How Long Does Windows & Doors Take? Timelines and What to Expect

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Kendale Lakes

Last updated November 17, 2026

A new front entry door with glass sidelights
A new bay window with a cushioned seat
An open kitchen and dining area after a remodel
A freestanding soaking tub in a remodeled primary bathroom
A second-story addition that matches the existing roofline
A newly finished roof with a ridge vent and step flashing
A new black aluminum pool fence with a gate
A new curved paver walkway to the front porch
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

How Long Does Windows & Doors Take? Timelines and What to Expect

The window you fall for in a showroom during week one might not reach your contractor for 8 to 12 weeks. That’s not a contractor dragging their feet. It’s the standard manufacturing lead time for Miami-Dade approved impact products, and a good contractor should have told you that on day one. Most window and door quotes count installation and stop there, leaving out permitting, product manufacturing, and the inspection that legally closes your permit. In this guide we map every stage of a windows and doors project, from the first showroom visit to the final inspection, with real timelines, so you know exactly what’s happening and when. We’ll focus on how these timelines play out in Kendale Lakes, where code and climate both shape the schedule.

Call (844) 834-8961

Quick Answer

A typical windows and doors replacement in Kendale Lakes runs 10 to 16 weeks from signed contract to final inspection. Installation itself is only 1 to 2 days per unit. The rest of the time goes to product selection, Miami-Dade permitting, impact product manufacturing lead times, and inspection scheduling. If everything moves cleanly, a small job can finish closer to 8 weeks; a full-house order with custom sizes and specialty doors often stretches past 16.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

Table of Contents

The Full Timeline at a Glance

Here’s the honest stage-by-stage picture for a windows and doors replacement in Kendale Lakes. Every stage runs sequentially, so a delay in one ripples into the next.

  1. Product selection and contract signing: 1 to 2 weeks.
  2. Permit application and processing: 2 to 6 weeks, sometimes longer during busy seasons.
  3. Product manufacturing and delivery: 8 to 12 weeks for Miami-Dade approved impact products (custom sizes can push past 14).
  4. Installation: 1 to 2 days per unit, so a full-house job of 12 to 15 openings typically takes 5 to 10 working days.
  5. Inspection and permit closeout: 1 to 3 weeks from the day the job is finished.

Notice what’s doing the heavy lifting: manufacturing and permitting, not installation. Homeowners almost always underestimate stages 2 and 3, and that’s where timelines get blown. A good rule of thumb for planning: assume a full project timeline of 10 to 16 weeks, and if your schedule has zero slack, plan for 18 to be safe. We’ve watched plenty of homeowners pencil in a window job for a holiday only to find the product hasn’t left the factory yet. The earlier you lock in the order, the more realistic your date becomes.

Stage 1: Product Selection and Ordering

Before a single window gets ordered, you need to decide exactly what’s going in the opening. That sounds simple, but it’s the stage where a lot of projects stall. Choosing between brands like Andersen and Marvin is one decision; deciding the size, sill height, hardware finish, glass package, and orientation for each individual opening is another. For a full-house order, that decision matrix can take a couple of weeks, especially when you’re factoring in the impact rating each opening requires.

Here’s what usually needs to be locked down before a contractor can place an order:

  • Final sizes for every window and door (measured on site, not from catalog)
  • Impact rating for each opening (most openings in Kendale Lakes fall in Miami-Dade’s High Velocity Hurricane Zone)
  • Glass package (low-E, laminated, tinted, or standard impact laminate)
  • Frame material and color (vinyl, aluminum, fiberglass, or wood-clad)
  • Hardware and screen options
  • Whether any frames will be retrofitted into existing openings or fully replaced with new construction frames

Fully replacing frames versus retrofitting impacts both the permit scope and the installation timeline. In our experience in Kendale Lakes, homes built in the 1970s and 1980s often have original openings that need new construction frames rather than retrofit inserts, and that changes the project cost and the schedule in equal measure. Spend the time here. A rushed selection at this stage usually means a change order that adds 3 to 4 weeks downstream.

