A Groundwork company - serving Kendale Lakes, FL
A new rear addition with a vaulted beamed ceiling and tall windows
ADU Site Prep & Utilities · Sunset, FL

ADU Site Prep & Utilities in Sunset - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Kendale Lakes
A single-story rear room addition with tall windows and a new patio
A second-story addition that matches the existing roofline
A galley kitchen opened up to the dining room with a new peninsula
A walk-in shower with large-format tile and a built-in niche
A standing-seam metal roof over a covered porch
A new bay window with a cushioned seat
A new wood side gate with black hardware
A new concrete driveway with a paver border
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

ADU Site Prep & Utilities in Sunset, FL: What the Ground Work Actually Costs

ADU site prep and utilities in Sunset typically runs $45,000 – $130,000 for the sitework side of a detached unit, covering grading, foundation, water and sewer tie-ins, electrical service, and the trenching and inspections that connect them. Most of these builds take 6 – 12 weeks from first shovel to final inspection, and the county review is often the longest single stretch. Call (844) 834-8961 to schedule a free on-site estimate and get a written line-item scope before anything gets dug.

Call (844) 834-8961

How the work actually runs, stage by stage

A remodeled family room with new windows and a window seat

Site prep and utilities aren’t a single trade. They’re a sequence, and each stage unlocks a decision before the next one can start. Here’s the order we work in on a Sunset ADU.

Stage 1: Site survey and utility locates (days 1 – 3)

Before anyone turns a shovel, we call in the utility locate so we know exactly where the existing water, sewer, electric, and any old drain lines run under the lot. In Sunset, where lots are tight and many homes have been expanded over the decades, we often find undocumented lines from an older remodel. You decide here whether the new service will tie into the existing meter panel or need its own dedicated service drop. That one decision can swing the budget by $4,000 – $9,000.

Stage 2: Clearing, grading, and drainage (days 3 – 9)

We clear the footprint, strip the topsoil, and grade the pad to drain away from both the ADU and the main house. Given Sunset’s heavy summer rain and hurricane season, drainage is not optional. We set the finish floor elevation and build in the positive slope needed so water runs off, not into the slab. You’ll approve the pad location and elevation at this point, before any concrete gets poured.

Stage 3: Foundation and slab (days 9 – 20)

Most ADUs here sit on a monolithic slab or a stem-wall foundation, depending on soil and the unit’s weight. We form, set rebar, pour, and let it cure. This is where the wind-load and structural tie-ins get locked in, and where a Miami-Dade inspector will look closely. Roughly ten days of this stage is cure time, and there’s no rushing it.

Stage 4: Underground utilities and trenching (days 20 – 35)

This is the heart of the job. We trench for water, sewer (or a septic tie-in, depending on the lot), electrical conduit, and often low-voltage for data and security. We run the lines, set the sleeves through the foundation, and backfill. You’ll decide at this stage whether you want a separate electric meter for the ADU or a subpanel fed from the main house. Separate metering is cleaner for future rental use but adds cost and a second utility account.

Stage 5: Rough-in inspections and final connections (days 35 – 50)

Once the lines are in and the conduit is set, the county inspects the underground work before it’s covered. We schedule those inspections, correct anything flagged, and make the final connections to the main service. After that, the ADU trades can move in and start framing. Getting the inspections right the first time is what keeps the schedule from slipping, and it’s the part homeowners can’t easily DIY.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The options you’ll choose between

  • Slab versus raised foundation: A slab is faster and cheaper, usually $8,000 – $15,000 for a typical unit footprint. A raised or stem-wall foundation costs more but handles uneven lots and keeps the floor above grade in a wet yard. On Sunset’s infill lots, slab is the common call unless drainage is a real problem.
  • Sewer tie-in versus septic: If the property already has a sewer connection, tying in is the simple path. If the lot is on septic, you may need a new drain field or an engineered system, and that alone can run $10,000 – $25,000. We check this before you commit to a design.
  • Dedicated meter versus subpanel: A subpanel fed from the main house is cheaper and simpler. A dedicated meter future-proofs the ADU for rental, but adds utility coordination and a second monthly bill. Think about how you’ll use the unit before you choose.
  • Utility trench depth and conduit grade: Deeper trenches and heavier conduit cost a bit more up front but protect the lines against settling and root intrusion. In a yard full of mature palms and oaks, it’s money well spent.

