before
After
Before
AfterWhat Westchester Homes Specifically Do to This Job
Westchester (ZIP 33165) is a fully built-out pocket of unincorporated Miami-Dade, and the housing stock is overwhelmingly 1950s to 1970s single-story concrete block with stucco on the outside. That matters here because there’s almost no new construction to compare against – practically every kitchen we work on has already been remodeled once, often in the 1980s or 90s. We routinely find the previous owner cut a cabinet down to fit an existing opening rather than moving the wall, or ran a supply line through the back of a base cabinet to avoid a permit. Once the old boxes come out, that shows up.
The other thing that affects scheduling is Miami-Dade’s High-Velocity Hurricane Zone permitting. Cabinet and countertop replacements without plumbing or electrical relocation generally don’t require a permit, but the moment you move a sink, run a new circuit, or take down a non-load-bearing partition, you’re in code-upgrade territory. We pull the permits, schedule the inspections, and don’t hand off a half-finished job waiting on a paper trail. If you’re also converting a carport or expanding the footprint, our Garage Conversion ADU in Westchester and New Detached ADU in Westchester pages cover how the same permitting process plays out on a bigger build.
We cover all of Westchester, including the blocks off Coral Way and the homes near the Bird Road corridor, and we work this scope as part of a Kitchen Remodeling in Westchester project when a homeowner is replacing everything at once. If you want to see how our Kitchen Remodeling service handles the broader scope, that’s the place to start.
Serving Westchester, FL – Our Local Coverage Area
We serve Westchester and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – Cabinets & Countertops in Westchester

Most jobs run three to five weeks from demo to walkthrough. Cabinet lead time is the biggest variable – stock boxes arrive in about a week, semi-custom KraftMaid orders in four to six weeks. Call (844) 834-8961 for a realistic timeline once we’ve measured your kitchen.
No permit is typically needed for a straight cabinet and countertop swap. You do need one if plumbing or electrical gets relocated during the job, which happens on roughly half the kitchens we open up. We handle the permit and the inspection scheduling as part of the job.
The full range runs $14,000 – $45,000, with the median job around $22,000 – $30,000. Cabinet installation is $4,000 – $13,000 and countertop installation is $2,000 – $6,500 of that total. Call (844) 834-8961 for an exact number – estimates are free.
Yes, and it’s the most common way we do it. Keeping the sink where it is and leaving walls alone eliminates the permit question and shortens the job by a week. If you want to reconfigure, we’ll tell you upfront what the extra plumbing and electrical work costs.
Every project we install is covered by our 730-Day Done Right Promise – if it’s not done right, we make it right. That covers the installation workmanship on top of any manufacturer warranty on the cabinets or countertops themselves. Call (844) 834-8961 to schedule your free estimate and design consult.
Get a Free Estimate on Cabinets & Countertops in Westchester
We come out, measure, look behind the existing cabinets, and hand you a written, line-item estimate for cabinets and countertops in Westchester – no pressure, no vague numbers. Calls are answered by a live person 24/7, and our technicians are background-checked and arrive in uniform. Call (844) 834-8961 to schedule your free estimate and design consult. We’ll bring samples.
Written by the team at Groundwork Construction Co.