Stage 2: Miami-Dade Permitting in Kendale Lakes

Every window and door replacement in Miami-Dade County requires a permit. There’s no shortcut here, and any contractor who tells you otherwise is cutting a corner you don’t want cut. In Kendale Lakes, permits run through Miami-Dade County’s Department of Regulatory and Economic Resources (RER), and the processing time depends heavily on the completeness of the application and whether the product has current Florida Product Approval or Miami-Dade Notice of Acceptance (NOA) documentation.

Here’s what a clean permit package typically looks like:

  1. Signed and sealed approval drawings from a licensed engineer or architect for each opening
  2. Product approval documentation (NOA or Florida Product Approval number) for every product specified
  3. Signed and dated contract with the itemized scope and product specifications
  4. Notice of Commencement filed with the county
  5. Current contractor licensing and insurance documents
  6. Any required homeowner association or subdivision paperwork (some Kendale Lakes communities have architectural review requirements)

If the package is complete on submission, the county’s typical turnaround for standard residential window and door permits is 2 to 4 weeks. If anything is missing or misaligned, plan on 5 to 6 weeks or more while corrections cycle back and forth. In our experience in Kendale Lakes, the biggest source of delay is a product spec that doesn’t match the NOA. A single opening with a mismatched approval document restarts the clock. Complete packages are the fastest route.

If your project overlaps with other structural or exterior changes, it can be worth having those scoped together. A window replacement that also reshapes an exterior wall, or a door install that ties into a new addition, needs to be permitted as one project. That’s why we often recommend reviewing your broader plans alongside a project like a Home Additions & ADU in Kendale Lakes, so you aren’t filing two permits back to back.

Stage 3: Impact Product Lead Times

Here’s the stage that trips up the most homeowners. Standard windows nationwide ship in 4 to 6 weeks. Miami-Dade approved impact products are not standard. The testing, factory certification, and production scheduling for impact-rated assemblies make 8 to 12 weeks the norm, and custom sizes, unusual colors, or specialty doors like sliders and French doors often push past 14. This is not a delay. It’s the honest manufacturing schedule, and any contractor quoting you a faster date should show you how.

Why the extra time?

  • Testing and certification: Every product line must carry current Miami-Dade NOA. When a manufacturer updates a line, lead times reset.
  • Factory scheduling: Impact products are produced in batches; a non-standard size may wait for the schedule to catch up.
  • Shipping logistics: Manufacturing plants are mostly out of state; production plus transit adds 1 to 2 weeks on top of the factory cycle.
  • Oversize items: Sliders, French doors, and folding doors ship on dedicated freight and often require coordination that smaller windows don’t.

One thing to know: lead time starts when the order is confirmed with a signed contract and deposit, not when the permit is approved. Many contractors time both in parallel, which is legal in Miami-Dade as long as the product isn’t installed before the permit is issued. In our experience in Kendale Lakes, ordering the product simultaneously with the permit is one of the biggest timeline saves available, cutting 2 to 4 weeks off the total job when it’s done correctly.

If you have exterior work happening around the same property, timing a Driveway & Pavers in Kendale Lakes installation alongside or just after the window job is common, since installation trucks and equipment are already scheduled.

Stage 4: What Happens on Installation Day

Homeowners are often surprised by how fast installation actually is. A typical window replacement takes between 1 and 2 days per unit for a standard-sized impact window, and most contractors will install 2 to 4 windows per day depending on the opening size and the type of frame installation. A 12-opening house usually runs 5 to 10 working days. A single sliding door can take a full day on its own because of the frame removal, shimming, flashing, and hardware work involved.

Here’s what’s actually happening during an installation day:

  1. Protect interior floors and furniture near the work area.
  2. Remove the existing window or door and inspect the rough opening for hidden water damage or rot.
  3. Repair any framing issues uncovered (this is the number one way installation timelines grow).
  4. Set the new unit in place, level, plumb, and shim it correctly.
  5. Apply flashing at the head, jambs, and sill to prevent water intrusion (critical in South Florida).
  6. Seal with exterior-grade caulk and interior trim (depending on the finish scope).
  7. Install hardware, closures, and screens.
  8. Test operation and lock function, then clean up.

