Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Concrete Driveways & Concrete Work in Kendall, FL: What to Expect
Concrete driveways & concrete work in Kendall, FL typically run $4,500 – $12,000 for a full driveway installation, with most single-family pours landing in the $6,500 – $9,000 range. Plan on roughly 4 to 7 days from demo to final cure, or about 2 weeks if you’re replacing an old slab and adding a widened apron. Call (844) 834-8961 for a free on-site estimate and a written line-item quote before you commit to anything.
Key Takeaways
- Most Kendall driveway pours fall between $4,500 and $12,000 depending on square footage, thickness, finish and access.
- Demo, grading, base prep and pouring usually take 4 – 7 days; cure time adds another 5 – 7 days before you drive on it.
- Miami-Dade permitting applies to new aprons and right-of-way work; a straightforward replacement usually doesn’t.
- Our work is covered by the 730-Day Done Right Promise, and pricing is fixed with no change orders.
How Groundwork Pours a Concrete Driveway in Kendall

Every job follows the same sequence, and here’s what actually happens on each one so you know what to expect. Our technicians have up to 12 years of experience running pours in South Florida’s heat and rain windows.
Day 1: Walkthrough, layout and demo
We mark the footprint with string and stakes, confirm the slope away from the house (you want roughly 1 inch of fall per 4 feet, no more), and pull the old slab if there is one. Demo on a standard two-car driveway takes a day with a skid steer and a dumpster on site. You decide here whether to widen the apron by a foot or two for a third parking spot – it’s cheaper to do now than later.
Day 2: Excavation and base prep
We dig down 6 to 8 inches, compact the subgrade, and lay a 4-inch compacted limestone base. This is the stage that separates a driveway that cracks in two years from one that holds for decades. In Kendall’s sandy soil we over-compact the subgrade and check for any buried irrigation or old footings. If you have an existing sprinkler line running under the path, this is when we relocate or cap it.
Day 3: Formwork, rebar and inspection
We set forms to the final grade, tie #3 rebar on a 24-inch grid, and add fiber mesh if the mix calls for it. If your driveway apron meets the county right-of-way, we pull the permit and schedule the inspection before pouring. This is the homeowner’s last full day to add a saw-cut joint pattern, a control joint layout, or a decorative broom finish before the concrete is ordered.
Day 4: The pour
We pour 4,000 PSI ready-mix (5 inches thick if you park a truck or RV), screed it flat, float the surface, and cut control joints within the first 12 to 24 hours. Finish options – broom, salt finish, light aggregate exposure – get applied while the surface is still workable. In a Kendall summer this pour happens early morning to beat the heat, because a 90-degree slab sets faster than you can finish it.
Days 5 – 14: Curing and final walkthrough
We wet-cure the slab for 3 to 5 days, keep weights off it for a week, and then do a final inspection with you: edges, joint lines, drainage away from the slab, and any cleanup of spills on landscaping. You get a written record of the mix design and the date to start parking on it.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Concrete Choices You’ll Actually Make
- Thickness: 4 inches handles cars; 5 inches is worth the extra $1.50 – $2.50 per square foot if you park trucks or a boat trailer.
- Finish: Broom is the standard and cheapest, run $0.50 – $1.00 per sq ft. Salt finish adds texture for about $1.50 – $3 more per sq ft. Exposed aggregate runs $2 – $5 more and hides stains better in Kendall’s sun.
- Reinforcement: Fiber mesh is a modest upcharge and helps resist shrinkage cracks; rebar is the belt-and-suspenders option for driveways that see heavy loads.
- Joint pattern: Saw-cut control joints at 8 – 10 foot intervals. Skip them and you’re inviting random cracks within a year.
- Color: Integral color adds $2 – $4 per sq ft and won’t fade as fast as surface stains. Neutral gray or sand tones read best against Kendall’s stucco and coral-rock facades.
If you want the full scope of a front-yard rebuild – new drive, walkway, patio, edging – that’s part of a full Driveway & Pavers in Kendall project, and we can bid the whole thing together.
What Concrete Driveways & Concrete Work Costs in Kendall, FL

