A Groundwork company - serving Kendale Lakes, FL
A new rear addition with a vaulted beamed ceiling and tall windows
Garage Conversion ADU · Richmond Heights, FL

Garage Conversion ADU in Richmond Heights - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Kendale Lakes
A remodeled family room with new windows and a window seat
A garage converted into a guest room and home office
New painted shaker cabinets with an organized deep drawer
A remodeled hall bathroom with patterned floor tile and painted walls
A remodeled kitchen with a waterfall island and wood cabinets
A wood double vanity with two mirrors after a bathroom remodel
A new roof with clean valleys and new flashing
A new multi-panel patio door opening a kitchen to the patio
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Garage Conversion ADU in Richmond Heights, FL: What It Takes and What It Costs

A garage conversion ADU in Richmond Heights typically runs $45,000 – $130,000 and takes 3 to 5 months from permit to final inspection. You’re turning an existing attached or detached garage into a legal, rentable or family-ready living unit – full bath, kitchenette, sleeping area, separate entrance – usually on a lot that’s already built out. Call (844) 834-8961 to schedule a free on-site estimate and we’ll walk your garage with you.

Call (844) 834-8961

How the Work Actually Unfolds, Stage by Stage

A single-story rear room addition with tall windows and a new patio

Every Richmond Heights garage conversion we run follows the same sequence. Here’s the honest version, including the parts that slow a job down.

Stage 1: Feasibility and layout (week 1)

We measure the garage, check the slab, and look at where the electrical panel, water heater, and any existing plumbing run. In a 1950s – 70s Richmond Heights home this is the moment we find out whether the garage slab is a monolithic pour or a floating slab – the difference changes your floor assembly. You decide the layout at the end of this stage: where the sleeping area sits, where the kitchenette goes, and whether the unit gets its own exterior door or shares the existing side entrance.

Stage 2: Permit submission and plan review (weeks 1 – 4)

We prepare the drawings and submit to Miami-Dade County. Because Richmond Heights sits inside the High Velocity Hurricane Zone, the plans have to show Miami-Dade NOA-approved products for the doors, windows, and any new roof structure, and the county runs a threshold-inspection sequence on top of the standard inspections. This review period is the single longest thing you don’t control. You’ll sign the permit application and any HOA paperwork during this window.

Stage 3: Demo and shell prep (weeks 4 – 5)

The garage door comes out and gets framed and finished as a wall. We strip drywall, remove the old overhead door track and opener, and cut the slab where plumbing has to go if the unit needs a bath relocated from the existing stack. This is a 5 to 7 day stage on a typical single-car or two-car Richmond Heights garage. You choose the new exterior door configuration before framing closes.

Stage 4: Rough-in trades (weeks 5 – 8)

Plumbing, electrical, and HVAC rough-in happen in sequence, then the county inspects all three before anything gets closed up. This stage is where sliding the bath against an existing wall stack versus running new drain lines across the slab swings your price the most. You’ll pick fixtures – vanity, shower or tub, toilet, water heater type – right before rough-in so the plumbing can be set to fit.

Stage 5: Insulation, drywall, finishes, final inspection (weeks 8 – 16)

Insulation and drywall go up, then floor, cabinets, countertop, paint, trim, and fixtures. Final inspection comes after the punch list is clear. You walk the finished unit with us before we sign off.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Choices That Shape Your Garage Conversion ADU

These are the decisions that move a Richmond Heights garage conversion from a $45,000 box to a $130,000 finished unit. Each one has an honest trade-off.

  • Detached versus attached garage. An attached garage shares two or three walls with the house, so you save on exterior sheathing, roofing, and HVAC routing. A detached garage in Richmond Heights has to be tied to the house utilities with trenched lines, which adds cost but gives the ADU its own privacy and separate utilities if you want them.
  • Bath and kitchenette plumbing location. Tying the new bath to the existing drain stack is the cheap route. Running a new stack across the slab means breaking concrete, re-pouring, and a longer permit review. That swing alone is often $8,000 – $20,000.
  • Exterior door and window package. In the HVHZ, doors and windows must carry a Miami-Dade NOA. Impact-rated glass costs meaningfully more than standard but eliminates shutters and passes the county’s product-approval check on the first review. Barrette and Master Halco make fencing and gate systems homeowners often pair with an ADU side entrance, and the same hurricane-rated thinking applies to the gate hardware.
  • Flooring. Engineered luxury vinyl plank ships fast, handles South Florida humidity, and stays in budget. Tile is more durable in a wet unit and matches the existing terrazzo or tile found in many Richmond Heights homes. Site-finished hardwood is a poor fit in a garage slab that may wick moisture.
  • HVAC. A dedicated ductless mini-split is the cheapest path and gives the tenant their own thermostat. Tying into the house system with a new zone can be cheaper on equipment but adds labor and complicates the permit.
  • Kitchenette grade. A compact sink, two-burner cooktop, and undercounter fridge is sufficient for a legal ADU. A full kitchen with a range hood, 220V circuit, and dishwasher pushes cost higher and needs additional electrical capacity.