In our experience in Kendale Lakes, the biggest hidden variable on installation day is rough opening condition. Homes that have seen 40 years of hurricane-season humidity often have frame rot or water intrusion that doesn’t show until the old unit is out. That’s not a delay; it’s honesty. A contractor who doesn’t plan for that contingency usually rushes to close the opening and patches the problem rather than fixing it. Ask upfront how they handle found damage, and get the answer in writing.

If you’re also planning exterior hardscaping or fencing, timing a Fence Installation in Kendale Lakes after the windows are in avoids damaged new fencing during install.

Stage 5: The Post-Installation Inspection

Here’s the step most homeowners don’t know exists: the final inspection. You cannot legally close a Miami-Dade window and door permit without passing an inspection. It’s the last stage of the project and often gets left off the timeline because nobody mentions it during the sales process.

What the inspector checks:

  • Product matches the approved permit documentation (NOA or Florida Product Approval on each installed unit)
  • Proper flashing and weather sealing at every opening
  • Correct anchorage and fastening to the framing
  • Code-compliant egress on sleeping room windows
  • Correct operation of hardware and locks
  • Interior and exterior finishing consistent with the approved scope

Scheduling an inspection in Miami-Dade typically adds 1 to 3 weeks from the day you request it, sometimes shorter during slower seasons. If the inspection fails for any reason, add another 1 to 2 weeks for correction and re-inspection. A small percentage of first inspections miss on something minor, like a missing label or a screen requirement. In our experience, the contractors who schedule the inspection the day installation is complete consistently get the fastest closeout. If your contractor hasn’t discussed inspection with you before installation begins, that’s a red flag.

The finalized inspection is what legally closes out your permit, protects your property value at resale, and gives you a documented record of code-compliant work. Don’t skip it, and don’t let your contractor skip it. Every permit in Kendale Lakes needs to be closed cleanly, whether the scope also included a roof or a smaller exterior job.

What Slows a Project Down (and What Speeds It Up)

Real timelines drift. Here’s what actually causes drift in Kendale Lakes, and what our team routinely sees accelerate the process.

What slows a project down

  • Incomplete permit package: A missing NOA document easily costs 2 to 3 extra weeks.
  • Change orders after order placement: Changing a window size or color after manufacturing begins restarts the factory clock.
  • HOA architectural review: Some Kendale Lakes communities require pre-approval, which adds 1 to 3 weeks before you even file.
  • Hidden water damage or framing rot: Installation stops while the rough opening is repaired.
  • Manufacturer backlogs: Some product lines fall behind during peak hurricane-season demand; factor that in if you order in spring or summer.
  • Inspection scheduling gaps: Waiting to schedule the inspection because installation paperwork wasn’t ready.

What speeds a project up

  • Ordering product in parallel with permitting, not after.
  • Choosing in-stock or standard sizes over custom whenever possible.
  • Using current-NOA product lines, so the permit submission is clean the first time.
  • Submitting the permit package complete on day one, with HOA approvals in hand.
  • Scheduling the final inspection the day installation wraps.
  • Working with a contractor who has current relationships with the RER permit desk, so corrections are answered fast.

Many of the elements above come down to process discipline. See our Groundwork Construction Co. of Kendale Lakes home for how we structure project management, or talk to us directly about your specific openings. We don’t quote a timeline we can’t explain.

How to Plan Around the Timeline

Once you understand the stages, planning becomes straightforward. Here’s the approach we recommend to any Kendale Lakes homeowner preparing a windows and doors project.

  1. Start 4 to 6 months before your target completion date. That gives room for every stage without rushing decisions.
  2. Lock product selection early. Walk the showroom, get spec sheets, and verify the NOA for each product line before signing.
  3. Ask for the timeline as a Gantt chart, not a single number. A realistic quote should show each stage with its expected duration.
  4. Have HOA approvals in hand before permitting begins. This is one of the most overlooked stages.
  5. Budget for contingency on found damage. Assume 5 to 10 percent above contract, held in reserve, not assumed spent.
  6. Keep the entire property schedule in mind. If window installs and other exterior work are both happening, sequence them.
  7. Expect the final inspection and permit closeout. Don’t sign off on the project until the permit is officially closed.

