New Detached ADU in Fountainebleau, FL: What the Job Actually Takes
A new detached ADU in Fountainebleau typically runs $90,000 – $220,000 and takes 7 to 11 months from the first site visit to the final inspection. The structure is a fully separate, self-contained home on your lot: its own foundation, its own meter, its own impact-rated envelope. Because Fountainebleau sits inside Miami-Dade’s High-Velocity Hurricane Zone, every door, window, and roof-to-wall tie-in needs an approved NOA product before it goes in. Call (844) 834-8961 to set up your free on-site estimate.
How a Detached ADU Gets Built in Fountainebleau, Step by Step
The sequence below is what actually happens. Each stage has a decision attached to it, and those decisions drive both timeline and cost.
- 1
Stage 1: Site walk and feasibility (week 1). We come out, measure the lot, check setbacks, utility easements, and existing drainage. You decide where the ADU footprint goes. In a built-out suburb like Fountainebleau, the lot line is the constraint, not the design.
- 2
Stage 2: Design and permit submission (weeks 2 – 10). Architectural plans, engineering, and the Miami-Dade NOA product schedule for every impact window, door, and roof connection. You decide finishes now, because changing them later means a permit revision. This is the longest quiet stretch, and it’s where projects stall when the product schedule is incomplete.
- 3
Stage 3: Foundation, slab, and rough-in (weeks 11 – 18). Site prep, grade beams, slab, underground plumbing and electrical stubs. You decide the utility tie-in path, whether the ADU gets its own meter or sub-meter off the house. Inspections happen at the slab and the rough-in.
- 4
Stage 4: Framing, envelope, and wind-loading (weeks 19 – 28). Walls, roof framing, then the impact-rated openings and roof-to-wall connections that define HVHZ compliance. Framing and tie-in inspections run here. You decide roofline style, since flat and low-slope options change the waterproofing approach.
- 5
Stage 5: Finish-out and final inspection (weeks 29 – 40+). Drywall, trim, cabinets, fixtures, flooring, final mechanical and electrical inspections, certificate of occupancy. You decide fixtures and paint during this window, and that’s where schedules slip if selections aren’t locked two weeks ahead.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Options You’ll Be Choosing Between
Detached ADUs aren’t one product. The choices below are where the money lives, and each has an honest trade-off.
- Impact glazing vs. shutters: impact-rated windows and doors cost more upfront, but no storm-prep scramble and no shutter storage. Shutters are cheaper up front and require you or a tenant to deploy them before every named storm. For a rental unit, impact glazing is the practical call.
- Stick-built vs. modular: stick-built lets you match your house’s stucco and roofline and handles irregular lots. Modular can shorten the on-site calendar, but site delivery access and crane placement have to be verified in advance.
- Slab-on-grade with a low-slope roof vs. raised with a pitched roof: low-slope keeps cost down and matches much of the surrounding 1960s – 80s stock, but waterproofing and drainage detailing have to be right. A pitched roof sheds water better and reads more residential, at a bump in framing and finish cost.
- Kitchen and bath finishes: quartz surfaces such as Caesarstone hold up to humidity and tenant turnover better than laminate; Kohler and Moen fixtures are the practical mid-tier for a rental-grade unit, and Blanco sinks are a common finish upgrade.
- Metering and utility tie-in: a separate meter adds convenience and a small cost line; a sub-meter off the main house is cheaper but complicates future rental accounting.