Expect $4,500 – $12,000 for a concrete driveway installation in Kendall. Add-ons and site conditions move the number up or down more than any brand difference.
| Line item | Typical range |
|---|---|
| Concrete driveway installation (standard two-car, broom finish) | $4,500 – $12,000 |
| Driveway replacement (demo + new pour) | $5,000 – $14,000 |
| Widened apron or third parking pad | $800 – $2,500 |
| Decorative finish upgrade (salt, aggregate, integral color) | $2 – $5 per sq ft |
| Permit and inspection (right-of-way work) | $250 – $700 |
What moves the number to the high end:
- Square footage: Obvious, but it dominates – a 400 sq ft driveway versus an 800 sq ft driveway is roughly double.
- Existing slab removal: Demo and haul-off adds $1,500 – $3,500, and a slab that was buried under pavers or an unpermitted patio adds more.
- Access and drainage: Tight side yards, grading that needs a French drain or a swale, or a driveway that slopes toward the garage all add cost.
- Finish and thickness: A 5-inch aggregate driveway can climb $3,000 – $4,500 above a 4-inch broom slab.
- Permit scope: Aprons meeting the county right-of-way require engineered details and inspection, and that work carries its own line item.
A written estimate from us covers demo, base, rebar, pour, finishing, joints, cleanup and final walkthrough. It does not cover landscaping repair from demo traffic, irrigation relocation, or sod replacement unless you ask us to quote it up front. Upfront pricing means the number you see is the number you pay, and the 730-Day Done Right Promise backs the workmanship in writing.
See the difference
Before
After
Before
After
Before
AfterWhat Kendall Homes Specifically Do to This Job
Kendall’s stock of 1970s-to-1990s concrete-block homes throws two curveballs at a new driveway pour. The first is buried work: plenty of homes in Kendale Lakes and The Hammocks have unpermitted enclosed patios or converted garages that surface when a driveway apron inspection triggers a code review under Miami-Dade’s product approval rules. We’ve pulled up more than one old slab to find a footing or a capped line that wasn’t on any drawing – so we walk the footprint and probe before we promise a number. The second is drainage. The sandy, high water-table soil in ZIP 33176 doesn’t drain the way a lot of Northern transplants expect, so we pitch the slab away from the house, add a swale at the street if needed, and check that neighbors’ runoff won’t sheet across your new drive during a summer storm. Hurricane-exposure standards under the High-Velocity Hurricane Zone requirements also mean edge-of-right-of-way work gets engineered details, and a straightforward backyard patio pad doesn’t.
If your project also touches the rest of the yard, homeowners often pair this with ADU Site Prep & Utilities in Kendall, which handles the grading, trenching and utility layout at the same time so the equipment only digs once.
Serving Kendall, FL – Our Local Coverage Area
We serve Kendall and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – Concrete Driveways & Concrete Work in Kendall

Most full installations run 4 to 7 working days, plus 5 to 7 days of cure time before you drive on it. Rainy-season afternoons can push the pour by a day or two, so we don’t promise a fixed completion date in advance. Call (844) 834-8961 for a schedule based on your address and square footage.
Sometimes – and it depends on whether the apron meets the county right-of-way. A driveway poured entirely on your own property usually doesn’t need a permit; one that connects to the street apron does. We pull the permits, pass the inspection, and hand you the paperwork. Call (844) 834-8961 and we’ll tell you for your exact address.
Only if the existing slab is structurally sound and the grader can build it up without cracking the base. Overlay pours are cheaper ($2,000 – $4,000 less) but they raise the driveway about 2 inches above the garage floor, which most homeowners hate. We tell you honestly which you’re looking at after we inspect. Call (844) 834-8961 to schedule the walkthrough.
Most Kendall jobs land between $4,500 and $12,000, with a typical two-car broom-finish driveway running $6,500 – $9,000. Finish upgrades, thickness, and demo drive that spread. Call (844) 834-8961 for an exact quote – estimates are free.
Every driveway and concrete job is covered by our 730-Day Done Right Promise – if it’s not done right, we make it right, for two full years from completion. That’s one of the longest workmanship guarantees you’ll find in the residential construction space. Call (844) 834-8961 to have it laid out in writing before you sign.
Get a Free Concrete Driveway Estimate in Kendall
Concrete driveways & concrete work in Kendall, FL get bid on-site, and we don’t guess at a number over the phone – because on this job the soil, slope and access change everything. Call (844) 834-8961 and a live person picks up 24/7. We’ll walk the site, measure the footprint, check the permit question, and hand you a written line-item quote with 0% financing for 18 months available and $1,000 off projects over $10,000. Estimates are free. If you’re planning a broader front-yard scope, see our Driveway & Pavers work and our coverage across Kendall.
Written by the team at Groundwork Construction Co.