What a Garage Conversion ADU Costs in Richmond Heights, FL

A framer checking new wall framing on a home addition

Expect $45,000 – $130,000 for a garage conversion ADU in Richmond Heights. Most jobs we quote land in the $60,000 – $95,000 band, and the variables below explain why some jobs run to either end.

Scope element Typical range
Attached garage, plumbing on existing stack, mid-grade finishes $45,000 – $70,000
Attached garage, new bath stack, full kitchenette, dedicated HVAC $70,000 – $100,000
Detached garage, trenched utilities, impact door package, premium finishes $95,000 – $130,000
Permit, plan review, and impact-fee portion Included in written quote

Five things push the number to the high end: whether the garage is detached (trenching and separate utilities), how far the new bathroom plumbing runs from the existing stack, whether the electrical panel has capacity for the additional loads or needs an upgrade, the impact-rated door and window package Miami-Dade requires, and finish grade (cabinets, countertops, flooring). Structural changes – cutting a beam, reinforcing the roof for a flat-ceiling conversion – add cost on top of all of it. A written estimate from us lists each of these line by line, not as one bundled number. Call (844) 834-8961 for an exact quote on your specific garage – estimates are free.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Richmond Heights Homes Specifically Do to This Job

Richmond Heights was built out between the 1950s and 1970s, and much of that housing is single-family CBS – concrete block and stucco – with carports and oversized garages. Because the area is essentially full, almost no garage here is being converted in a new build; we’re renovating garages that have been standing for 50 to 70 years. That means two failure modes show up on nearly every job. First, the carport that was walled in at some point in the 1980s often has no footing under the new walls and no permit on file, and we have to bring that up to code for the ADU to pass final inspection. Second, the original garage slab may sit below the finish-floor elevation of the house, which means the new unit floor needs a raised assembly – a detail we price in upfront, not after demo.

The county permitting reality is where Richmond Heights garage conversions get their timeline from. Miami-Dade’s High Velocity Hurricane Zone rules mean every exterior door, window, and any new tie-down or strap assembly must use Miami-Dade NOA-approved products and pass the county’s threshold-inspection sequence. That rigor is a good thing – it’s why a permitted conversion adds real value – but it does mean plan review usually runs several weeks before a hammer swings. We handle the permit, the NOA product schedules, and every inspection along the way. If your project grows into a broader build, see our Home Additions & ADU in Richmond Heights work, and homeowners converting a detached garage often pair the ADU access with Asphalt Driveways & Resurfacing in Richmond Heights for the new parking and path to the door. Every job is covered by our Home Additions & ADU service and by the 730-Day Done Right Promise. We cover Richmond Heights and the surrounding South Miami-Dade neighborhoods including Kendall, Sunset, The Crossings, and Three Lakes.

Serving Richmond Heights, FL – Our Local Coverage Area

We serve Richmond Heights and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked: Garage Conversion ADU in Richmond Heights

A remodeled hall bathroom with subway tile and a floating vanity

Get Your Free Garage Conversion ADU Estimate in Richmond Heights

We’ll come out, walk the garage, measure the slab, and check the panel and plumbing stack – then hand you a written estimate with line items, not a single round number. Our licensed and insured team answers the phone 24/7 with a live person, and our technicians bring up to 12 years of experience to every job. Call (844) 834-8961 to schedule your free estimate. Concrete Driveways & Concrete Work in Richmond Heights is a natural companion if your conversion adds a parking pad.

Written by the team at Groundwork Construction Co.

Why Richmond Heights Chooses Groundwork Construction Co. of Kendale Lakes

We set the standard for garage conversion ADU in Richmond Heights.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Richmond Heights

Getting your garage conversion ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your garage conversion ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local garage conversion ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Richmond Heights Customers Say

Trusted by homeowners across Richmond Heights and surrounding areas.

★★★★★

"He pulled the permits himself, scheduled every sub and ran the inspections. I made one decision a week and otherwise stayed out of it, which is exactly what I was paying for."

Robert Sullivan
★★★★★

"Found unpermitted work by the previous owner once he opened the wall. He stopped, explained the options and what each would cost, and let me decide rather than making it my emergency."

Marco Castillo
★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A new concrete driveway with a paver borderA stone counter, tile backsplash and open shelf after a kitchen remodelNew architectural shingles with a clean valleyNew double-hung windows in a dining roomA new front yard fence with a matching gateA new paver pool deck

More services in Richmond Heights

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Kendale Lakes

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Kendale Lakes team

A local vetted partner works across Kendale Lakes and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for Garage Conversion ADU in Richmond Heights?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Richmond Heights.

(844) 834-8961

Request a Free Estimate in Richmond Heights

Tell us about your garage conversion ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Us
Local Service Coverage
Call Now - 24/7 Dispatch