Windows and doors are also the point where homeowners start thinking about the whole envelope. If the project sparks other exterior work, that’s a natural moment to plan a larger scope. Roof replacement, windows, and doors share permit timelines and often share the same hurricane-hardening logic. Brands like GAF and CertainTeed offer impact-rated systems that pair well with a window and door package.

Common Mistakes to Avoid

  • Assuming the quote includes permitting. Some bids exclude permit costs and timelines, then add them later. Confirm the permit and inspection are both in scope and in price.
  • Choosing product based on showroom look alone. A beautiful window without a current Miami-Dade NOA can’t be legally installed here. Verify before you commit.
  • Ordering product after the permit is issued. This adds 8 to 12 weeks to your timeline without any benefit. Ordering in parallel is the standard approach.
  • Ignoring HOA requirements. Several Kendale Lakes communities have their own architectural rules around exterior color, style, and visible frame lines. Missing this step delays permitting by weeks.
  • Not budgeting for hidden water damage. Florida homes are exposed to year-round humidity; assume 5 to 10 percent of the project may uncover rot or intrusion and plan for it.
  • Closing the project before the final inspection passes. A closed permit protects resale value and code compliance. Skipping it leaves a legal cloud on your property.
  • Trusting a fast timeline over a realistic one. If the quoted timeline is 4 to 6 weeks end to end and includes impact product, permitting, and inspection, ask how. It almost never adds up.
Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

When to Call a Professional

Not every windows and doors job needs a full contractor, but plenty do. Call a professional if the scope involves more than one or two openings, if any unit is a sliding or French door with frame replacement, if the existing frames show signs of water damage or rot, if you’re unsure whether the specified product carries current Miami-Dade NOA, or if your permit and inspection history on the property is unclear. Also call a professional if you’re planning windows as part of a larger envelope or exterior job, since sequencing matters more than most homeowners expect. Groundwork Construction Co. of Kendale Lakes offers free estimates in Kendale Lakes – call (844) 834-8961. We’ll walk through your scope, show you the realistic timeline stage by stage, and give you upfront pricing with no surprises.

Frequently Asked Questions

New double-hung windows in a dining room

What Other Exterior Projects Pair Well With Windows and Doors?

A windows and doors project is rarely the only thing a homeowner is thinking about. Once the permit clock is running and the install crew is scheduled, it’s a natural moment to plan the rest of the exterior with one contract. Roof replacement, driveway and pavers, fencing, and exterior paint are all common pairings, and sequencing them thoughtfully avoids tearing up fresh work.

  • Roof first, windows second. Roof installers need safe access and clear flashings near window heads; installing windows after roofing prevents damage to new window units during roof work.
  • Fencing with or after windows. New fence installs are often scheduled alongside, but timing the fence after window installation protects new fence panels from ladders and drop protection.
  • Driveway and pavers after installation. Heavy equipment and material delivery during window install can crack or dent new pavers; sequencing them last keeps the finish crisp.

When you’re coordinating multiple exterior trades, working with a single contractor who runs the full sequence saves both time and money. Look for current brand partners like GAF and CertainTeed on roofs and Sterling and Grohe on fixtures, so quality is consistent across every scope you tackle.

The Bottom Line

Installers setting a new window and checking it for level

Most homeowners hear “window replacement” and imagine the install days. In reality, install is the fastest part of the job. The full timeline from signed contract to final inspection runs 10 to 16 weeks in Kendale Lakes, driven by product selection, permitting, Miami-Dade impact product lead times, and inspection scheduling. Contractors who quote you a 4-to-6-week total are leaving something out. If you want a timeline you can actually plan around, one with every stage named and every brand specified, that’s the conversation we’re ready to have. Our team answers the phone live, any hour, and gives you pricing upfront so the only surprises left are good ones. Call (844) 834-8961 to schedule your free estimate today.

Written by the team at Groundwork Construction Co. of Kendale Lakes.

Getting started with Groundwork in Kendale Lakes

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Kendale Lakes team

A local vetted partner works across Kendale Lakes and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise
Need Construction help in Kendale Lakes? Licensed & insured · free written estimates
Call (844) 834-8961
Local Service Coverage

Request a Free Estimate in Kendale Lakes

Tell us what you need - Groundwork Construction Co. of Kendale Lakes responds fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Us
Call Now - 24/7 Dispatch