What New Detached ADU Costs in Fountainebleau, FL

Expect $90,000 – $220,000 for a detached ADU in Fountainebleau, with most projects landing in the $110k – $170k band for a one-bedroom unit with impact glazing and standard finishes.
| Line item | Typical range |
|---|---|
| Design, engineering, permit | $6,000 – $18,000 |
| Site prep, foundation, slab | $14,000 – $32,000 |
| Shell, framing, low-slope roof | $30,000 – $60,000 |
| Impact windows and doors | $8,000 – $25,000 |
| Electrical, plumbing, mechanical | $12,000 – $28,000 |
| Interior finishes | $15,000 – $45,000 |
Five variables push a job to the high end: unit square footage, whether the lot needs drainage or grade work, how far utilities travel to the tie-in, glazing and finish grade, and how much of the permit scope runs through structural and wind-loading engineering. A written estimate will itemize every one of those lines. It won’t always cover landscaping, fencing around the ADU, or extending the driveway to reach it – homeowners often pair this with Concrete Driveways & Concrete Work in Fountainebleau or Paver Driveways in Fountainebleau to give the unit its own access, and neither belongs inside the ADU line. Our pricing is upfront, the number you sign is the number you pay, and projects over $10,000 qualify for $1,000 off plus 0% financing for 18 months.
See the difference
Before
After
Before
After
Before
AfterWhat Fountainebleau Homes and Codes Do to This Job
Fountainebleau is a built-out west Miami-Dade suburb, and that fact shapes the whole job. Lots are tight, the lots are largely developed, and you’re adding a second dwelling inside an existing neighborhood rather than building on open land. That means setback measurement, drainage, and the utility tie-in path get decided against neighbors and easements, not open ground. The surrounding housing stock (1960s – 1980s ranches alongside low-rise multifamily and the commercial strips along the Palmetto and Flagler corridor) means we regularly find aging utility laterals and drainage patterns that have to be worked around.
The bigger local factor is code. Every ADU project here runs through Miami-Dade County’s High-Velocity Hurricane Zone permitting, which means an approved NOA for every impact window, door, and roof-to-wall connection, and inspections at each stage. The process takes months, not weeks, and skipping product approvals causes revision cycles that push schedules. That’s why we lock the product schedule during design. Wind-loading, water intrusion, and sun/UV degradation are the failure modes we build against, because the envelope has to hold in May – November storm season. Permits are pulled and inspections passed before we close out; our technicians have up to 12 years of experience on this work. We cover Fountainebleau and the surrounding neighborhoods, and if your project is broader, it threads into Home Additions & ADU in Fountainebleau and our wider Home Additions & ADU service.
Serving Fountainebleau, FL – Our Local Coverage Area
We serve Fountainebleau and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked Questions

Plan on 7 to 11 months, with design and permitting typically taking the first 8 to 10 weeks on their own. The HVHZ permit and inspection cycle is the biggest variable, so start there and lock finishes early. Call (844) 834-8961 for a realistic schedule for your lot.
Yes. Miami-Dade County requires permits for the structure, electrical, plumbing, and mechanical, and every impact product needs an approved NOA. We pull those permits and pass the inspections; you don’t handle the paperwork. Call (844) 834-8961 with questions about your specific lot.
Yes, that’s the point of a detached unit: it’s a standalone structure with its own foundation and its own utility run to the property line, so the main house usually isn’t touched. The cost variable is the length and route of that utility run, not any change to your home. Call (844) 834-8961 to talk through your layout.
A straightforward one-bedroom unit with a simple slab, low-slope roof, standard impact glazing, and mid-grade finishes can land near $90,000. The high end, around $220,000, reflects larger units, complex site work, and premium finishes. Call (844) 834-8961 for an exact quote, and estimates are free.
Every project we build is covered by our 730-Day Done Right Promise, and the workmanship is backed in writing. If something isn’t right after close-out, we make it right. Call (844) 834-8961 to go over what your project covers.
Get Your Free Detached ADU Estimate
We’ll come to your Fountainebleau lot, measure the setbacks, talk through the utility path, and hand you a written, line-item estimate for your New Detached ADU. Calls are answered by a live person around the clock, not a voicemail. Our technicians are background-checked and arrive in uniform, and every project carries our 730-Day Done Right Promise. If you’ve been quoted a number that didn’t explain itself, bring it: comparing estimates is free. Call (844) 834-8961 today to schedule yours.