What ADU Site Prep & Utilities costs in Sunset, FL

A framer checking new wall framing on a home addition

Plan on $45,000 – $130,000 for the sitework and utility portion of a Sunset ADU, separate from the unit’s construction. The low end fits a straightforward lot with existing sewer and an easy electrical tie-in. The high end covers a difficult lot, a septic upgrade, a long utility run, and a dedicated meter. Here’s what moves the number:

  • Lot conditions and soil: Poor drainage or a high water table means more grading, fill, and foundation work. Add $6,000 – $18,000.
  • Distance from existing utilities: Every extra foot of trench and conduit adds cost. A unit set far back on the property line can add $5,000 – $12,000.
  • Sewer versus septic: A new septic system or drain field is the single biggest swing, up to $25,000.
  • Electrical service: A dedicated meter and new service drop versus a subpanel differs by several thousand dollars.
  • Permit scope: A Miami-Dade County review with multiple inspections adds fees and time. County submittal and inspection fees typically run $2,500 – $7,000 depending on scope.

A written estimate covers clearing, grading, foundation, trenching, line installation, and the coordination of inspections. It typically doesn’t cover the ADU structure itself, finish landscaping, or a new fence. Many homeowners pair this with Concrete Driveways & Concrete Work in Sunset to add a path or pad to the unit, and some add Paver Driveways in Sunset for a finished look. Call (844) 834-8961 for an exact quote, and estimates are free.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Sunset homes specifically do to this job

Sunset is an unincorporated community in Miami-Dade County, which means nearly every construction project here goes through the Miami-Dade County Building Department rather than a separate city hall. That adds layers of review, and it’s why we build the county timeline into the schedule from day one. The area’s housing stock, mostly 1950s – 1970s concrete block and stucco homes, means new utility work often has to tie into older structural and drainage systems that may not match original plans. Because the community sits under post-Hurricane Andrew building codes, wind-mitigation inspections and product approvals are stricter here than in many neighboring municipalities, so we plan for those checks up front instead of discovering them mid-build. The subtropical climate, with hot humid summers and afternoon thunderstorms, also shapes the calendar: we schedule pours and trench work around the daily rain and build waterproofing and mold prevention into the plan from the start. If your project grows into a full build, it’s easier to look at the whole scope through Home Additions & ADU in Sunset and line up every trade before the first shovel.

Serving Sunset, FL – Our Local Coverage Area

We serve Sunset and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently asked, ADU Site Prep & Utilities in Sunset

A remodeled kitchen with a waterfall island and wood cabinets

Get a free estimate for ADU Site Prep & Utilities in Sunset

Call (844) 834-8961 to schedule a free on-site estimate for ADU site prep and utilities in Sunset. On the call we’ll talk through your lot, check where the existing water, sewer, and electric run, and put together a written line-item scope with upfront pricing and no surprises. Our technicians have up to 12 years of experience, every project is covered by the 730-Day Done Right Promise, and a live person answers the phone any time. If you’re planning the wider project, start with our Home Additions & ADU service or see everything we do in Sunset.

Written by the team at Groundwork Construction Co.

Why Sunset Chooses Groundwork Construction Co. of Kendale Lakes

We set the standard for ADU site prep & utilities in Sunset.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Sunset

Getting your ADU site prep & utilities project started is simple.

1

Call or Request a Free Estimate

Tell us about your ADU site prep & utilities project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local ADU site prep & utilities pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Sunset Customers Say

Trusted by homeowners across Sunset and surrounding areas.

★★★★★

"He pulled the permits himself, scheduled every sub and ran the inspections. I made one decision a week and otherwise stayed out of it, which is exactly what I was paying for."

Robert Sullivan
★★★★★

"Found unpermitted work by the previous owner once he opened the wall. He stopped, explained the options and what each would cost, and let me decide rather than making it my emergency."

Marco Castillo
★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A new front yard fence with a matching gateA new paver pool deckAn open kitchen and dining area after a remodelA freestanding soaking tub in a remodeled primary bathroomA newly finished roof with a ridge vent and step flashingA new front entry door with glass sidelights

More services in Sunset

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Kendale Lakes

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Kendale Lakes team

A local vetted partner works across Kendale Lakes and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for ADU Site Prep & Utilities in Sunset?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Sunset.

(844) 834-8961

Request a Free Estimate in Sunset

Tell us about your ADU site prep & utilities needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Us
Local Service Coverage
Call Now - 24/7 Dispatch